PC 4.b) and CC 6.b) Draft Ordinance No. 12 X, and Comprehensive Plan Amendment, Captial Improvement Program Update 2010-2014 Meeting Date: 11/3/2010
Agenda Item: �C � f��
Plannin Commission/ � � � � ��
9
City Council Agenda Report
City of Scandia
14727 209�' St. North
Scandia, MN 55073 (651) 433-2274
Action Requested: Hold a public hearing on the 2011 to 2015 City of Scandia Capital
Improvement Program (CIP), including amendments to the adopted
2010-2014 CIP, a proposed amendment to the 2008-2030
Comprehensive Plan (Appendix F.)
Deadline/Timeline: The CIP is typically updated annually,before the City Council adopts
the budget in December.
Background: • The City adopted its Comprehensive Plan on March 17, 2009. As
required by state law, the plan included a five year(2009-2013)
CIP for major infrastructure needs. The CIP was amended in
December of 2009 to update it for the 2010-2014 period.
• Because the CIP is a required element of the Comprehensive Plan,
changes must be adopted using the same procedure as an
amendment to the plan, including a public hearing by the Planning
Commission.
• The draft CIP prepared for the hearing was based on input from
the Capital Improvements Committee, and from direction received
from the City Council during their August budget meetings.
• The updated CIP assumes two changes that affect 2010
expenditures, which should be considered part of the amendment.
They are described in detail on page 2 of the draft CIP. The two
changes relate to Wind in the Pines Park (PR-002) and
replacement of mower attachments for the John Deere Tractor.
(PW-007 &PW-008.)
� Changes recommended for 2011 through 2015 are described in the
draft CIP. One of the most significant changes recommended is
that replacement of the 1997 Ford 8000 Dump Truck with Plow
(PW-006)has been moved up from 2012 to 2011. Recent
mechanical failures have raised concern that the current truck is
not reliable. The intent would be to replace the truck as soon as
possible with a tandem-axel dump truck with plow.
Page 1 of 2
10/26/10
Recommendation: The Planning Commission should hold the hearing and make any
recommendations you may have to the City Council. The Council
may adopt the amended CIP by adopting the draft resolution provided.
Council approval requires a 2/3 majority(3 votes of a 4-member
Council or 4 votes of a 5-member Council.)
Alternatively, the Council could defer action on the Commission's
recommendations until a future meeting. (A Council work session on
the 2011 budget is scheduled for Tuesday, November 9.) The
amended CIP should be adopted prior to or at the same time as the
2011 budget.
Attachments/ • Draft Resolution No.: 11-03-09-03
Materials provided: . Capital Improvement Plan (CIP), Draft for Public Hearing
Contact(s):
Prepared by: Anne Hurlburt, Administrator
(CIP Hearing 1]_3_10)
Page 2 of 2
10/26/10
CITY OF SCANDIA
RESOLUTION NO. 11-03-10-03
RESOLUTION AMENDING THE 2008—2030
SCANDIA COMPREHENSIVE PLAN
WHEREAS, on March 17, 2009 the City of Scandia adopted a 2008 — 2030
Comprehensive Plan, to guide the future of the community and to tneet the requirements of the
Metropolitan Land Planning Act; and
WHEREAS, the Comprehensive Plan included a Capital Improvement Program (CIP)
for the years 2009 through 2013, which is Appendix F to the plan; and
WHEREAS, on November 3, 2009, the Plan was amended to adopt a revised Capital
Improvement Program (CIP) for the years 2010 through 2014; and
WHEREAS, following a duly noticed public hearing and recommendation of the Scandia
Planning Commission, the City Council has determined that amendments to the CIP are
necessary to extend the CIP through the new planning period of 2011 through 2015;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SCANDIA, WASHINGTON COUNTY, MINN�SOTA, that it should and hereby
does adopt the 2011 through 2015 Capital Improvement Plan (CIP), and that the document made
part of this resolution as "Exhibit A" shall replace Appendix F of the Comprehensive Plan
adopted March 17, 2009 and amended on November 3, 2009, in its entirety.
Adopted by the Scandia City Council this 3rd day of November, 2010.
&kq:+ f�,
.� ��
Dennis D. Seefeldt, Mayor
ATTEST:
,�;,: ,,
City Clerk/Administrator
�
' �i
._-
j
�t'�r`"`��\ �.----� �'__�
�.. ��,....� ..L_,'. '�. L_ �)
1
SCAl'�TDIA
City of Scandia
Capital Improvement Program
� 2011 — 2015
D�aft fo� Public Hearing
November 3, 2010
�
�
CONTENTS
Introduction
What is a CIP and Why Have One?.................................................................................1
Scopeof the Draft CIP.....................................................................................................1
FundingSources ..............................................................................................................2
Amendments to 2010-2014 CIP
. ........................................................................................................................................2
2011-2015 CIP Overview
Street Maintenance Program............................................................................................3 �
EquipmentReplacement Fund.........................................................................................3
ProjectPriorities ..............................................................................................................5
Project Highlights by Department...................................................................................5
CIP Summary Data
Projectsby Year, 2011 thru 2015....................................................................................8
Projects by Funding Source, 2011 thru 2015...................................................................10
Projects & Funding Sources by Department, 2011 thru 2015.........................................12
Sources and Uses of Funds, 2011 thru 2010, Equipment Replacement Fund.................14
Project Data
Project Listing, Active Projects from All Years..............................................................16
PendingProjects .................................:............................................................................18
Project Details, Active Projects 2011 thru 2015..............................................................19
�
ii
�
INTRODUCTION
The Capital Improvement Program (CIP) for the five-year period of 2011 through 2415 is the fourth
such document prepared by the City of Scandia, and was prepared based on input from the Capital
Improvements Committee appointed by the City Council. It amends the CIP included in the
Comprehensive Plan adopted on March 17, 2009 and amended November 3, 2009, replacing
Appendix F of the plan in its entirety.
What is a CIP and why have one?
A Capital Improvement Program, or CIP, is a multi-year(typically 5 years) capital expenditure plan
for a City's infrastructure (such as streets, parks and utility systems), vehicles, equipment and public
buildings. It identifies the major projects needed and desired by the community, their potential
costs and how they would be financed. Including a project in a CIP does not commit the city to that
project. The City Council must specifically authorize each one, and the associated funding, before
any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the
budgeting process) projects may go forward as planned, advance ahead of schedule, be removed
entirely, or new projects may be added, depending upon changes in circumstances and priorities.
The Minnesota Land Planning Act requires that the implementation plan portion of the
� Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water
supply, parks and open space) for a five-year time period. Cities often, however, expand the scope
of their CIPs to include other capital needs (ma�or equipment replacements, for example) and
sometimes look beyond the five-year time period, up to 20 years in the future for some projects.
Such projects represent more of a"wish-list"that can be evaluated each time the plan is updated.
As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter
473.865 provides that"a local governmental unit shall not adopt any official control or fiscal device
which is in conflict with its comprehensive plan." A fiscal device includes a budget or bond issue;
so it is important that the plan and CIP be kept up to date and in sync with city budgets.
The primary benefit of a CIP is as a financial planning tool, to help the city plan for the impact of
capital needs on future budgets and property taxes, and to help forecast the need for borrowing to
undertake major projects. The information developed as part of the capital planning process can
help document the need for various projects and help the City Council sort out competing priorities.
Scope of the CIP
The Capital Improvements Committee recommended that Scandia's CIP include all capital projects
that cost at least$10,000 and have a useful life span of tive years or longer. Projects include all
capital needs including major repairs to buildings and equipment purchases and
replacements. Any projects not meeting these parameters would be reviewed as part of the
� annual operating budget,but would not be included in the CIP.
