8.d) 2014-9-16 Engineering UpdatesSCANDIA
Engineering
City of Scandia
Engineering Updates 9/16/2014
• 2014 Seal Coat work was completed along with the initial sweeping. The second
sweeping will be conducted mid part of September, and following shortly after, the
restriping of the 4" double yellow solid traffic line on various streets will be completed.
We have been notified of two hydraulic spills on the project areas. One was the
responsibility of the Seal Coat Contractor and when notified of the situation cleaned it
up the next day. Other location was caused by a private driveway and we are in the
process of obtaining their contact information.
• Currently assisting the City on the 2014 MPCA State Disposal Permit Reissue.