Loading...
8.c) City Engineer , - �� � � � `--��. :��'_.�,..`:•` City of Scandia �.�';, �:-_ ��::. .�.� � , t �F ENGINEERING UPDA TE Febricar��2008 The purpose of this update is to provide yau with information on various projects and engineering activities for the month. HIGHLIGHTS FOR TIME PERIOD 1/15/08-2l15/08 • 2007 Paving Project-Record Plans. • Pilar Road-reviewed maps and information,made list of issues. • Willowbrook Church-brief review of site plan. • Tu Gavo-met with developer ta discuss their concerns about billings. Bonestroo will credit some inspection hours. • Pavement Managernent met with A.nne to discuss. Will prepare a draft proposal for her to review and present to Council March 18. • 2008 Road Striping- Generating Iist of streets to include in County project. • Street Inventory-worked with Colleen on updating aIl paved city streets for GASB {General Accounting Standazds Board). Cit�PYojects: 1. 2007 Street Pavin� • Project was completed by Dresel Contracting on time and under budget. • Assessments were levied. • Two yeaz warranty period ends October,2009. • Making corrections to plan sheets for record plans. 2. Pilar Road • Iteviewed maps and road easement information. Made list of issues we will encounter with the future paving. Still gathering information on past surveys and righ#-of-way along Pilar Road. Pf~ivate Develo�ments: 1. Wvldewood Acres • Still some landscaping to be done by developer. • Cracked sidewalk at several locations along Odell-caused by developer's equipment. • No action taken this month. iG8gcn\Enginecring Updatcs 1 t a 2. Nature's Walk • Dead trees were removed and replaced in Fall,2007., � Letter of Credit: $7,50Q for landscaping, • No action taken tltis month.. 3. Wild Bush Acres • Bihzminous wea�r course and gravel shouldering were rompleted on all sireets in August,2007. � Erosion control measures were installed late in 2QUb and grass is growing. • L,etter of Credit: $b0,000 for streets,$1,500 for Landscaping. 3 irees are questionable. • No action taken this month, 4. The Sanctuarv • Bituminous wear course still needs to be placed. • L,etter of Credit: On 1Q/4/�5,amount was reduced to$9,375 fox streets and$3,000 for landscaping. • Developer was contacted in A,ugust,2007 about paving the final wear course for his 800 foot long road, • No ac�ion taken this month. 5. Willawbrook Church • Review site plan and provide en,gineearing comments. 6. Tii Gavo • All roads are built through the class 5 gravel,including Phase 2 • Base course bituminous is in-place on halE the streets • Pressure sanitary sewer pipes and service lines are in-place, Testing will be done in 2008. • Storm sewer culvert,piping and structures aze 99% complete. • Infiltra#ion,filtradon and wet sedimentation Uasins will be constructed in 2008,along with necessary autlet structures,draintile and skimmers. • The wastewater treatment system will be installed in 2Q08. � All erosion control devices are in-place throughout the development. • Temporary seeding has Ueen dane. • Final restorations with native seeds will be done in 2008. • Dredging af the channel is scheduled for February 2008(30U to 50Q cubic yards). • Private utilities are scheduled for Spring 2008. • SWPP permit inspections will be done Uy]ason Husveth in early 20(}8. � A revised landscape plan was approved in January. (tree species-numlier and location,native prairie in several of the outlots) • Rehbein has been retained by the developer and their crews will complete�li the necessary work in 2008. • Met with Mark Sandercott and City Staff to discuss our inspecfion hours last summer. Since some storrn sewer and sireets were redone when Rehbein was broughfi in,they felt a credit was due. We reviewed our recards, discussed in- SG8gcnlCnginecring Updates 2 house,and agreed to credifi inspection time from last August. A memo will be forwarded to Anne in the coming month. 7. tNhxte Rocic Ranch • Final plat has been approved. • No action taken this month. S. Old Marine Estates • Waiting for developer to move ahead. • No action taken tlus month. Studies c�nd General E�z i� neerin : 1. Pavement Management Study • Directed to prepare a proposal that includes options for the City. • PIan will document existing conditions and provide strategies to manage pavements and roadways.. � Started preparing the proposal,rnet with Anne at City Hall to discuss. Will submit a draft proposal to Anne in the next month and have on the March 18 meeting agenda to discuss with Council. 2. 2008 Road Striping • Received a letter from Washington County asking if Scandia wants to include some roads with their striping project. • Discussed with John Morrison. Working on a list of streets ta include. 3. Projects that are complete and in wananty period • Lofton Court Drainage. Will inspect in�uly. No action taken this month. � Perkins Ave. berm. Will inspect in Julyo No aciion taken this month. • Novak Avenue turnaround, One year inspection in October. No action taken this month, � 182nd Street Drainage. One year inspection in Uctvber. No action taken this month. • Mostad driveway.. Claim was dismissed in court. No action taken tlus manth� • Olsen/Sandgren Project. One year inspection in June. • Manning Overlook. No action taken this month. SGSgen�Cnginccring Upcialcs 3