1
Funding Sources
The CIP identifies a possible funding source(s) for each project listed. The various funding sources �
are as follows:
Capital Improvement Fund Existing City fund,primarily from property tax levy, set aside
for capital projects.
Debt Service Fund Projects financed by borrowing, later to be repaid with
property taxes, and potentially special assessments
depending upon the characteristics of the project.
Equipment Replacement Fund Internal service fund used to segregate funds set aside for
planned replacements of existing major eguipment. Funds
are transferred from operating budgets (primarily property
ta�r revenues.) The fund may also receive funds realized
through debt financing.
General Fund Annual operating budget,primarily funded by property tax
revenues.
Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park
dedication fees paid by developers and others who subdivide
their land.
In addition to these sources, it is possible that future projects could be funded from donations, �
grants, user fees or other sources not listed.
AMENDMENTS TO 2010-2014 CIP
The CIP update includes two changes that affect spending for 2010.
The adopted plan includes a 2010 project to spend $12,000 from the Park Capital Improvement
fund on signage and site furnishings ($2,000) and a management plan ($10,000) for Wind in the
Pines Park (Project PR-002.) The Park and Recreation Committee recommended that the city delay
the management plan, and instead spend $4,800 in 2010 on a site survey and boundary markers for
this pazk. They recommended delaying the sign until 2011, when they will request that signs be
built at two other parks (proposed in the General Fund budget.)
Another change affects the Equipment Replacement Fund. The adopted CIP anticipated a$22,000
replacement of the rear ditch mower attachment (Project PW-007) for the John Deere Tractor in
2010, and a$17,000 replacement of the boom mower attachment (Project PW-008) in 2011. At the
August 17, meeting, the Council approved replacement of the boom mower in 2010 at the cost of
$12,395. The rear ditch mower would be replaced in 2011. (The cost for that project has been
updated to $15,000 based on new information.)
�
2
� 2011-2015 CIP OVERVIEW
For 2011 through 2015, the draft CIP includes 20 separate projects with a total estimated cost of
over $5.5 million. All cost estimates are preliminary and based on current dollars. No assumptions
have been made about inflation. It will be important to refine and update costs when the plan is
reviewed, especially for projects in the first year or two of the plan.
Some projects beyond the five year planning period (2016-2030) are also included in the CIP. Most
of these projects are replacements for equipment and vehicles (such as fire trucks) which may have
a life span of 10, 15 to 20 years or even more. The plan also includes a list of"pending"projects,
for which a timeline (and in most cases, cost estimates) have not yet been identified. As more
information is developed about the need for, cost and possible funding sources for these projects,
they will be included in future CIP updates.
Street Maintenance Program
The 2007 CIP update identified the need for a pavement management plan to help the city monitor
road conditions and better understand the type of projects and funding levels needed to maintain the
investment that has been made in paved roads. This study was completed in 2008. The goal of the
plan is to extend the life of city streets and to reduce the lifecycle costs for maintaining them in
good condition. The study recommended a significant increase in resources devoted to road
maintenance.
� The 2009 budget was $204,000 for contractual road maintenance and repairs. Bids for a crack-
sealing project came in significantly less than projected. At the same time, the city needed to
absorb state cuts to Market Value Homestead Credit (MVHC) reimbursements. Therefore, the
actual amount spent was significantly less ($89,176) than the budget. In 2010, the budget was
increased to $250,000. The major project funded in 2010 was a seal coating project along with
pavement repairs by lane patching on Meadowbrook Ave. N. and 228�' St. N. ($162,760.)
For the 2011 budget, The Capital Improvements Committee recommended that the budget for
contractual road maintenance and repairs be increased to $300,000.
Fully funding the pavement management study's recommendation would require more resources.
The amount shown for 2012 and subsequent years is $600,000 for planning purposes, based on the
needs identified in the study. The amount actually available for the budget will be evaluated each
year. Due to current levy limits, the city will not be able to increase funding to that level without
investigating other funding options, such as assessments. In 2009, the Capital Improvement
Committee discussed assessment policies,but made no recommendations.
Equipment Replacement Fund
A major recommendation of the 2007 CIP was that the City should create an Equipment
Replacement Fund to set aside funds on an annual basis for planned replacement of vehicles and
major pieces of operating equipment. The fund was created in late 2007.
� The fund receives transfers from the operating budget of each department depending on its
equipment needs. This allows the deparhnental budgets for each major function to accurately show
3
the costs of funding that function, including equipment, while segregating the funds from the
operating budgets. Any revenues from the sale of old equipment being replaced are also deposited �
into the fund. Ideally, over time the fund would receive enough funds to be on a pay-as-you-go
basis. At a minimum, accumulating funds for future replacement needs will reduce need for
borrowing, and flatten spikes in the annual tax levy needed to pay for major purchases.
Just as for other capital projects, the decision whether or not to replace a particular piece of
equipment, and what to replace it with, will need to be made by the City Council at the time of the
purchase. The City could decide to keep some equipment longer than planned. Or, equipment
could wear out more quickly than expected. It is possible that some items will not be replaced, or
that new technology or equipment could alter plans to replace a particular item. The initial purchase
of new equipment will be considered as part of the annual operating budget, and once purchased,
future replacements would be added to the schedule.
When the Equipment Replacement Fund was created, it was estimated that for the first three years
the city would need to transfer$120,000 per year into the fund to "break even" and that amount
would need to increase to $150,000 each year thereafter. Even so, the fund would be at a deficit
and require the city to borrow some of the cost of some major equipment purchases. In each of the
years 2008 and 2009, the city budgeted $40,000 in transfers to the fund. In 2010, the budget was
increased to $80,000. The fund balance at the end of 2010 is forecasted to be $114,767 (after
planned replacements and considering the $200,000 borrowed to finance the majority of the cost of
the fire rescue truck replacement.)
For 2011, the cost of needed equipment replacements is estimated to be$234,500, about $120,000 �
more than the fund balance available. This shortfall is due to the need to replace a dump
truck/plow in the Public Works Deparhnent earlier than anticipated in the CIP. Recent mechanical
failures have raised a significant concern that the truck, one of the City's two major pieces of snow
removal equipment, may not be reliable. During preliminary discussions with the City Council at
the August budget meetings, staff was asked to review the draft CIP and budget to determine how a
purchase might be funded in early 2011.
The draft 2011 budget included operating budget transfers of$80,000 to the Equipment
Replacement Fund, the same as 2010. The draft budget also included $30,000 of revenue to the
Capital Improvement Fund, which will have a 2010 year-end balance of approximately$185,777.
There is only one project proposed from that fund in 2011, the city meeting/office space study
(Project A-0001, $18,000.)
In order to fund the dump truck replacement, staff suggests that the $30,000 revenue proposed to
the Capital Improvement Fund instead be allocated to the Equipment Replacement Fund, and that
an additional $10,000 from the Capital Improvement Fund be transferred to the Equipment
Replacement Fund.
