3.a Discussion on proposals to retrofit lighting at Fire Public Works building
Staff Report
Date of Meeting: March, 06 2019
To: City Council
From: Mike Hinz, Fire Chief
Re: Fire Station / Public Works LED Upgrade
Background:
Currently the fire station / public works building uses florescent lighting in all areas of the
building. As most know LED uses much less energy during operation, lasts longer (50,000 hours
or more), does not loose lumens with age & achieves full lumen output instantly to name a few
of the benefits.
Currently the building has reached the age that we are seeing a large increase in light failure due
to either the lamp or ballast failing.
The Fire Chief has contacted 2 vendors for recommendations and quotes. Both the Center for
Energy & Environment (a non-profit) who contracted with Norske electric and Graybar (D&G)
(preformed community center retrofit) have come out and looked at our facility and submitted
quotes. Quote and fixture information is attached for your review.
There are 2 quotes from CEE/Norske electric, and 1 quote from Graybar/D&G. CEE provided an
estimate very similar in scope to the Graybar/D&G quote, but also provided a more cost effective
option.
The Graybar/D&G quote is based on a publicly bid contract. The CEE/Norske Electric quotes
are much below the publicly bid contract.
The CEE estimate “City of Scandia-15040-v2” and the Graybar/D&G Quote #1692, quotes are
based on the same project scope.
CEE price after rebate is $25,737.30
Graybar/D&G price after rebate is $29,821.00
The more cost effective option that CEE/Norske Electric submitted “City of Scandia-15040-
vNorske” Bid #26423 does not replace any of the high bay fixtures in the fire/pw truck bays.
According to the lighting specialist from the Center of Energy & Environment, the fixtures are
not in need of replacement, so not replacing the fixtures will reduce the overall project cost
dramatically.
The CEE/Norske Electric price after rebate is $15,234.00
The City has the option of replacing the high bay fixtures or retrofitting the high bay fixtures.
The fixtures are not where we are having problems the problem is the bulbs & Ballast. Either
choice will reduce energy use the same amount.
Issue:
Should the City upgrade the current lighting to LED in the fire station / public works building?
Proposal Details:
The Fire Chief & Public Works Director have reviewed the quotes and are recommending that
we proceed with the more cost effective retrofit of all lighting in the building using CEE/Norske
Electric quote ‘City of Scandia-15040-vNorske’ dated21/25/19. Cost after rebate of $15,234.00.
The quote is to have the florescent fixtures retrofit to LED with ballast by-passed and replace the
upstairs training area and exterior fixtures with new LED fixtures. The quote includes labor,
fixtures, lamps & disposal.
Fiscal Impact:
The fiscal impact to Retro fit all lighting is $18,419.59 minus an Xcel rebate of $3,185.59 for an
end cost to the City of $15,234.00. During the last budget meeting we added $30,000 to the CIP
project list for this item and have come in well under initial estimates. The estimated payback
time is 3.4 years.
Options:
(1) Approve the recommended retrofit and direct staff to sign contract with CEE/Norske
Electric.
(2) Approve one of the other quotes provided and direct staff to sign contract.
(3) Request other options
(4) Not upgrade lighting at fire/PW building
Recommendation:
Option (1)
Prepared by Lighting Specialist:
Charlie Ketchum
Center for Energy and Environment
212 3rd Avenue North, Suite 560
Minneapolis, MN 55401
Phone:
(612) 518-4008Mobile:
(612) 335-5888Fax:
cketchum@mncee.orgE-mail:
- Financing
Kristen Funk
Center for Energy and Environment
212 3rd Avenue North, Suite 560
Minneapolis, Minnesota 55401
612-335-3487Phone:
612-335-5888Fax:
kfunk@mncee.orgE-mail:- Contractors
- Rebates
- Audits
Program Coordinator:
www.mncee.org
City of Scandia-15040-v2
Property Address:
15040 Scandia Trl N
Scandia, MN 55073-9708
January 17, 2019
Prepared for:
15040 Scandia Trl N
Scandia, MN 55073-9708
City of Scandia-
Cost Saving Recommendations
Lighting System Analysis
Customer Report
2QH6WRS(IILFLHQF\6KRS
Building Energy Efficiency Program
Page 1 of 8 Customer Report 01/17/2019 01:52 PM Program ID#-00002743
7 years$3,675.11
*Job must be completed and invoices submitted within 90 days or by 12/31/2019, whichever comes first. One-Stop reserves
the right to withdraw this rebate offer after expiration. You may request an extension, which includes re-verification of
eligibility, kW/kWh savings, installation costs, estimated rebate, and program rules by One-Stop.
