Loading...
8.d) 2014-9-16 Engineering UpdatesSCANDIA Engineering City of Scandia Engineering Updates 9/16/2014 • 2014 Seal Coat work was completed along with the initial sweeping. The second sweeping will be conducted mid part of September, and following shortly after, the restriping of the 4" double yellow solid traffic line on various streets will be completed. We have been notified of two hydraulic spills on the project areas. One was the responsibility of the Seal Coat Contractor and when notified of the situation cleaned it up the next day. Other location was caused by a private driveway and we are in the process of obtaining their contact information. • Currently assisting the City on the 2014 MPCA State Disposal Permit Reissue.