Loading...
4. a Hartley Amendment to Dev Agmt 11.13.18 , Memorandum To: Scandia Planning Commission Reference: Hartley Request to Amend Bakken Development Agreement #3963349 Copies To: Neil Soltis, City Administrator Brenda Eklund, Clerk Greg Hartley, applicant Project No.: 16622.012 From: Merritt Clapp-Smith, Planner Routing: Date: November 13, 2018 SUBJECT: Hartley Request to Amend Bakken Development Agreement #3963349 to install a hammerhead turn around for emergency vehicles instead of a cul- de-sac at the end of 239th St Ct N. MEETING DATE: November 13, 2018 LOCATION: XXX 239th St Ct N PID 05.032.20.22.0005 ZONING: General Rural (GR) 60-DAY PERIOD: December 28, 2018 ITEMS REVIEWED: Application received October 29, 2018, related information, and Bakken Minor Subdivision case files Hartley – Amendment to Bakken Dev Agreement Scandia Planning Commission Page 2 November 2, 2018 PROPERTY INFORMATION Parcel description: XXX 239th St Ct N is a 10-acre, triangular shaped lot at the northern border of Scandia, just northwest of Bone Lake. The lot is located at the terminus of 239th St Ct N. Land use: The property is vacant, with single-family homes as the nearest uses. Natural Features and Conditions: The lot is wooded, with wetland areas along the western edges and part of the eastern edge. There is a steep slope leading down to the wetland on the southern corner. The grade drops ten (10) feet over the thirty (30) feet between the edge of the right -of-way shown and the bottom on the slope. After excluding road and wetland setbacks, the buildable area of the lot is roughly 2.5 acres, as depicted in blue shading in this image. The proposed design change for the terminus of 239th St Ct N, from a cul-de-sac to a hammerhead, could be accommodated without impacts to the area. Image courtesy of City Administrator Neil Soltis. Hartley – Amendment to Bakken Dev Agreement Scandia Planning Commission Page 3 November 2, 2018 DESCRIPTION OF THE REQUEST: Mr. Hartley plans to develop the parcel for a single-family home. A single lot development would only require one driveway access to 239th St Ct N., and therefore, Mr. Hartley is asking for an amendment to the 2013 Bakken Minor Subdivision Development Agreement, to allow installation of a hammerhead style turn around at the end of 239th St Ct N, instead of a cul-de-sac, as required in the original Development Agreement. EVALUATION OF THE REQUEST The 10-acre property at the end of 239th St Ct N is the result of a lot split following approval of the Bakken Minor Subdivision by the Scandia City Council under Resolution 8-20-13-02. Lot 1, as the parcel is referred to, was required in the Bakken Development Agreement to have a cul-de-sac at the end of 239th St Ct N to serve it. The rationale was that if further subdivision of Lot 1 was sought in the future, a cul-de-sac would provide the best access for multiple lots. The current applicant, Mr. Hartley, has no plans to subdivide Lot 1 and therefore requests that the requirement for a cul-de-sac be amended to allow a hammerhead turn around instead. Scandia Development Code Chapter Three, Subdivision Regulations of the Scandia Development Code, identifies eleven criteria to be met for Minor Subdivisions. Criteria 6.2 (11) relates to public road access, “The minor subdivision shall comply with all applicable requirements of the road authority, including access spacing…” Access and Design The City Engineer, Fire Chief and Public Works Director reviewed this applicat ion and provided the following recommendations: Fire Chief -- We need any road end to have a space adequate to turn a fire truck around and support the weight. Public Works Director -- At a minimum, we need room to turn the dump truck around. A hammer head would work [if properly sized]. Hartley – Amendment to Bakken Dev Agreement Scandia Planning Commission Page 4 November 2, 2018 In consultation with the Public Works Director, City Engineer Ryan Goodman has suggested the hammerhead turn around design and dimensions shown below as an alternative to a cul-de-sac. The design is consistent with comparable street projects in Scandia. Under Mr. Hartley’s proposed use for Lot 1 as a single lot, a hammerhead design is adequate to accommodate access to the lot, as well as turnaround space for emergency and publi c works vehicles. If subdivision of the lot is proposed in the future, then street design improvements appropriate to serve the proposed subdivision could be identified and required at that time. Hartley – Amendment to Bakken Dev Agreement Scandia Planning Commission Page 5 November 2, 2018 ACTION REQUESTED: The City Council can recommend the following: 1. Approval 2. Approval with conditions 3. Denial with findings 4. Table the request PLANNING STAFF RECOMMENDATION: The Planner recommends that the City Council approve the request to amend Bakken Development Agreement #3963349 to allow a hammerhead turn around instead of a cul-de-sac, under the following conditions: 1. The design of the hammerhead turn around shall meet the specifications of the City Engineer, (as detailed in City Plate No. STR-23 on the previous page). 2. The applicant shall construct the hammerhead turn around before the City will approve a building permit for Lot 1. 3. Lot 1, PID 05.032.20.22.0005, shall remain as a single lot and not be further subdivided.