10-28-99 tb supervisor-elim mtgOctober 28, 1999
On the above date Paul Rasmussen, David Hebert meet with the
following members of Elim Lutheran Church: Dan Sandager, Larry
Engstrom, Norman Ostrand.
It was stated that at the last meeting the Town Board gave
permission to the Elim Lutheran Church to connect to the Skating
Facility Well for a permanent connection and that the church
still had a option to drill a well.
It was stated the engineering fees would be approximately
$1,000.00 and to tentatively use the City of Forest Lake usage
fee.
Mr. Larry Engstrom questioned if the township would be
responsible for the maintenance of the system or if there would
be a well failure. Mr. Engstrom was informed that would be the
township responsibility.
Larry Engstrom will receive a quote from Peterson Excavating and
Paul Rasmussen will contact Tom Peterson regarding engineering
fees.
Minutes submitted by Paul Rasmussen