Loading...
8.c) City Engineer . , �= � � . �: . , � Cit of Scandia -=��r K ��_ :.�i:"� --�� , y . R i rF_,. � ..� _ ENGINEERING UPDA TE �C���L�►. january 2009 The purpose of this update is to provide you with information on various projects and engineering activities for the month. HIGHLIGHTS FOR TIME PERIOD 12/09/08 - 1/14/09. • 197th Street Drainage Improvements proposed by the Washington Conservation District has been reviewed and a cost estimate has been prepared. City Projects: 1. 2007 Street Pavin� • Two year wari•anty pei•iod e�1ds October, 2009. • No action taken this month. 2. Pilar Road • Reviewed maps and road easement information. Made list of issues we will encowlter with the Euture paving. Still gathering information on past surveys aild right-of-way along Pilar Road. • Worked on several drafts of the questions to ask residents and will have this for review by City Council on 5/20/O8. Once there is consensus on the questions, a letter questionnaire with self-addressed stamped envelop will be inailed. • The City Council has revie�n�ed the questionnaire that the residents have completed, no Council actions authorized to date. • No action taken this month. 3. Fire Hall Approach Aprons • Bonestroo pi•epai�ed cost opinions for alternatives to repair the south app�•oach apiron. The api-on is moving due to frost/soil moisture conditions. The information was presented at the 8/26/08 6udget workshop meeting. • City Staff was exploring opiions of mud jacking the aprons instead of the repair estimated Uy Bonesiroo. • No action taken this month. Private Developments: 1. Wyldewood Acres • Some landscaping items remain to Ue completed Uy the developer. • Cracked sidewalk at several locations along Odell- caused Uy developer's equipment. • No action taken this month. 568gen�Engineering Updatcs 1 , '. 2. Nature's Walk • Dea�� tref��� �n�er�� remr,ved and �-ep]aced in Tall 2007. � Lette�- ��f Cr�edii�: $7,5O0 for landscaping. • No action taken this month. 3. Wild Bush Acres • Lettcr of G•edit: $60,OC�0 for streets, $�,500 for Landscapi�l�. 3 1i•ees a�•e qi.aestio�lable. • Warranty inspection was completed on August 7, 2008 and a written inspectian notice will be prepared for the Developer to make the corrections. • The inspection noticed was delivered to the City of Scandia who then would coordinate tlle w��rk to be cori-ected with the Developer. • The City rel�ased the letter of credit for landscaping at the 10/0%�08 Council meeting. • No action taken this month. 4. The Sanctuary • Letter of Credit: On 10/4/05, amowzt was reduced to $9,375 f�r streets and $3,000 for landscaping. • Bonestroo prepared a letter feasibility report identifying the remai�ling project work, costs to complete the work, and assessment ainounts. City Council consideration at the 9/16/08 meeting includes receipt of the report, ordering the preparation of plans and oUtaining bids. • City Coiancil awarded the Contract for remaining puUlic i�nprovements at the 10/07/08 Cowicil ��eeting. A p�•e-construction ineeting has been scheduled for 10/17/08 at %:30 ain, on-site. • A Construcfiion Notice was delivered to the existing hoines inforn�ing tJze residents that the remaining work of the project will start the week of October 20, 2008. • All woi•k has Ueen completed and accepted. We have received IC 134's and lien waivers along with the Final signed Contractor's Request for Payment. The project has been completed and accepted. A one year warranty inspection �n�ill be completed in October 2009. • No action taken this month. 5. Willowbrook Church • No action taken this month. 6. Tii Gavo • On August 12, 2008 a review of the project site was completed and a meeting ��as held with the City, Developer, Developer's Engineer, and Bonestroo to discuss the Letter af Credit reciuction request suUmitted Uy the Developer. Bonestroo has pi~epar�d a cor�struction cost opinion for the construction remaining to b� completed and prepared a lettei, for City Council consideration at the 8/19/08 meeting. • Gas main installation has been completed, and no�� all private �atility installation is completed. • The_ waste�n�ater treatmel�t facility is completed and a startu�� �n�ocedur� was conducted to verify the systeil� is in workiilg order. �verytl�li�lb went w�ll dtzring the 568gen�Engineering Updatcs 2 . � sk�rtu}�� ;,r�d il��� sv�tei�n �n�ill l�e �rint�r�ized far tl��e winti�r. 'T'l��e syst��i�� will b�, tesie�� � a��ain �7rxt ��.�n�n�ier i�o ensure t]��at tl�e systei��i is ii� final wr�ri<in� ��r��e.r hefore th� system is accept�c�. F Pinal bVe�r (-�o�ar�e l�as been ��laced ar�d tlie 1�itumi»oi�� core res��(ts h�ve b�tl-� n�et the �taalclards fr,�- dens�iy and tllick�tess. • Tl��e n�tive sr-�edir�� of the ditch�s, spoil areas, a��d re-�;r�ded areas 1�����e be�n �c�tlt��leiec� l�y (.-'riti�al Connections. All infiltrafiio» hasins have heen }�lanted with native }71ugs, and muld�ed for seve�•al weeks no�n�. Also �11 tl�e i�al•� soils that were pre�-iousl�� seeded by Critical Connections 1-►ave beel� iliulclled �nd crinl��ed prior to tlie si�owfall. « 'I'he �'onti•actor has coi��l�leted the aggrFgaie shoul��ering a��d remov�l of sediment f�ro�11 the storm sewer lines. � • � Frnal lns��ection Notice was prepared fo�� the Develc�}�ei•. The items not finished in 2008 will be completed ii� t11e spring of 2009 aIong wii-11 any warranty work that may be necessary. � No action taken this month. 7. White Rock Ranch • Fi��al plat has been approved. • No action taken this month. 8. Old Marine Estates • No action taken this month. Studies and General En�ineerin� • 197th Street Drainage Improvements. Bonestroo has completed a review of proposed improvements by the Washington Conservation District. Information will be sent to the Washington Conservation District and City of Scandia that will include a project cost estimate and modifications to the proposed improvments. 568gcn�Engineering Updatcs 3