10-23-95 special tbOctober 23, 1995
On the above date New Scandia Town Board held a Special Meeting.
The following Board Members were present: Chairman, Charles
Nordin, Edith Hadlich and Kevin Nickelson. Absent, Duane
Thompson and Paul Rasmussen.
UPTOWN SEWER SYSTEM
Mr Tom Prew stated there appears to be some merit in regards to a
gravity system versus a pump system for the Uptown Sewer System.
Mr Mike Peterson, Peterson Excavating quoted cost estimates for
the change orders for the proposed system.
Kevin Nickelson made a motion to change the Uptown Sewer System
to a 2 inch Force Main System if possible and if not possible to
install a 3 inch Force Main System with the following cost
figures for the Uptown Sewer System:
(1) Required 400 yards of top soil at $7.00 per yard
(2) Remove the 2 inch pressure line with a cost reduction
of $672.00
(3) 2 1/2 inch high head sewage pond for construction
cost of $2,655.00
(4) Electrical and meter installation in the amount
$1,020.00
(5) Installation of tank at the drainfield site in the
amount of $1279.00
Edith Hadlich seconded the motion and motion passed unanimously.
Mr Wayne Schmitt, owner of the Schmitt Mall, questioned if and
when he connects to the Uptown Sewer System could the tank for
the Malls septic system be removed from his property. The board
informed Mr Schmitt that if there was not much change in usage it
could be removed, but if the use is greater they might require
the use of the tank at that location.
It was agreed that the township shall read the water meters
quarterly.
Meeting adjourned.
D es � e=r----
New Scan is Township Clerk