Loading...
9. Hugo Fee ExampleBUILDING PERMITS:.. VALUE RANGE $1 -$500 $501 - $2,ODO $2,001- $25,000 $26.001 - $50,000 $50,001-$100,000 $100,001-$500,OOD $500,001-$1,000,000 $1,000,001 and up BUILDING RELATED, Air Conditioning (central) Air -to -Air Heat Exchanger Building Moving City Inspection Fee (one hour minimum) Building Permit Refund Charge Driveviay Electrical Fireplace (zem-Gearance) Gas Piping Mechanical Plumbing (per fixture) Plan Review Fee - Identical Plans Plan Review Fee - Non -Identical Plans CITY OF HUGO 2015 FEES, RATES AND CHARGES ESCROW FEES AND OTHER Schedule Adopted by LMC/AMM Bldg Pem it Fee Working Group $ 25.00 $ 25A0 for the first $ 5DD.00 $ 3.25 seen additional $ 10D.00 $ 73.50 for the first $ 2,DDD.00 $ 14.75 each additional $ 1,UDD.00 $ 415.75 for the first $ 25,ODO.00 $ 10.76 each additional $ 1,000.00 $ 682.50 for the first $ 60,ODD.00 $ 7.50 each additional $ 1,000.00 $ 1,063.50 for 0le first $ 100,000.00 $ 6.00 each additional $ 1,000.00 $ 3.427.75 for the first a 500,000.00 $ 5.00 each additional $ 1,000.00 $ 5.945.26 for the first $ 1,000,000.00 a 4_.00 each additional $ 1,000.00 1 $ 30.00 $ 30.00 $ 110.00 $ 2.500.00 $ 58.00 per hour 20% of permit $ 55.00 As per state schedule $ 30.00 $ 30.00 $ 35.00 $ 8.00 25% of building permit fee 65 % of building permit fee Accessory Building $ 50.00 Commercial or Residential Building $ 120.00 $ 1,000.00 DEVELOPMENT FEES: Escrow for Engineering B Legal 4% of cost of improvements Letter of Credit or Cash Escrow 125% of cost of improvements City Engineering Technician Inspections $ 93.00 per hour Parkland Dedication: Commercial and Industrial Exempt Residential $ 2,400.00 per unit Sealcoating $ 4.00 per lineal foot Snowplowing $ 0.5DD per lineal foot Stormwater Trunk Fee $ 0.07 per square foot of net developable area LOCAL GOVERNMENT UNIT (LGU) FEES No -Loss Exemption Determination $ 250,00 Delineation Approval: Less Man 10 acres site $ 275.00 10 acre site or larger $ 35D.00 Replacement Plan Application: Less than 10 acres site $ 550.00 TBD upon review 10 acre site or larger $ 800.00 TBD upon review Welland Banking Application $ 1,6DO.00 TBD upon review Annual Welland Mitigation Monitoring $ 2,500.00 All Other Weiland Services $ 200.00 TBD upon review LGU fees are in addition to planning B zoning fees (and escrows) identified below. PLANNING & ZONING RELATED: CONDITIONAUINTERIM USE RELATED: CondMonaUlnlerim Use PermitApplication $ 500.00 $ 1,000,00 Conditionalllnterim Use Permit Amendments $ 250.00 COMPREHENSIVE PLAN RELATED: Comprehensive Plan Amendment $ 540.00 5-year escrow Commercial Only Page 2