Loading...
8.b) Scandia Site PlanNOTES: 1. TOPOGRAPHY IS FROM A COMPILATION AERIAL SURVEY BY MARTINEZ CORPOR, DATED 11/11/1998, TOPOGRAPHIC SU SUNDE LAND SURVEYING, LLC DATED 02/10/2005 FOR THE ACTIVE MINING AREA, AND TOPOGRAPHIC DATA FROM WASHINGTON COUNTY DATED 01/31/21 THE NORTHEASTERN 803 ACRES. 2. SETBACKS. THE FOLLOWING MINING SE WILL BE MAINTAINED: • 50' FROM PROPERTY LINE • 200' FROM OCCUPIED STRUCTURE • 100' FROM ANY CONTIGUOUS PRC SUBDIVIDED INTO RESIDENTIAL LOT ACRES OR LESS (NOT APPLICABLE • 100' FROM ROAD R -O -W 3. PROCESSING AREA SHOWN REFLECTS CURRENT CONDITION. PROCESSING AI WILL CHANGE WITH THE PROGRESSION MINING. MULTIPLE PROCESSING OPER MAY BE LOCATED THROUGHOUT THE PROCESSING AREA OR AREAS. CERTA PROCESSING OPERATIONS REQUIRE EQUIPMENT TO BE PLACED NEAR THE VARIOUS MATERIALS NEEDED TO MAKE SPECIFIC PRODUCTS AND OTHER PROCESSING OPERATIONS NEED TO BE PLACED IN A MANNER THAT AVOIDS CONFLICTS WITH THE ACTUAL MINING. 4. ADDITIONAL MINING MAY BE REQUIRED POTENTIAL RECLAMATION AREAS. N 300 0 300 BO( SCALE IN FEET 4.,- T,. . ® z.. eL DII-IN : - NI\Tilley Ronalu\A^^'wI .1-1- 1—cl\.1 zms\." AN' - sl Plan Gm,I g 1,01 n uxn CONSULTING CIVIL ENGINEERS 10.010 NESBITT AV ENl1E SOM BLOOMINGTON, MINNESOTA 55131 (gig) BB1311p TEUEPHONE (R X881-1813 fA% xw.v.wnEzevll com TILLER CORPORATION 2015 ANNUAL OPERATORS PERMIT SCANDIA, MINNESOTA LATE REvlsou wwb t• vJtup.mb L9+•h•m Lbanwm SY ME OR UNDER MY EIREET SUPEWSION RVvin RE., f j NNRMFTON PROJECT NO, E,6G P KN SY: CHECKING BY KP M%30VEDBY: KP 9(:p1E Onplio mm 1f13IfS DEGERIPNON: SITE PLAN