After rebate (a)
(Including special orders)
Lighting Upgrades Estimated Costs
$28,684.12Total Installed Cost
$25,737.30Your Final Cost
Estimated
Annual Savings Payback
Rebate equals 10% of installed cost.Ö
Before rebate
$2,946.82Utility Rebate*
Estimated monthly savings $306.26
$481.08Monthly loan payments at 3.9% for 60 month term
(a)
(b) Estimate based on a loan amount of $25,994.67, including a $257.37 loan processing fee. Mortgage,
flood and title fees may apply. The loan term has a maximum of 5 years, with monthly payments not less
than the estimated monthly savings. Final terms and conditions set by lender upon loan approval.
7.9 years(b)
CEE Financing Option
(Including Loan Financing
Charges)
* How do CO2HPLVVLRQVDIIHFWPHDQGP\EXVLQHVV"5LVLQJFRQFHQWUDWLRQVRIJUHHQKRXVHJDVVHV*+*SURGXFHDQLQFUHDVHLQWKHDYHUDJH
surface temperature of the Earth over time. Rising temperatures produce changes in precipitation patterns, storm severity, and sea level
commonly referred to as ´climate change.µ&DUERQGLR[LGH&22), methane, nitrous oxide and four groups of fluorinated gases (sulfur
hexafluoride, HFCs, PFCs and CFCs) are the major GHG. In the U.S., GHG emissions come primarily from the combustion of fossil fuels in energy
use. CO2 emissions from coal-fired electricity generation comprise nearly 80 percent of the total CO2 emissions produced by the generation of
HOHFWULFLW\LQWKH86,QVWDOOLQJHQHUJ\HIILFLHQWOLJKWLQJDQGLPSOHPHQWLQJRWKHUFRQVHUYDWLRQPHDVXUHVWKDWUHGXFHHOHFWULFHQHUJ\XVH
significantly reduces GHG emmissions and mitigates global climate change. Read more at: www.eia.doe.gov or www.epa.gov
45,254
$3,675.11 (a)31,483
13,771
21.050
13.718
7.332
$5,615.31
$1,940.20
Existing Lights
New Lights
76,932
53,521
23,411
ŻEstimated Savings *
Utility Cost Analysis Demand (KW)Energy (KWh)Annual Cost CO2 (lbs)*
(a) Savings estimates are based on standard engineering calculations and are NOT guaranteed. Your actual savings may be higher or lower
depending on various factors, including how you operate your lights and other electric equipment in your building. Electric Utility Rates =
$0.0630/KWh and $13.30/KW, where Demand cost savings occurs primarily during the summer months peak rate hours of 9am to 9pm.