�
4
�
Equipment Replacement Fund
The chart at the right shows the cash flow so��-zozo
to the E ui ment Re lacement Fund sso,000 per Year Funding Level
q p p (sxcePt2fN1)
assuming that revenue is increased to s400,o00
$120,000 cover the purchases $soo,000
recommended for 2011, and that the city
continues to allocate $80,000 per year to $Zoo,000
the fund for the remainder of the next ten- a�oo,000
year period. Because of the large a0
purchases currently planned for the next -a�oo,000 Zo„ a,2 Zo,3 Zo,4 so,s Zo,s Zo,� zo,a zo,s
three years, there is a large funding gap. -$Zoo,000
As in 2010,borrowing will probably be _;300,000
necessary. The timing and cost of
replacing the equipment will need to be -Eaoo,000
carefully evaluated. -a5oo.o00
-$600,000
Ysar �TMaI$R�plec�m�nh
o Funding
��Y�er End Fund Belencs
Project Priorities
Capital improvement projects should be prioritized in some way so that limited funding can be allocated
� to those which are most important. This is difficult because the varying nature of the projects and their
benefits and objectives are so disparate as to be essentially not comparable. Some public agencies ha�e
developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may
have some disadvantages because they may give a false sense of objectivity or precision to the priority
setting process. Others use simpler systems,or simply do not try to compaze projects that are like"apples
and oranges." There is no accepted system or"industry standard"for prioritizing projects.
The Capital Improvement Committee developed the following priority rating system in 2008,which was
also used for the 2009 update:
A Critical or urgent,high-priority projects that should be done if at all
possible; a special effort should be made to find sufficient funding for all
of the projects in this group.
B Very important,high-priority projects that should be done as funding
becomes available.
C Important and worthwhile projects to be considered if funding is
available;may be deferred to a subsequent year.
D Less important,low-priority projects;desirable but not essenrial.
N/A Used for replacements of existing equipment.
�
5
Project Highlights by Department
Administration—A study of city meeting and office space needs (A-001) is proposed for funding in �
2011, with timing and costs for implementation to be determined later. Several pending projects
(no date or cost estimate) are also listed (a community sign, improvements to the Annex, and City
Hall expansion.)
Community Center—Replacement of flooring (CC-001) is proposed for 2011. At the
recommendation of the Capital Improvement Committee, the proposed irrigation system (CC-004)
has been changed to a"pending"project. The Committee also recommended adding a pending
project for the Hilltop Water Company Barn (CC-005) as a pending project.
Fire—Most of the Fire Department projects are replacements of equipment and Fire Hall
components (HVAC, roof, well pump, etc.) The next vehicles scheduled for replacement are
Tanker 5711 (F-011) in 2012 and Engine 5180 (F-012) in 2013. The project to contribute to a new
civil defense siren in Big Marine Lake Park Reserve (F-009)has been moved to 2015. Based on
their recently updated master plan, Washington County does not expect to install a siren until such
time as campgrounds are developed which is likely to be 4 or 5 years in the future.
Ice Rink—The Zamboni will need to be replaced at some time, currently listed for 2014.
Parks and Recreation—Lilleskogen and Wind in the Pines Parks, the priority projects of the Park
and Recreation Committee, are proposed for funding over the next several years. Availability of
funds from the Park Capital Improvement Fund will be a major limiting factor. A grant that would �
have funded some work in Lilleskogen in 2010 was not approved, so it has been moved to 2011 and
later years and is dependent on finding a funding source.
Requests for improvements to the lighted ball field were added last year: renovation of the infield
has been listed for 2012, and other improvements (restrooms, scoreboard, etc.) are listed in the
"pending" list. No cost estimates have been prepared for either of these projects. The list of
projects for 2016 and after includes two park projects: an athletic field and playground equipment,
both at Hay Lake/Lions Park. Other"pending"projects include trail acquisition and development
and playground replacements.
A project to construct a new, permanent skateboard park (PR-005) was added in 2008. The Capital
Improvement Committee recommended a change in the priority rating of this project from "B"to
"D" and that its status be changed to "pending."
Public Works—The ongoing street maintenance program (PW-001) is the largest project in the
plan for 2011, at $300,000. The Capital Improvement Committee recommended an increase from
the $250,000 funding level in 2010.
Paving most of the remaining gravel roads is the largest single project in the CIP (PW-001, $1.775
million.) The draft plan continues direction given by the City Council in 2009 to begin design no
earlier than 2012 with most construction in 2013.
�
6
The remaining Public Works projects are equipment replacements. In 2011, in addition to the ditch
• mower, staff is recommending replacement of the 1995 GMC pickup and plow. This truck was not
previously on the replacement schedule. After a"replacement"pickup/plow was purchased in
2008, the old one was retained. Staff found that having two pickups with plows has been invaluable
during snow events. They are more efficient for plowing parking lots, smaller streets and cul-de-
sacs than the large plow trucks. We can keep the plow trucks on the through streets and accomplish
snow removal more quickly. The 1995 GMC is rusted and wearing out. Safety is a concern
because carbon monoxide leaks into the cab. The $27,500 cost estimate is based on state contract
pricing and includes sales tax, plow and all needed accessories.
As discussed on page 4,replacement of the 1997 Ford 8000 Dump Truck with Plow(PW-006)is also
recommended in 2011. The City's"fleet"of equipment for snow removal consists of two dump trucks
with plows,two pick-up trucks with plows,and a small tractor equipped with a snow blower. With 90
miles of roads to plow,plus parking lots and sidewalks,all of this equipment must be in service in order
to remove a typical snowfall within a reasonable time period.
The two plow trucks were scheduled to be replaced in 2012(the 1997 Ford)and 2014(the 2002
Sterling.) Originally,the Ford had been schaduled for replacement in 2009(a 12-year life cycle)but that
was lengthened to 15 years. (The Sterling is still listed with a 12-year service life.)
The current plow trucks are both single-�le trucks. When the replacement schedule was initially
created,the then-Maintenance Supeivisor recommended against a tandem truck due to a concern about
turning in narrow streets and cul-de-sacs. However,our plowing practices ha�e evolved to using two
pick-ups with plows in righter turning situations. The current staffnow believes that replacing one of the
� two single-axle vehicles with a tandem truck would be advantageous. It would carry almost double the
load of sand and gravel,which would be useful in both the winter and summer months and save staff
time.
Staffobtained an updated cost estimate based on state contract pricing. T'he total cost in 2011 for a fully-
equipped tandem truck is estimated at$192,000 after the trade-in. A single-axle truck is estimated at
$184,000 after the trade-in.
Capital Improvement Program Summary and Project Data
The following worksheets were prepared using Plan-It, a software tool purchased to assist with the
capital improvements planning process. Many additional reports can be produced to display this
information, if desired. Summary data sheets show the projects proposed in each year from 2011
through 2015, as well as by department and proposed funding source.
