8.b) Scandia Site PlanNOTES:
1. TOPOGRAPHY IS FROM A COMPILATION
AERIAL SURVEY BY MARTINEZ CORPOR,
DATED 11/11/1998, TOPOGRAPHIC SU
SUNDE LAND SURVEYING, LLC DATED
02/10/2005 FOR THE ACTIVE MINING
AREA, AND TOPOGRAPHIC DATA FROM
WASHINGTON COUNTY DATED 01/31/21
THE NORTHEASTERN 803 ACRES.
2. SETBACKS. THE FOLLOWING MINING SE
WILL BE MAINTAINED:
• 50' FROM PROPERTY LINE
• 200' FROM OCCUPIED STRUCTURE
• 100' FROM ANY CONTIGUOUS PRC
SUBDIVIDED INTO RESIDENTIAL LOT
ACRES OR LESS (NOT APPLICABLE
• 100' FROM ROAD R -O -W
3. PROCESSING AREA SHOWN REFLECTS
CURRENT CONDITION. PROCESSING AI
WILL CHANGE WITH THE PROGRESSION
MINING. MULTIPLE PROCESSING OPER
MAY BE LOCATED THROUGHOUT THE
PROCESSING AREA OR AREAS. CERTA
PROCESSING OPERATIONS REQUIRE
EQUIPMENT TO BE PLACED NEAR THE
VARIOUS MATERIALS NEEDED TO MAKE
SPECIFIC PRODUCTS AND OTHER
PROCESSING OPERATIONS NEED TO BE
PLACED IN A MANNER THAT AVOIDS
CONFLICTS WITH THE ACTUAL MINING.
4. ADDITIONAL MINING MAY BE REQUIRED
POTENTIAL RECLAMATION AREAS.
N
300 0 300 BO(
SCALE IN FEET
4.,- T,. . ® z.. eL DII-IN : - NI\Tilley Ronalu\A^^'wI .1-1- 1—cl\.1 zms\." AN' - sl Plan Gm,I g 1,01 n uxn
CONSULTING CIVIL ENGINEERS
10.010 NESBITT AV ENl1E SOM
BLOOMINGTON, MINNESOTA 55131
(gig) BB1311p TEUEPHONE
(R X881-1813 fA%
xw.v.wnEzevll com
TILLER
CORPORATION
2015
ANNUAL
OPERATORS PERMIT
SCANDIA,
MINNESOTA
LATE REvlsou
wwb t•
vJtup.mb
L9+•h•m
Lbanwm
SY ME OR UNDER MY EIREET SUPEWSION
RVvin RE.,
f j
NNRMFTON
PROJECT NO,
E,6G
P KN SY:
CHECKING BY
KP
M%30VEDBY:
KP
9(:p1E
Onplio
mm
1f13IfS
DEGERIPNON:
SITE PLAN