(13 [00,00 ] [0] [00,00] [00] [True] [10.599KW] )
Summary of Recommended Lighting Upgrades
2QH6WRS(IILFLHQF\6KRS
Page 2 of 8 Customer Report (01/17/2019 01:52 PM)
Program ID#
-00002743
City of Scandia-15040-v2
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
Recommended Lighting Projects
2QH6WRS(IILFLHQF\6KRS
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed Cost
(Without Rebate)
Estimated
Annual
Savings
Select
Area A: Fire Station Garage
Project: #1 Fire Station Hours
1,043 hrs/yr
$8,408.30
Incl Special Order
$879.30 ;
Qty Watts EXISTING Luminaire
24 257.60 T12 HO 8' 110S2 2L (EISA= T8 HO 8' 86E2 2L)
Qty Watts NEW Luminaire
95 LED 095W 1L-NewFix24
Area B: Utility Room
Project: #2 Min. Hours
521 hrs/yr
$253.49
Incl Special Order
$21.56 ;
Qty Watts EXISTING Luminaire
4 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L4
Area C: Rest Area
Project: #3 Fire Station Longer Hours
1,564 hrs/yr
$163.31
Incl Special Order
$20.65 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L2
Area D: Meeting Room
Project: #4 Fire Station Hours
1,043 hrs/yr
$105.29 $74.36 ;
Qty Watts EXISTING Luminaire
6 65 INC 065R-1L
Qty Watts NEW Luminaire
10 LED 010W-1L BR6
Project: #5 Fire Station Longer Hours
1,564 hrs/yr
$511.38
Incl Special Order
$113.59 ;
Qty Watts EXISTING Luminaire
8 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L8
Area E: Kitchen
Project: #6 Fire Station Hours
1,043 hrs/yr
$163.31
Incl Special Order
$18.02 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L2
Area F: Hallway
Project: #7 Common Area Hours
2,086 hrs/yr
$255.69
Incl Special Order
$64.03 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L4
Area G: Main Floor Restrooms
Project: #8 Fire Station Hours
1,043 hrs/yr
$326.62
Incl Special Order
$36.05 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L4
Page 3 of 8 Customer Report (01/17/2019 01:52 PM)
Program ID#
-00002743
City of Scandia-15040-v2
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
Recommended Lighting Projects
2QH6WRS(IILFLHQF\6KRS
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed Cost
(Without Rebate)
Estimated
Annual
Savings
Select
Area H: Dispatch
Project: #9 Fire Station Hours
1,043 hrs/yr
$163.31
Incl Special Order
$18.02 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L2
Area I: Fire Offices
Project: #10 Fire Station Hours
1,043 hrs/yr
$326.62
Incl Special Order
$36.05 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L4
Area J: Upstairs Gym and Activity Room
Project: #11 Fire Station Hours
1,043 hrs/yr
$570.35
Incl Special Order
$56.78 ;
Qty Watts EXISTING Luminaire
9 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L9
Area K: Upstairs Sheriff's Offices
Project: #12 Fire Station Hours
1,043 hrs/yr
$319.61
Incl Special Order
$61.96 ;
Qty Watts EXISTING Luminaire
5 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L5
Area L: Bedroom
Project: #13 Min. Hours
521 hrs/yr
$127.85
Incl Special Order
$21.16 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Area M: Mechanical Room
Project: #14 Min. Hours
521 hrs/yr
$316.86
Incl Special Order
$26.94 ;
Qty Watts EXISTING Luminaire
5 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L5
Area N: Entry/Stairs
Project: #15 Public Works Hours
2,607 hrs/yr
$63.37
Incl Special Order
$9.06 ;
Qty Watts EXISTING Luminaire
1 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L1
Project: #16 Fire Station Hours
1,043 hrs/yr
$63.92
Incl Special Order
$12.39 ;
Qty Watts EXISTING Luminaire
1 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L1
Page 4 of 8 Customer Report (01/17/2019 01:52 PM)
Program ID#
-00002743
City of Scandia-15040-v2
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
Recommended Lighting Projects
2QH6WRS(IILFLHQF\6KRS
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed Cost
(Without Rebate)
Estimated
Annual
Savings
Select
Area O: Public Works Garage
Project: #17 Public Works Hours
2,607 hrs/yr
$9,461.45
Incl Special Order
$1,263.81 ;
Qty Watts EXISTING Luminaire
24 257.60 T12 HO 8' 110S2 2L (EISA= T8 HO 8' 86E2 2L)
Qty Watts NEW Luminaire
95 LED 095W 1L-NewFix-24
Area P: Public Works Office
Project: #18 Public Works Hours
2,607 hrs/yr
$326.62
Incl Special Order
$51.82 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L4
Area Q: Mezzanine
Project: #19 Public Works Hours
2,607 hrs/yr
$126.75
Incl Special Order
$18.14 ;
Qty Watts EXISTING Luminaire
2 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Area R: Public Works Utility/RR