�
7
City of Scandia, Minnesota
Capital Improvement Program
2011 � 2015 �
PROJECTS BY YEAR
Project Name Department Project# Priority Project Cost
20�
City Meeting/Otfice Space Study Administration A-001 3 18,000
Community Center Interior Improvements—Flooring Communiry Center CC-001 3 10,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 12,300
Wind in the Pines Park Parks and Recreation PR-002 3 2,000
Street Maintenance Program Public Works PW-002 1 300,000
1997 Ford 5000 Dump Truck wlPlow Replacement Public Works PW-006 n/a 192,000
Tiger Ditch Rear Mower Replacement Public Works PW-007 2 15,000
Pickup w/Plow Replacement 1995 GMC Public Works PW-014 2 27,500
Total for 2011 576,800
2012
Tanker5177 Replacement Fire F-011 n/a 180,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 143,075
L'ghted Ball Field Improvements--Infield Parks and Recreation PR-007 3 0
Street Paving Public Works PW-001 2 385,000
Street Maintenance Program Public Works PW-002 1 600,000 �
Total for 2012 1,308,075
2013
Engine 5180 Replacement Fire F-012 Na 245,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 47,500
Wind in the Pines Park Parks and Recreation PR-002 3 10,000
Street Paving Public Works PW-001 2 1,390,000
Street Maintenance Program Public Works PW-002 1 600,000
Ozark Ave.Extension Public Works PW-003 3 333,333
Total for 2013 2,625,833
'- 2014
SCBA Cylinder Replacements Fire F-005 1 30,000
Zamboni Replacement Ice Rink IR-002 n/a 40,000
Lilleskogen Park Improvements Parks and Recreation PR-001 2 36,000
Street Maintenance Program Public Works PW-002 1 600,000
1999 JD-6410 Tractor Replacement Public Works PW-009 Na 60,000
2002 Sterling Dump Truck w/Plow Replacement Public Works PW-010 Na 184,000
Total for 2014 950,000
, 2015
Fire Station HVAC Replacement Fire F-001 2 15,000
Civil Defense Siren,Big Marine Lake Park Reserve Fire F-009 2 15,000
Grass Rig 5175 Replacement Fire F-013 Na 46,200 �
Total for 2015 76,200
Draft for Public Hearing Norember 3,2010
�-
Project Name Department Project# Priority Project Cost
• GRAND TOTAL 5,536,908
�
�
Draft for Publrc Hearing November 3,2010
��
City of Scandia, Minnesota
Capital Improvement Program
2011 thru 2015 �
PROJECTS BY FUNDING SOURCE
Source Pro,iect# Priority. 2011 2012 2013 2014 2015 Total
_---__
��Capital Improvement Fund
Ciry Meeting/Office Space Study A-001 3 18,000 18,000
Civil Defense Siren,Big Marine Lake Park Reserve F-009 2 15,000 15,000
OzarkAve.Extension PW-003 3 333,333 333,333
Capital Improvement Fund Total 18,000 333,333 15,000 366,333
_ _- --- - _ _ ,
'Debt Service Fund `
Street Paving PW-001 2 385,000 1,390,000 1,775,000
Street Maintenance Program PW-002 1 350,000 350,000 350,000 1,050,000
Debt Service Fund Total 735,000 1,740,000 350,000 2,825,000
� quipment Replacement Fund �
SCBA Cylinder Replacements F-005 1 30,000 30,000
Tanker5177 Replacement F-011 nla 180,000 180,000
Engine 5180 Replacement F-012 n/a 245,000 245,000�
Grass Rg 5175 Replacement F-013 n/a 46,200 46,200
Zamboni Replacement IR-002 n/a 40,000 40,000
1997 Ford 8000 Dump Truck w/Plow Replacement PW-DO6 n/a 192,000 192,000
Tiger Ditch Rear Mower Replacement PW-007 2 15,000 15,000
1999 JD-6410 Tractor Replacement PW-009 n/a 60,000 60,000
2002 SteAing Dump Truck w/Plow Replacement PW-010 n/a 184,000 184,000
Pickup w/Plow Replacement 1995 GMC PW-014 2 27,500 27,500
Equipment Replacement Fund Total 234,500 180,000 245,000 314,000 46,200 1,019,700
;General Fund `
Community Center Interior Improvements-Flooring CC-001 3 10,000 10,000
Fire Station HVAC Replacement F-001 2 15,000 15,000
Street Maintenance Program PW-002 1 300,000 250,000 250,000 250,000 1,050,000
General Fund Total 310,000 250,000 250,000 250,000 15,000 1,075,000
-- --- - -----__ _ __ __�
Grants/Donations
Lilleskogen Park Improvements PR-001 2 12,300 12,300
Grants/Donations Total 12,300 12,300
- -_ _ __ ,
Other/TBD �
Lighted Ball Field Improvements-Infield PR-007 3 0 0 �
Drajt for Public Hearing November 3,2010
! 0.
Source Pro.ject# Priority 2011 2012 2013 2014 2015 Total
Other/TBD Total � 0
i_ __ __ _ _ __
Park Improvement Fund �
Lilleskogen Park Improvements PR-001 2 143,075 47,500 36,000 226,575
Wind in the Pines Park PR-002 3 2,000 10,000 12,000
Park Improvement Fund Total 2,000 143,015 57,500 36,000 138,575
GRAND TOTAL 576,800 1,308,075 2,625,833 950,000 76,200 5,536,908
�
�
Draftfor Pu61ic Hearing November 3,20/0
//�
City of Scandia, Minnesota
Capital Improvement ProgYam
2011 tt,r„ 2015 �
PROJECTS & FUNDING SOURCES BY DEPARTMENT
Department Project# Priority 2011 2012 2013 2014 2015 Total
�,Administration �
City Meetingl0ffice Space Study A-001 3 18,000 18,000
Capitallmprovwnenf Fund 18,000 18,000
Administration Total 18,000 18,000
'Community Center �
Community Center Interior Improvements-Flooring CC-001 3 10,000 10,000
General Fund 10,000 10,000
Community Center Total 1Q000 10,000
!�Fire __ _ __ _. _ �
Fire Station HVAC Replacement F-001 2 15,000 15,000
General Fund 15,000 15,000
SCBA Cylinder Replacements F-005 1 30,000 30,000
EquipmenfReplacementWnd 30,000 30,000 �
Civit Defense Siren,Big Marine Lake Park Reserve F-009 2 15,000 15,000
Capitallmprovement Fund 15,000 15,000
Tanker5177 Replacement F-011 Na 180,000 180,000
Equipment Replacement Pond 180,000 180,000
Engine 5180 Replacement F-012 nla 245,000 245,000
Equipment Replacement Pond 215,000 215,000
Grass Rig 5175 Replacement F-013 n/a 46,200 46,200
Equipmenf Replacement Fund �QY00 �6,200
Fyre Total 180,000 245,000 30,000 76,200 531,200
Ice Rink �
Zamboni Replacement IR-002 n/a 40,000 40,000
Equipment Replacement Fund �0,000 �0,000
Ice Rink Total 40,000 40,000
arks and Recreation �
Lilleskogen Park Improvements PR-001 2 12,300 143,075 47,500 36,000 238,875
Gnnts/Donations 12,300 12,300
ParklmprovementFund 143,075 47,500 36,000 226,575
Wind in the Pines Park PR-002 3 2,000 10,000 12,000
Park Improvement Fund �,000 10,000 12,000
L'ghted Ball Field Improvements-Infield PR-007 3 0 0 �
Other/TBD 0 0
DraJt for Public Hearing November 3,2010
ia .
