Loading...
10-28-99 tb supervisor-elim mtgOctober 28, 1999 On the above date Paul Rasmussen, David Hebert meet with the following members of Elim Lutheran Church: Dan Sandager, Larry Engstrom, Norman Ostrand. It was stated that at the last meeting the Town Board gave permission to the Elim Lutheran Church to connect to the Skating Facility Well for a permanent connection and that the church still had a option to drill a well. It was stated the engineering fees would be approximately $1,000.00 and to tentatively use the City of Forest Lake usage fee. Mr. Larry Engstrom questioned if the township would be responsible for the maintenance of the system or if there would be a well failure. Mr. Engstrom was informed that would be the township responsibility. Larry Engstrom will receive a quote from Peterson Excavating and Paul Rasmussen will contact Tom Peterson regarding engineering fees. Minutes submitted by Paul Rasmussen