Project: #20 Min. Hours
521 hrs/yr
$126.75
Incl Special Order
$10.77 ;
Qty Watts EXISTING Luminaire
2 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Area S: Exterior
Project: #21 Exterior
4,380 hrs/yr (Night-Only)
$2,277.17
Incl Special Order
$287.80 ;
Qty Watts EXISTING Luminaire
7 173 MH 150W STD1 1L
Qty Watts NEW Luminaire
24 LED 30W New Wall Pack Fixture7
Project: #22 Exterior
4,380 hrs/yr (Night-Only)
$4,226.10
Incl Special Order
$572.85 ;
Qty Watts EXISTING Luminaire
12 210 MH 175W STD1 1L
Qty Watts NEW Luminaire
37 LED 037W 1L-Exterior-NewFix12
Totals (Including special orders)$28,684.12 $3,675.11
Page 5 of 8 Customer Report (01/17/2019 01:52 PM)
Program ID#
-00002743
City of Scandia-15040-v2
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
I, the undersigned, agree that to the best of my knowledge the lighting schedule below accurately describes how the lights are operated
at the facility listed in this document. I understand that the energy or cost savings reflected in this analysis are estimates, and that
Center for Energy and Environment (CEE) and Xcel Energy do not guarantee that a specific level of energy or cost savings will result
from the implementation of energy conservation measures or the use of products funded under this program. I also give CEE
SHUPLVVLRQWRVXEPLWRQP\EHKDOIDOO;FHO(QHUJ\UHEDWHDQGILQDQFLQJIRUPVUHTXLUHGIRUWKH2QH6WRS(IILFLHQF\6KRSSURJUDP
Signature Date
Customer Cost: $25,737.30 (Including special orders)
I understand that CEE and its staff do not perform lighting installation services. I agree to have CEE contact a participating contractor
who will contact me to schedule a time to perform a walk-through inspection, and, if I agree to hire the contractor, to schedule a time
to complete the lighting installations that are checked under the "Selected" column of this document. I understand that I must enter
into a separate agreement with the contractor to receive lighting installation services. I understand that contractors generally perform
installation during weekdays and labor will be charged accordingly. I understand that the contractor will provide a one-year warranty
on all labor and equipment that will be installed as part of this program and that the terms of the warranty will be part of my
agreement with the contractor. I understand that the contractor alone, and not CEE, provides a warranty on the installation services. I
further understand that all electrical code violations that are found during a contractor's inspection or during installation must be
brought up to code at my expense. Costs for correcting code violations are NOT included in the installation costs quoted in this
document.
%\VLJQLQJEHORZ,FHUWLI\WKDW,KDYHUHDGXQGHUVWDQGDQGZLOOFRPSO\ZLWKWKHDWWDFKHG2QH6WRS(IILFLHQF\6KRS58/(6DQG
REQUIREMENTS, and that I can not apply for other rebates offered by Xcel Energy or any other energy-efficiency program towards
lamps or lighting work covered by this agreement.
Financed
Cash
Select One
Lighting Schedules
Customer Participation Agreement
2QH6WRS(IILFLHQF\6KRS
Your lighting savings are based on the following average hours of operation
Lighting Schedule Name Mon Tues Wed Thur Fri Sat Sun
Common Area Hours
2,086 hrs/yr
8.0 hrs 8.0 hrs 8.0 hrs 8.0 hrs 8.0 hrs
Exterior
4,380 hrs/yr
12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs
Fire Station Hours
1,043 hrs/yr
4.0 hrs 4.0 hrs 4.0 hrs 4.0 hrs 4.0 hrs
Fire Station Longer Hours
1,564 hrs/yr
6.0 hrs 6.0 hrs 6.0 hrs 6.0 hrs 6.0 hrs
Min. Hours
521 hrs/yr
2.0 hrs 2.0 hrs 2.0 hrs 2.0 hrs 2.0 hrs
Public Works Hours
2,607 hrs/yr
10.0 hrs 10.0 hrs 10.0 hrs 10.0 hrs 10.0 hrs
Page 6 of 8 Customer Report (01/17/2019 01:52 PM)
Program ID#
-00002743
City of Scandia-15040-v2
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
21(6723()),&,(1&<6+23352*5$058/(6DQG5(48,5(0(176
1. Rebate items must be installed at the Xcel Energy electric account
listed on the application.
2. All equipment must be new. Used or rebuilt equipment is not eligible
for a rebate.
3. All removed lighting equipment (lamps, ballasts and fixtures) must be
properly recycled, and cannot be sold or reused at another location.
Documentation may be required to ensure compliance with proper
disposal of equipment.
4. Energy-efficient equipment must result in an electric load reduction.
5. Xcel Energy and CEE recommend Illuminating Engineering Society
(IES) light levels. Participant is responsible for approval of final light
levels.