Department Project# Priority 2011 2012 2013 2014 2015 Total
Parks and Recreation Total 14,300 143,075 57,500 36,000 250,875
�Public Works �
Street Paving PW-001 2 385,000 1,390,000 1,775,000
Debf Service Fund 385,000 1,390,000 1,775,000
Street Maintenance Program PW-002 1 300,000 600,000 600,000 600,000 2,100,000
De6tServiceFund 350,000 350,000 ?50,000 1,050,000
GeneralFund 300,000 250,000 250,000 250,000 1,050,000
Ozark Ave.Extension PW-003 3 333,333 333,333
Capltallmprovement Fund 333,333 333,333
1997 Ford 8000 Dump Truck w/Plow Replacement PW-006 Na 192,000 192,000
Equipment Replacement Wnd 19z000 192,000
Tiger Ditch Rear Mower Replacement PW-007 2 15,000 15,000
Equipment Replacement Fund 15,000 15,000
1999 JD-6410 Tractor Replacement PW-009 Na 60,000 60,000
Equipment Replacemenf Fund 60,000 60,000
2002 Steding Dump Truck wlPlow Replacement PW-010 n/a 184,000 184,000
Equipment Replacement Fund 181,000 18I,000
Pickup w/Plow Replacement 1995 GMC PW-014 2 27,500 27,500
Equipment Replaeement Fund 27,500 27,500
Public Works Total 534,500 985,000 2,323,333 844,000 4,686,833
GRAND TOTAL 576,800 1,308,075 2,625,833 950,000 76,200 5,536,908
�
�
Draft for Public Hearrng Noi�ember 3,2010
�� i
City of Scandia, Minnesota
Capital Improvement Program ,
2011 thru 2020
SOURCES AND USES OF FUNDS
Source 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Equipment Replacement Fund �
Beginning Balance 114,767 267 (99,733) (264,733) (498,733) (464,933) (421,933) (341,933) (361,933) (296,933)
Revenues and Other Fund Sources
Revenue
Transferfrom General Fund 110,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
Transfer from Capital Improvement Fund 10,000 0 0 0 0 0 0 0 0 0
Tota! 120,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
Total Revenues and Other Fund Sources 120,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000
�
��'' Total Funds Available 234,767 80,267 (19,733) (184,733) (418,733) (384,933) (341,933) (261,933) (281,933) (216,933)
Expenditures and Uses
Capita[Projects&Equipment
Administration
Building Official Vehicle Replacement A-002 0 0 0 0 0 0 0 (15,000) 0 0
Total 0 0 0 0 0 0 0 (15,000) 0 0
Fire
Fire Department Radio Replacement F-003 0 0 0 0 0 0 0 (60,000) 0 0
SCBA Cylinder Replacements F-005 0 0 0 (30,000) 0 0 0 0 0 0
Tanker 5177 Replacement F-011 0 (180,000) 0 0 0 0 0 0 0 0
Engine 5180 Replacement F-012 0 0 (245,000) 0 0 0 0 0 0 0
Grass Rig 5175 Replacement F-013 0 0 0 0 (46,200) 0 0 0 0 0
Total 0 (180,000) (245,000) (30,000) (46,200) 0 0 (60,000) 0 0
Ice Rink
Draft for Public Hearing November 3,2010
� � �
Source � 2011 2012 201� 2014 2015 2016 2017 2018 2019 2DZ0
---- _ -- - -
!Equipment Replacement Fund � "
Zamboni Replacement IR-002 0 0 0 (40,000) 0 0 0 0 0 0 �I
Total 0 0 0 (40,000) 0 0 0 0 0 0
Public Works '
Pickup w/Plow Replacement 2008 Ford PW-004 0 0 0 0 0 0 0 (25,000) 0 0 I
John Deere Tractor Mower wlBroom&Blower Replace PW-00 0 0 0 0 0 (25,000) 0 0 0 0 �
1997 FoM 8000 Dump Truck w/Plow Replacement PW-0O6 (192,000) 0 0 0 0 0 0 0 0 0 I
Tiger Ditch Rear Mower Replacement PW-007 (15,000) 0 0 0 0 0 0 0 (15,000) 0 ,
Tger Boom Mower Attachment Replacement PW-0OS 0 0 0 0 0 (12,000) 0 0 0 0 II
1999 JD-6410 Tractor Replacement PW-009 0 0 0 (60,000) 0 0 0 0 0 0
2002 Sterling Dump Truck wlPlow Replacement PW-010 0 0 0 (184,000) 0 0 0 0 0 0
Pickup wlPlow Replacement 1995 GMC PW-014 (27,500) 0 0 0 0 0 0 0 0 0
Total (234,500) 0 0 (244,000) 0 (37,000) 0 (25,000) (15,000) 0
Total Expenditures and Uses (234,500) (180,000) (245,000) (314,000) (46,200) (37,000) 0 (100,000) (15,000) 0
�
,�� Change in Fund Balance (114,500) (100,000) (165,000) (234,000) 33,800 43,000 80,000 (20,000) 65,000 80,000
Ending Balance 267 (99,733) (264,733) (498,733) (464,933) (421,933) (341,933) (361,933) (296,933) (216,933)
Draft for Public Hearing November 3,20/0
City of Scandia, Minnesota
Capital Improvement Program
PROJECT LISTING �
Includes Projects from All Years
Administration �
Status Proiect# Proiect Name
Active A-001 City Meeting/O�ce Space Study
Active A-002 Building Official Vehicle Replacement
',Community Center `
Status Proiect# Proiect Name
Active CC-001 Community Center Interior Improvements-Flooring
Active CC-002 Community Center HVAC Replacement
Active CC-003 Community Center Roof Replacement
�-;_ _ _ _ 1
Fire
Status Proiect# Proiect Name
Active F-001 Fire Station HVAC Replacement
Active F-002 Replacement of Fire Dept.Air Compressor
Active F-003 Fire Department Radio Replacement
Active F-005 SCBA Cylinder Replacements
Active F-0O6 SCBA Air Pac Replacements
Active F-007 Fire Hall Roof
Active F-008 Fire Well Pump Replacement
Active F-009 Civil Defense Siren,Bg Marine Lake Park Reserve �
Active F-010 Rescue 5179 Replacement
Active F-011 Tanker 5177 Replacement
Active F-012 Engine 5180 Replacement
Active F-013 Grass Rig 5175 Replacement
Active F-014 Tanker5178 Replacement
Active F-015 Engine 5176 Replacement
'�Ice Rink -- `
Status Proiect# Proiect Name
Active IR-002 Zamboni Replacement
;Parks and Recreation �
Status Proiect# Proiect Name
Active PR-001 Lilleskogen Park Improvements
Active PR-002 Wind in the Pines Park
Active PR-007 L'ghted Ball Field Improvements--Infield
'�Public Works `
Status Proiect# Proiect Name
Active PW-001 Street Paving
Active PW-002 Street Maintenance Program
Active PW-003 Ozark Ave.Extension
Active PW-004 Pickup w/Plow Replacement 2008 Ford
Active PW-005 John Deere Tractor Mower w/Broom 8 Blower Replace
Active PW-0O6 1997 Ford 8000 Dump Truck w/Plow Replacement
Active PW-007 Tiger Ditch Rear Mower Replacement �
Active PW-008 Tiger Boom Mower Attachment Replacement
Active PW-009 1999 JD-6410 Tractor Replacement
Draft jor Public Hearing November 3,1010
! (� ..
