Loading...
5.c) Chap. 2 Sec. 4.26 Temporary Dwelling Unit During Construction4.26 Temporary Dwelling Unit During Construction. Temporary dwelling units shall comply with all of the following requirements. (1) The property is limited to 1 temporary dwelling unit during construction. (2) The dwelling may be occupied only by persons who are the present or potential occupants of the single-family residence being constructed, reconstructed or altered. (3) An interim use permit for the temporary dwelling may be issued only after the building permit has been obtained for the proposed construction. (4) The temporary dwelling unit shall use the existing or the proposed road access drive of the principal dwelling unit under construction. (5) The unit shall be connected to an approved on-site waste disposal system. (6) The property owner shall submit a financial guarantee to the Zoning Administrator to ensure that the structure will be removed upon termination of the interim use permit. The amount of the guarantee shall be determined by the Zoning Administrator. (7) Termination of Permit. The interim use permit shall expire when construction is completed or within one hundred and eighty days from the date of issuance, whichever is less. At the termination of the interim use permit, the temporary dwelling shall be removed from the premises within 30 days.