5.c) Public Works February 2019 Reportn
SCANDIA
February 2019 report
PW Staff report:
March 5t", 2019
• Vinterfest preparations have been put back in order. The hockey rink
doors are open again, barricades and recycling containers returned to
storage, and the signs on the 4 entrances to town were removed and
stored in cold storage.
• Walks - snow removal 5 times
• Ben continued for the week of 2-18-19 through 2-25-19. The position
is a 67 -day appointment by the city and staff will need to save some
days for next year to help with flooding.
• Plowed Park's two paved parking lots 4 times. The Lilleskogen piles
were getting large so we moved snow to the East side of the parking
lot.
• Flat on the Zamboni was changed out.
• Staff caught rubber from the Vinterfest mats in the vertical auger —
Staff is addressing