Active PW-010 2002 Sterling Dump Truck w/Plow Replacement
Active PW-011 SalUSand Shelter
Active PW-014 Pickup w/Plow Replacement 1995 GMC
�
�
•
Draft for Public Hearing November 3,2010
/ /�
City of Scandia, Minnesota
Capital Improvement Program
�
PENDING PROJECTS
(Includes projects with a'Status'set to'Pending')
Project Name Department Project# Priority Project Cost
Pending
Communiry Sign Administration A-004 4 40,000
Communty Center Expansionl City Hall Administration A-005 3 0
Annex(Old Fire Hall)Improvements Administration A-003 4 0
Hilttop Water Company Bam Communiry Center CC-005 Na
Irrigation System Community Center CC-004 4 10,000
Fire ChiePs Car Replacements Fire F-004B Na 20,000
Second Fire Station Fire F-Of6 3 0
Fire Chiefs Car Fire F-004 3 15,000
Playground Equipment Replacement-Balifield Parks and Recreation PR-010 n/a 25,000
Hay Lake/Lions Park Athletic Field Parks and Recreation PR-003 4 39,000
Playground Equipment Hay LakelLions Shelter Parks and Recreation PR-004 4 25,000
Skateboard Park Parks and Recreation PR-005 4 75,000
Trail Acquisition and Development Parks and Recreation PR-006 3 0
Playground Equipment Replacement-Community Center Parks and Recreation PR-009 Na 25,000
Big Lake School Park Improvements Parks and Recreation PR-011 4 0
Bone Lake Park Improvements Parks and Recreation PR-012 4 0
Children's T-Ball Field Improvements Parks and Recreation PR-013 4 0
Village Center Pedestrian Connection Parks and Recreation PR-014 Na �
L'ghted Ball Field Improvements Parks and Recreation PR-008 4 0
Uptown Sewer System Drainfieid Replacement Public Works PW-013 Na
TOTAL 274,000
�
Draft for Publrc Hearing November 3,20/0
/� i
___ _ _ __ __ _ __ _
Project# A-��1 , Department Administration
Contact Administrator
'', Pro�e�t Na"'e City Meeting/Office Space Study �' TyPe Unassigned
� Useful Life IS years
Category Buildings
Priority C: Worthwhile
-- - ___
Descnphon I Total Project cost: $18,000
I Im rove/ex and/remodel meetin s ace fo_ __- ---- - ___ - - - - - __. ._ _ _ .__- ---- ______--
p p g p r City Council and office space for administrative staff. j
'Architectwal study would review short-term needs to reconfigure the existing city office space,as well as look at long-term needs(10-20 years)for expanded �
�
!building on Community Center site and possible remodelling of Annex(old Fire Hall.)
�---- --- - - ---- --- - - _--- -- ---_ _ __- - �
� --
I -------..--._ .____ _ ____ _____..�
Justification
- — -- --- —' _ _ — — —_ — _--- - —_ - _ - - _ _ _ —-
Existing office space is inefficient and lacks separation of public and private areas.
I Short and long-term"pe�manent"solutions are needed to the space issue solved temporarily by relocation of the sheriff deputy to the Fire Hail.
�Need to plan for long-term expansion needs for meeting space,public service,employee work areas and storage.
Expenditures 2011 2012 2013 2014 2015 Total
Planning/Design 18,000 18,000
Total 18,000 18,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Improvement Fund 18,000 18,000
Total 18,000 18,000
Project# CC-��1 Department Community Center
Contact Administrator
�Project Name Community Center Interior Improvements--Flooring Type Maintenance
_- ---- -----_ _
-- - ---- _
Useful Life 20 years
Category Buildings
Priority C: Worthwhile
�Description ' Total Project cost: $lo,000
�- - -- -_ __ - - - _ _ __ __ __ __ ----- --
eplace flooring in all public areas of Community Center. �
I2008 estimates--hall,bar,kitchen&heritage room:
�* Vinyl tile--$6,000
I* Ceramic--$15,000
i* Laminate--$23,000
* Carpet--$10,000
I�Replace flooring in Office and Board Room areas--$3,000 est.
- -- _— __,
� Jus6fication
----- _-- . . -- ,::J.. ___ _ _- ----;- -- ------------- _ ___ __ ---- ._ --
�Updaring and refreshing mtenor spaces�s necessary to keep center attractrve and suitable for hosting public and private events. Flooring in public areas is agmg and ',
ihas not been replaced since the building was constructed.
Expenditures 2011 2012 2013 2014 2015 Total
Construction/Maintenance 10,000 10,000
Total 70,000 10,000
Funding Sources 2011 2012 2013 2014 2015 Total
General Fund 10,000 10,000
Total �o,000 �o,000
�
Draft for Public Hearing November 3,2010
G Pr
Project i� �'-0�1 Department Fire
Contact Fire Chief
Project Name Fire Station HVAC Replacement Type Maintenance
_ . . . _ ----
__ _
Useful Life 15 years
Category Buiidings
Priority B:High priority
DesClipaOn , Total Project Cost: $15,000
_ -- - -- - - -- __
�Replace HVAC System at Fire Hall (2015p �
-- - --- -- _ - -- �
_ _ ---- --- --- --�
r Justification -- � '
r- -= -
-_ - - - -- --- ----
- -—-- --- ------ -- ---
----- -- �
Useful l�fe expected.
L - — _ __
Expenditures 2011 2012 2013 2014 2015 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2011 2012 2013 2014 2015 Total
General Fund 15,000 15,000
Total �5,000 �5,000
- _ _ _
__
Project# F-005 � Department Fire
Contact Fire Chief
Project Name SCBA Cylinder Replacements ' TyPe Replacement
__ - _ _
Useful Life 7 years
Category Equipmend Vehicles �
Priority A:Urgent,high prioriry
' DCSCriptiOIl Total Project Cosh $90,000
---- �_ _._ � -- - - . ---- _ _- -- — - ----- --_ _ - --- -- —
Replace SCBA cylmde�s that have reached the end of serviceable life. (2014,2021,2028) �
-------_ _ - --- __ i
�Justification �
— — ----- __ — _ _ .._
_ _ . _ __ — ___ _
�Necessary equipmenbt with OSHA mandated useful life.
Expenditures 2011 2012 2013 2014 2015 Total Future
EquipNehicles/Furnishings 30,000 30,000 60,000
Total 30,000 30,000 Total
Funding Sources 2011 2012 2013 2014 2015 Total Future
Equipment Replacement Fund 30,000 30,000 60,000
Total 30,000 30,000 Total
�
Draft for Public Hearing November 3,2010
�� .
_____ _
Project# F-009 Department Fire
Contact Administrator
Project Name Civil Defense Siren,Big Marine Lake Park Reserve TyPe New
� _--_ ___ --- -------- -- -
_ - -
Useful Life 40 years
Cstegory Equipmend Vehicles
Priority B:High priority
j DCSCriptiOri Total Project Cost: $15,000
i � -- -- - -- _ _.._ '--------- --- ---- --- __--_._ __ __ - ------__
Partner with Washw ton Coun and tentiall Ma Townshi to u rade civil defense siren in Bi Marine Lake Park Reserve. Coun arks staff indicate that �'I
g tY Po Y Y P Pg B tY P
;siren will probalby not be considered until construction of camping areas. Based on new park master plan,this project is five or more years in the futture. i
— --— _
;Justi�cation
!Public safety for park and lake users,lakesh - - - - - -- -- . ----- -- ---- -- - - —�
ore residents and semi-public recreation facilities(such as Vets Camp,Camp Lakamaga)on Big Marine Lake.
_- -------- ------- ___ _ _ _ --- ----_ __- - _------ __ __ - . ..- -- -- ----- - '
Expenditures 2011 2012 2013 2014 2015 Total
Construction/Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Improvement Fund 15,000 15,000
Total 15,000 15,000
�� Project# F-Ol l , Department Fire
' Contact F've Chief
Project Name Tanker 5177 Replacement �
_--- ---- _ _ _
; Type Replacement
� Useful Life 20 years
Category Equipment/Vehicles
Priority N/A
�- -- - - ___ ----- -
Description 'rocai rro�e�t cosc: S�so,000
;
---- --- —
�Tanker 5177 Replacement(2012) . . . -- -- -
� - —
- - ---- -- - ------- -
� --_- -
!i Jusafication
--�— —_
� _ — - -_ _— --- _ _ __ ___
-- --- - - _ _ -----
- -- -
Expenditures 2011 2012 2013 2014 2015 Total
EquipNehicles/Furnishings 180,000 180,000
Total 180,000 180,000
Funding Sources 2011 2012 2013 2014 2015 Total
Equipment Replacement Fund 180,000 180,000
Total 180,000 180,000
�
Draft for Public Hearing November 3,2010
af
; _ _ _ _ ___ _ _ _
, Project# r'-012 I Department Fire
Contact
Project Name Engine 5180 Replacement ' TyPe Replacement
-- ---- --__ _ _ __ _ _ _ _ �
Useful Life 25 years
Category EquipmenU Vehicles
Priority N/A
I .--:- ! Total Project Cost: $245,000
Descnphon
_=_=— -=_ _ _ _ ___ --- -
_ - - --- --
!Engine 5180 Replacement(2013)
Justification ;
--- _---—
Project# IR-002 Department Ice Rink
Contact
Project Name Zamboni Replacement TyPe Replacement
� - Useful Life 25 years
Category EquipmenU Vehicles
Priority N/A ,
Description i Total Project Cost: $40,000
�__--- __- -- ------ --- — �
. _— _ __ _ _ _
;Replacement of(used)Zamboni for outdoor ice rink �
�Current machine good for 5 years 2014) �
_ _—___- -----_ -- - - - �
__ _ . - -
- -__ --
�Justificahon �
: __ ---- �—a- ---- ------ _ _ ___ — - - ---
-_ — - _ �
�End of useful life of existing equipment.
