3.b Scandia_City_Council_112018_v1Argo Navis Community Solar Garden Remediation Activities Stormwater Retention System Layout 2 Emergency Overflow Location (EOF) 3 Additional Best Management Practices (BMPs) put in place week of September 23, 2018 •Sandbags •Silt Fence •Bio Logs Central Pond from EOF 4 Ongoing Remediation Efforts 5 Reopen Additional Holding Pond –September 25, 2018 Ongoing Remediation Efforts 6 Additional erosion control blankets and biologs along perimeter fence (western boundary) – October 8, 2018 Additional erosion control blankets along entrance to site – October 10, 2018 Ongoing Remediation Efforts 7 Biologs placed and/or improved around all culverts along the access road – October 8, 2018 All excavated soil piles stabilized –ongoing as needed Ongoing Remediation Efforts 8 New, larger, temporary holding pond at northern boundary of the site –November 8, 2018 Ongoing Remediation Efforts 9 Commenced November 13, 2018 following dewatering •Dewatering southernmost basin –commenced November 20, 2018 •Excavation of southernmost basin –Anticipated to commence November 26, 2018 •Actively working with Watershed District, DNR, MPCA, and City of Scandia to develop final remediation plans •Barr Engineering retained to assist with analysis and development of remediation plan •Earthwork to continue as long as possible, weather permitting •Likely that additional work will take place in the spring •If necessary, additional Best Management Practices added to Emergency Overflow to prevent any outflow during spring thaw Next Steps 10