Loading...
8.d 2-19-2019 Engineering Updates City of Scandia Engineering Updates 2/19/2019 Engineering italics = old information • Comprehensive Plan Update Project website updated to include status and current draft (https://www.bolton- menk.com/clients/scandia/index.html) We received a letter of incompleteness from the Metropolitan Council on January 17, 2019. This letter was not unexpected. According to the Met Council, none of the 80+ plans submitted to date have been complete. We are working on compiling the items needed and will resubmit as soon as possible. Our goal is to be able to resubmit by February 22nd. Once the plan has been determined to be complete, it will proceed through the Met Council committee process. The status of the plan can be tracked on the Scandia Community Page on the Met Council website at https://lphonline.metc.state.mn.us/CommPage?ctu=2396548&applicant=Scandia • 2018 Street Project Weekly/current construction updates are posted on the City’s website, link is: “2018 Street Improvements Projects” Record plans have been completed and currently being reviewed by Public Works. Project walk-through will be conducted in the spring, any outstanding items will be addressed and completely prior to project closeout. • Miscellaneous Gateway State Trail Extension • Specific Property owner meetings have been held on 10/31/18 and 11/14/18, ongoing coordination has continued to occur. • All wetland & preliminary field survey work has been completed including completion of the wetland delineation report. TEP meeting was held on 11/30/18. • Attended a Technical Design meeting with the DNR & City Staff on 12/19/18 to discuss project constraints along CR 52, thus a meeting with the County has been scheduled for 1/11/2019 to presents options. • Been working closely with DNR/City on options along the County Road 52 portion. Anticipate a public open house March/April 2019. Bliss Drainfield System • Been working on gathering information and will start to review results so the Nitrogen Mitigation Plan can be prepared for MPCA approval within on year of permit issuance.