Expenditures 2011 2012 2013 2014 2015 Total
Equip/Vehicles/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources 2011 2012 2013 2014 2015 Total
Equipment Replacement Fund 40,000 40,000
Total 40,000 a0,00o
�
�
Draft jor Public Hearing Noi�ember 3,2010
� � �
� - _ _ _ ---_ _ _
' Project# PR-��1 Department Parks and Recreation
Contact Park and Rec Committee
Project Name Lilleskogen Park Improvements TyPe Improvement
__ _ --- - ------ - �
Useful Life 20 years
Category Park Improvement
Priority B:High priority
--- -
DeSCriptioll Total Project Cost: S263,675
- --- - - - - ---- -- ----- - . --- -- - -- _ _ _ -_ -------
-- _ -
iPreliminary Cost Estimate from Lilleskogen Park Plan,January 2007&estimates from SRF Inc.,April 2008 ,
I �
;Phase 1,2009 (�24,800) �
�1. Site surveying and engineering for water control structure: $]3,800 i
;2. ConsWction/earthwork: $10,000
j3. Weed Management: $1,000
i
Phase2,2011
4. Vegetation Restontion $12,300
�Phase 3,2012($I43,075) !
5. Siteutilities: $8,000
'6. Bituminous and concrete pavement and boardwalk: $130,075
i7. Electrical(parking Iot security lighting) $5,000
;Phase 4,2013($47,500) ',
I6. Vegetation removals($21,500) '
�7. Landscaping/vegetation restorations($26,000)
Phase 4,2013 ($36,000) ;
8. Site fumishings(picnic shelter,tables,benches,signage etc.) '
�---- -- _ . _ __ 1
_ _ _ . _
_ _ _ -- - - - -- _
- __
'Justi�caflon ��
- --- -=-= :_ . _ ---------- -_ --- - --- -_ _. ---
------ _ _
#1 prionty of Park and Recreation Committee I
Park is gateway to village center;connection to pedesVian trails,accessible to school. I
_ _---------- - - -- - - - ,
Prior Expenditures 2011 2012 2013 2014 2015 Total �
24,800 Construction/Maintenance 12,300 143,075 47,500 15,000 217,875
Total EquipNehicles/Furnishings 21,000 21,000
Total 12,300 143,075 41,500 36,000 238,875
Prior Funding Sources 2011 2012 2013 2014 2015 Total
24,800 Grants/Donations 12,300 12,300
Total Park Improvement Fund 143,075 47,500 36,000 226,575
Total 12,300 143,075 47,500 36,000 238,875
�
Draft for Publrc Hearing November 3,2010
� �r
_ __ - .
Project# PR-O02 Department Parks and Recreation
Contact Park and Rec Committee
Project Name wind in the Pines Park TyPe Improvement
� Useful Life 20 years
Category Park Improvement
Priority C: Worthwhile
I DCSC1ipUOri Total Project Cost: $17,800
�_ _ --- --- -_._.. ----- - -- ___ _ _ _
___ __ . _
Site Survey and Boundary Markers-$4,800(2010)
Signage/fumishings--$2,000(2011)
Natural Resources Management Plan-- $]0,000(2013) �
I __ _ _-- ----- __.
Justitication i
�Stairs/trail i provement nceded to allow u –-- _ . __-_ - - -- --- --- _ __.___------- ----,
Second rio� of Park and Recreat�on Committee. I
� se of steep trail without erosion and keep users from trespassing on private property. J
Prior Expenditures 2011 2012 2013 2014 2015 Total
5,800 Planning/Design 10,000 10,000
Total EquipNehicles/Fumishings 2,000 2,000
Total 2,000 10,000 12,000
Prior Funding Sources 2011 2012 2013 2014 2015 Total
5,800 Park Improvement Fund 2,000 10,000 12,000
Total Total 2,000 10,000 12,000
-- _ _ _ _ _
Project# PR-007 Department Parks and Recreation
Contact
P''o�e��Ne"'e Lighted Ball Field Improvements--Infield I Type Maintenance
_ _ -- ___ __- - - --- -
Useful Life 20 years
Category Park Improvement
Priority C: Worthwhile
I Total Project Cost: $0
� Description �
—-- ---
- — -- ___ _ _ _---- - --- ___ __ _ -- _-- - ---- --�
IGrade and rebuild infield to correct dramage;grade and plant Vces behind west outfield feace.(Cost undetermined.) �
---------- --- —
'�Justification
- � , _ _ __ _ _ _ - ___ _ ____
IRequested by Scandia Softball Association.
Expenditures 2011 2012 2013 2014 2015 Total
Construction/Maintenance 0 0
Total 0 0
Funding Sources 2011 2012 2013 2014 2015 Total
Other/TBD 0 0
Total 0 0
�
Draft for Public Hearing November 3,2010
02 J f
_ _ _
Project# PW-OOI Department Public Works
Contact Engineer
Project Name Street Paving TyPe lmprovement
_ _ _ _--- - ---- - - - _ �
Useful Life 20 years
Category Road Paving
Priority B:High priority
DeSCrip6on Total Project Cost: $1,775,000
-— -- _=_ __- _-— -—--- -- - ----- --- - — --------- _ _ -
iPave remaming approximately 5.5 miles of gravel roads(Pilar,Paris,Pennfield,Perkins; 185th,Oakgreen,Old Marine Trail.). Minimum of 20%of total cost
�(portio�of bituminous)to be assessed to benefited property owners per policy.
'51,775,000 Total cost over 2 years.
IYear 1 (2012)($385,000) i
-- Cuivert replacement$100,000 I
-- Engineering/surveying/wetland permitting $250,000
-- Easement acquisition $35,000
'IYear2(2013) ($1,390,000) I�
-- Engineering/Admin etc. 5300,000
�,-- Construction $1,070,000
�-- Financing costs $20,000 I
- - - -- ___
Justification
L __-- _-_,_ ---—�-= -- - -- - — — -- _
_ - _ ___ ._�
r-- ---
Policy to pave existmg gravel roads;decreased maintenance costs for pavement vs.gravel roads.