6. Rebates are offered for interior lighting, exterior canopy lighting,
soffit fixtures, wall pack fixtures, parking garage and parking lot
lighting. Rebates will not be issued for street lighting. Most screw-in
compact fluorescent lamps (CFLs) are not eligible for rebates.
7. Lamps or other equipment that have already been rebated through any
other Xcel Energy rebate programs are ineligible for a rebate under the
2QH6WRS(IILFLHQF\6KRS7KLVLQFOXGHVXSVWUHDPSURJUDPVWKDW
provide incentives to manufacturers, distributors and retailers to sell
products at a discounted price.
8. CEE reserves the right to disallow a rebate if it determines, in its sole
judgment, that the lighting technology is inappropriately applied or light
levels are inadequate. Contact your CEE consultant to determine
qualification of custom or specialty lighting projects.
9. Equipment must be purchased, properly installed and fully operating
prior to submitting an application for a rebate.
A Minnesota Conservation Improvement Program (CIP) Offered by Center for Energy and Environment
10. The ³Vendor´is any person or company that is consulting on the
project, selling the project to the participant, completing the work and/or
supplying the materials. Vendor is an independent contractor and not an
agent or representative of Xcel Energy or CEE, has no authority to bind
Xcel Energy or CEE, and is solely responsible for sub-contractors the
Vendor hires to do some or all of the work and/or supply materials.
11. The Vendor must clearly communicate to the Participant the purpose
DQGUHTXLUHPHQWVRIWKH2QH6WRS(IILFLHQF\6KRSLQFOXGLQJ
eligibility requirements for lighting rebates. The Vendor must involve
the CEE consultant in communications with the Participant, and must
keep the CEE consultant fully informed regarding all details of the
transaction.
Eligibility Requirements
Vendor Responsibilities
12. Vendors are responsible for reviewing, signing and returning the
Contractor Report to CEE before materials are ordered. By signing the
Contractor Report, the Vendor represents and warrants that the
transaction complies with these Rules and Requirements and that the
project specifications in the Contractor Report are accurate, acceptable
and will be installed as specified.
13. Any inaccuracies concerning project specifications must be reported
immediately to a CEE consultant so they can be addressed, the rebate
recalculated if necessary and a revised report issued to the Vendor and
the Participant.
14. Vendor must contact a CEE consultant whenever there are changes
to the project so that equipment eligibility can be confirmed and the
rebate value can be re-calculated if necessary.
15. CEE will not be responsible for changes in the rebate value if the
Vendor does not sign and return the Contractor Report, and report:
inaccuracies in the Contractor Report; changes in the equipment to be
installed; or changes in the project during construction.
Rebate Calculations
16. Rebate values are based on CEE¶s calculation of electric demand
(KW) and energy (kWh) savings. Hours used for calculation of the
kWh savings must be an accurate representation of the Participant¶s
operating schedule.
17. Electric demand and energy savings are calculated using lighting
efficiency baselines established by the Energy Independence and
Security Act (EISA). EISA standards apply to most T12 and
incandescent lighting technologies today, and will apply to other
technologies as efficiency requirements continue to be phased in.
18. If an Xcel Energy lighting rebate was previously assigned to this
account and the rebated lighting was subsequently converted to a less
efficient lighting system, a One-Stop consultant must review the
situation to determine the correct baseline energy use for calculating
the rebate.
19. Rebates are based on the energy use of the equipment actually
installed at the site and the Participant¶s Project Cost. Rebates will be
recalculated if the final equipment and Participant¶s Project Cost is
different than originally approved by CEE.
20. Rebates cannot exceed 60 percent of the Participant¶s Project Cost,
XQOHVVRWKHUZLVHVSHFLILHGE\WKH2QH6WRS(IILFLHQF\6KRS7KH
minimum rebate paid is $5.00.
21³Participant¶s Project Cost´means the Participant¶s financial
obligation for the lighting retrofit based on the total project cost less
any and all Deductions, regardless of when these Deductions are
received.
7KH2QH6WRS(IILFLHQF\6KRSOLJKWLQJHIILFLHQF\SURJUDP2QH6WRS(IILFLHQF\6KRSDGPLQLVWHUHGE\&HQWHUIRU(QHUJ\DQG
Environment ³CEE´and funded through Xcel Energy, offers cash rebates to eligible small business customers ³Participant´who purchase and
install qualifying energy-efficient lighting products in existing buildings.
