8.c) City Engineer . � �. c� City of Sc�nc�ic� ENGIIUEERING UPDA TE janican�2008 The purpose of this update is to provide you with information on various projects and engineering activities for the month. Cttt/ PYOI L'CfS: �.----r_ 1. 2007 Street Paving • Project was completed by Dresel Contracting on time and under budget. • Assessments were levied. o Two year warranty period ends�ctober,2009. • No action taken this month. Private Developments: 1. Wyldewood Acres (file 5d8-03115�Steve May developer • Still some landscaping to be done by developer. • Cracked sidewalk at several locations along Odell-caused by developer's equipment. � No action taken this month. 2. Natwre's Walk(file 568-04121) Avalon Homes developer • Dead trees were removed and replaced in Fall,2007. • Letter of Credit: $7,500 for landscaping. • No acrion taken this month. � 3. Wiid Bush Acres (file 568-Q4123ZMark Woolston developer • Bituminous wear course and gravel shouldering were completed on all streets in August,2007. • Erosion control rneasures were installed late in 2006 and grass is growing, • Letter of Credit: $60,000 for streets,$1,500 for Landscaping. 3 trees are questionable. • No action taken this mantll. 3GS�ecn�C•nginccring Updv�s � 4. The Sanctuary�filc 568-04000) $rian iverson developer • Bituminous weax�course still needs to be placed. � Letter of Credit: On 10/4/05,amount was reduced to$9,375 for streets and $3,QQ�for Iandscaping. • Developer was contacted in August,2Q07 aUout paving the final wear course for his 80U foot-long road. • IVo action taken Ehis month. 5. German Lake Estates o Proposed Willowbrook Cammunity C_'hurch site. • Na action taken this month. 6. Tii Gava file 568-061311 Superior Lake Development � All roads are Uuilt through the class 5 gravel, including Phase 2 • Base course bituminous is in-place an half the streets • Pressure sanitary sewer pipes and service lines are in-�Iace, Testing will Ue done in 200$. • Storm sewer culvert,piping and structures are 99% complete. • Infiltratian, filiration and wet sedimentation basins will be constructed in 2Q08,along with necessary outlet structures,draintile and skimmers, • The wastewater�reatment system will be installed in 2008. • All erosion control devices are in-place tl�roughout the develapment. o Temporary seeding has been done. • Final restorations wi#h native seeds will be done in 2008. • Dredging of the channel is scheduled for February 2�08(30Q to 500 cubic yards}. • Private utilities are sclleduIed for Spring 200�. • SWPP permit inspections will be done by Jason Husveth in early 2Q0$. � A revised landscape plan(tree species-numUer and location,native prairie in several of the outlats)will be submitted in early January for review.. � ReliUein has Ueen retained by the deveIoper�nd their crews will complete all the necessaxy work in 2008, 7. White Rock Ranch � Final plat has been appxoved. • No action taken this month. S. Qld Mazine Esta#es • Waiting for developer to inove ahead. • No acfion taken this month. 568gen�l:ngiiacrrin�t UpJntcs � , Sticc�ies al�cl General En�ineerinQ: ,�. � I. Pavement Management Study • Directed to prepare a proposal that includes options for the City. • Pian will document existing conditions�nd provide strategies to manage pavements and roadways. 2. Projects that are complete and in warrant�period • Lofton Court Drainage. Will inspect in July. No action taken this month. • Perkins Ave.berm. Will inspect in July. No action taken tlus month. • Novak Avenue turnaround. One year inspection in October. No action taken this month. • 182nd Street Drainage. One year inspection in OctoUer, No action taken this month. e Mostad driveway. Claim was dismissed in court. No acHon taken tivs month. • OIsen/Sandgren Pond. One year inspectian in June. No action taken this month. e Manning Uverlook. No action taken this month. �GSgcnlEnginccring Upda�cs '