Expenditures 2011 2012 2013 2014 2015 Total
Planning/Design 250,000 300,000 550,000
Land Acquisition 35,000 35,000
Construction/Maintenance 100,000 1,070,000 1,170,000
Other 20,000 20,000
Total 385,000 1,390,000 1,775,000
Funding Sources 2011 2012 2013 2014 2015 Total �
Debt Service Fund 385,000 1,390,000 1,775,000
Total 385,000 1,390,000 1,775,000
�
DraJt jor Public Hearing November 3,2010
�� /
--
Project# Pw-0�2 , Department Public Works
Contact Engineer
Project Name Street Maintenance Program ; Type Maintenance
� Useful Lite Variable
Category Road Reconstruction
Priority A:Urgent,high priority
I - - - Total Project Cost: $2,543,800
Description '
- - - -- - --
--- --- _- -- — --— ---- _ __ - -- - ---_ _------ ---- _---- --- -------
Ten-year rehab.Program including crack sealing and seal coat,reclaim and overlay,reconstruction,as recommended by 2008 Pavement Management Plan (2011- i
',2018,expenditures yet to be determined.) �
--- --- ----
i Justification I
-�_ _ - _- _ __=_---- -- ------------- -- ----�
IMaintain investment in paved roadways. In later years,assumes new assessment policy allowing debt financing of significant portion of rehabilitation and
reconstruction program. �
Prior Expenditures 2011 2012 2013 2014 2015 Total
443,800 Constr�ction/Maintenance 300,000 600,000 600,000 600,000 2,100,000
Total Total 300,000 600,000 600,000 600,000 2,100,000
Prior Funding Sources 2011 2012 2013 2014 2015 Total
443,800 Debt Service Fund 350,000 350,000 350,000 1,050,000
Total General Fund 300,000 250,000 250,000 250,000 1,050,000
Totat 300,00o so0,000 600,000 600,000 2,100,000
r i
, Project# Pw-��3 , Department Public Works
Contact Engineer
�Project Name Ozark Ave. Extension �, Type tv�
_ _ _ _._ _---_ _
Useful Life 20 years
Category Road Construction
Priority C: Worthwhile
�eSCriphOn I, Total Project Cost: $333,333
i_ —g__ ---- __- . g=J----- __ - - � �- ___---�--� _ - --_._- _ _ . _...___ _- -- -- -- ---,
New street se ment from end of existin Ozark Ave.to CR 52 Oakhill 33 miles 2013 i
IROW Acquisition,Construction all related improvements--$lmillion per mile. ,
May be partially assessed(?)
' Justification �
�
_ -- - ___ __ __ _ _
-—----------------- ---
Expenditures 2011 2012 2013 2014 2015 Total
Construction/Maintenance 333,333 333,333
Total 333,333 333,333
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Improvement Fund 333,333 333,333
Total 333,333 333,333
�
Draft for Public Hearing November 3,2010
��o
--- - _
Project# PW-OOG Department Public Works
Contact Morrison
Project Name 1997 Ford 8000 Dump Truck w/Plow Replacement TyPe Replacement
_ __ - - ----- -
Useful Lite 12
Category EquipmenU Vehicles
Priority N/A
Description To[ai Project Cos[: 5384,000
_- - ---- -_
1997 Ford 8000 Dump Truck w/Plow Replacement (201 l,2023) �
_ _ _ _ __
Justification
_ � ---- —---
_ - . -
� - __ _ --- - _-- - _ --- -�
�_ _ _ __ __ _ --- ._ _ __ �
Expenditures 2011 2012 2013 2014 2015 Total Future
EquipNehicles/Furnishings 192,000 192,000 192,000
Total 192�000 192,000 Total
Funding Sources 2011 2012 2013 2014 2015 Total Future
Equipment Replacement Fund 192,000 192,000 192,000
Total 192,000 192,000 Total
-- ----- -- _ _ _
_ _ ___ _ _ �
Project# Pw-0�7 I Department Public Works
; � Contact Morrison
,' p''o�e�t Ne"'e Tiger Ditch Rear Mower Replacement �I TyPe Replacement
Usetul Life 8
Category EquipmenU Vehicles �
Priority B:High priority
DeSCripbOII Total Project Cosr $45,000
-- ---- _ _ _-
— — - --- --- - _ _ _ _ _ _
LTiger Ditch Rear Mower Replacement (2011,2019,2027) _j
- - - - -- - - - - - -- ------ ------ ------
---- - - ,
��Justificaaon
=_= ---. _- -� _ ----- ----- ----- ---_
Useful life of aquipment. �
Expenditures 2011 2012 2013 2014 2015 Total Future
EquipNehicleslFumishings 15,000 15,000 30,000
Total 15,000 15,000 Total
Funding Sources 2011 2012 2013 2014 2015 Total Future
Equipment Replacement Fund 15,000 15,000 30,000
Tota! 15,000 15,000 Total
�
Drajt for Public Hearing Norember 3,2010
���
i
' Project# PW-009 Department Public Works
Contsct Morrison
Project Name 1999 JD-6410 Tractor Replacement Type Replacement
� Usetul Life IS years
Category EquipmenU Vehicles
Priority N/A
DeSClljlhOII Total Project Cost: $120,000
--- _-- --_ ---- - '--- - _ __
1999 JD-6410 Tractor Replacement(2014,2029) �
_-- -- --
I Justificaaon
I�--__ — - - ---------
-_ _ _--- - - ---- I
Expenditures 2011 2012 2013 2014 2015 Total Future
EquipNehicles/Furnishings 60,000 60,000 60,000
Total 60,000 60,000 Total
Funding Sources 2011 2012 2013 2014 2015 Total Future
Equipment Replacement Fund 60,000 60,000 60,000
Total 60,000 60,000 Total
- _ _ _-- _ -- ----
__ _
, Project# PW-010 ! Department Public Works
� Contact Morrison
'' p�°�e�t Ne"'e 2002 Sterling Dump Truck w/Plow Replacement , TyPe Replacement
_ _ __ _ _
Useful Life 12
� Category EquipmenU Vehicles
Priority N/A
� DCSC1iphOII , Total Project Cost: $368,000
__ —-- --_—
---_ - ---- ------ _ _
- ___ _ - --- _ _ - - -- - - -
2002 Sterling Dump Truck w/Plow Replacement(2014,2026) �
__.— — - _ --
_ - - -- — -- -
�us6fication . - _- j
� , —• =--
- ---
Expenditures 2011 2012 2013 2014 2015 Total Future
EquipNehicles/Furnishings 184,000 184,000 184,000
Totat 184,000 184,00o Total
Funding Sources 2011 2012 2013 2014 2015 Total Future
Equipment Replacement Fund 184,000 184,000 184,000
Total 184,000 184,000 Total
�
Draft for Public Hearing November 3,20/0
a � ,
�
-- _ _ _ _
Project# PW-014 �I Department Public Works
i Contact
: Project Name pickup w/Plow Replacement 1995 GMC I TyPe Replacement
_ - - - - - _______ _ -_ _ _ �
Useful Life 10 years
Category EquipmenU Vehicles
�-_ _ -- - ___ _
Priority B:High priority
DCSCriPhOII Total Project Cost: ,
= — - = _ =- - _ -___ __ __ _
_ _,
Replacement of 1995 GMC Pickup with Plow �
— _ __ - -- ---- --- --- --- ----------- --------
r -- — —_ __
'� Justification ;
. --__ -.:,-- -_- :
_-_- -- ------ ----- -�
iUseful life of equ�pment.. Used to plow small streets&cul-de-sacs
Expenditures 2011 2012 2013 2014 2015 Total
EquipNehicles/Furnishings 27,500 27,500
Total 2��500 27,500
Funding Sources 2011 2012 2013 2014 2015 Total
Equipment Replacement Fund 27,500 27,500
Total 27,500 27,500
�
�
Draft for Public Hearing Novem6er 3,1010
��i