The purpose of this update is to provide you with information on various projects and
engineering activities for the month.
Cttt/ PYOI L'CfS:
�.----r_
1. 2007 Street Paving
• Project was completed by Dresel Contracting on time and under budget.
• Assessments were levied.
o Two year warranty period ends�ctober,2009.
• No action taken this month.
Private Developments:
1. Wyldewood Acres (file 5d8-03115�Steve May developer
• Still some landscaping to be done by developer.
• Cracked sidewalk at several locations along Odell-caused by developer's equipment.
� No action taken this month.
2. Natwre's Walk(file 568-04121) Avalon Homes developer
• Dead trees were removed and replaced in Fall,2007.
• Letter of Credit: $7,500 for landscaping.
• No acrion taken this month. �
3. Wiid Bush Acres (file 568-Q4123ZMark Woolston developer
• Bituminous wear course and gravel shouldering were completed on all streets in
August,2007.
• Erosion control rneasures were installed late in 2006 and grass is growing,
• Letter of Credit: $60,000 for streets,$1,500 for Landscaping. 3 trees are questionable.
• No action taken this mantll.
3GS�ecn�C•nginccring Updv�s �
4. The Sanctuary�filc 568-04000) $rian iverson developer
• Bituminous weax�course still needs to be placed.
� Letter of Credit: On 10/4/05,amount was reduced to$9,375 for streets and $3,QQ�for
Iandscaping.
• Developer was contacted in August,2Q07 aUout paving the final wear course for his
80U foot-long road.
• IVo action taken Ehis month.
5. German Lake Estates
o Proposed Willowbrook Cammunity C_'hurch site.
• Na action taken this month.
6. Tii Gava file 568-061311 Superior Lake Development
� All roads are Uuilt through the class 5 gravel, including Phase 2
• Base course bituminous is in-place an half the streets
• Pressure sanitary sewer pipes and service lines are in-�Iace, Testing will Ue done in
200$.
• Storm sewer culvert,piping and structures are 99% complete.
• Infiltratian, filiration and wet sedimentation basins will be constructed in 2Q08,along
with necessary outlet structures,draintile and skimmers,
• The wastewater�reatment system will be installed in 2008.
• All erosion control devices are in-place tl�roughout the develapment.
o Temporary seeding has been done.
• Final restorations wi#h native seeds will be done in 2008.
• Dredging of the channel is scheduled for February 2�08(30Q to 500 cubic yards}.
• Private utilities are sclleduIed for Spring 200�.
• SWPP permit inspections will be done by Jason Husveth in early 2Q0$.
� A revised landscape plan(tree species-numUer and location,native prairie in several
of the outlats)will be submitted in early January for review..
� ReliUein has Ueen retained by the deveIoper�nd their crews will complete all the
necessaxy work in 2008,
7. White Rock Ranch
� Final plat has been appxoved.
• No action taken this month.
S. Qld Mazine Esta#es
• Waiting for developer to inove ahead.
• No acfion taken this month.
568gen�l:ngiiacrrin�t UpJntcs �
,
Sticc�ies al�cl General En�ineerinQ:
,�. �
I. Pavement Management Study
• Directed to prepare a proposal that includes options for the City.
• Pian will document existing conditions�nd provide strategies to manage pavements
and roadways.
2. Projects that are complete and in warrant�period
• Lofton Court Drainage. Will inspect in July. No action taken this month.
• Perkins Ave.berm. Will inspect in July. No action taken tlus month.
• Novak Avenue turnaround. One year inspection in October. No action taken this
month.
• 182nd Street Drainage. One year inspection in OctoUer, No action taken this month.
e Mostad driveway. Claim was dismissed in court. No acHon taken tivs month.
• OIsen/Sandgren Pond. One year inspectian in June. No action taken this month.
e Manning Uverlook. No action taken this month.