7KHLQWHQWRIWKH2QH6WRS(IILFLHQF\6KRSRSHUDWLQJDVD0LQQHVRWD&RQVHUYDWLRQ,PSURYHPHQW3URJUDP&,3LVWRLQFHQWLYL]H;FHO
Energy¶s customers to install energy efficient equipment earlier than they would have otherwise by defraying a portion of the cost of the retrofit.
To ensure that the program operates as intended, the Participant must have a financial stake in the transaction and the Participant¶s Project Cost
PXVWEHJUHDWHUWKDQ]HURWRUHFHLYHD2QH6WRS(IILFLHQF\6KRSUHEDWH
Participant Qualifications
2QH6WRS(IILFLHQF\6KRSUHEDWHVDSSO\RQO\WRTXDOLILHG;FHO(QHUJ\FXVWRPHUVZLWKDYDOLGFRPPHUFLDOHOHFWULFDFFRXQWLQ;FHO(QHUJ\¶s
0LQQHVRWDVHUYLFHWHUULWRU\WKDWPHHW2QH6WRS(IILFLHQF\6KRSHOLJLELOLW\UHTXLUHPHQWV7KH9HQGRURU3DUWLFLSDQWPXVWYHULI\ZLWKD&((
FRQVXOWDQWWKDWDQ;FHO(QHUJ\DFFRXQWLVHOLJLEOHIRU2QH6WRS(IILFLHQF\6KRSUHEDWHVEHIRUHFRPPLWWLQJWRSXUFKDVLQJHTXLSPHQWIRURU
LPSOHPHQWLQJDSURMHFW7RGHWHUPLQHLIDEXVLQHVVTXDOLILHVIRUWKH2QH6WRS(IILFLHQF\6KRSSOHDVHFRQWDFW&((DW
Page 1 of 2
Page 7 of 8 Customer Report 01/17/2019 01:52 PM Program ID#-00002743
21(6723()),&,(1&<6+23352*5$058/(6DQG5(48,5(0(176
22³Deductions´means anything of value received by the Participant
that reduces the Participant¶s actual out-of-pocket cost for the lighting
retrofit including, but not limited to: labor or material donations;
monetary donations; labor or material cost deductions; grants; awards,
rebates; or any other assistance of monetary value provided, directly or
indirectly, by the Vendor, its agents or representatives to reduce the
Participant¶s actual financial obligation for the lighting project.
23. The following types of financial transactions are not allowed as
methods of payment by the Participant for the lighting project: barter,
in-kind donations and performance contracting.
24. All Deductions must be separately itemized on the final invoice
submitted to CEE. The Participant¶s Project Cost must be greater than
]HURWRUHFHLYHD2QH6WRS(IILFLHQF\6KRSUHEDWH
A Minnesota Conservation Improvement Program (CIP) Offered by Center for Energy and Environment
25. The Vendor must submit an accurate, complete and transparent final
invoice for the completed lighting retrofit. All parties involved in the
project, including the Participant and CEE, must have a clear
understanding of the scope of work and associated project costs,
including any Deductions that have been applied.
26. Invoice(s) submitted must include: (1) itemized quantity,
manufacturer¶s make and model numbers for each material item, (2) a
lump sum amount for both material and labor, and (3) grand total project
cost. In some cases, original equipment manufacturer (OEM)
specification sheets may be requested for verification or clarification.
27. The Vendor must provide the Participant an invoice that reflects the
same financial information that is submitted to CEE, including any
Deductions that have been applied.
Invoice
32. In cases of deferred payment, CEE reserves the right to process the
rebate only when full payment is received by the Vendor from the
Participant. All financed and alternate payment plans must be
documented with detailed, legally obligating and signed contracts. CEE
reserves the right to disallow any payment plan that its staff determines
is not in compliance with the program design intent and rules.
33. Rebates will not be disbursed until the project is fully installed and
verified.
34. The rebate check will be sent to the Participant (i.e., Xcel Energy
account holder) listed on the rebate application, unless otherwise
authorized by CEE.
Xcel Energy will issue rebates in the form of checks, not utility bill
credits.
35. Once completed paperwork is submitted and approved, rebate
payments are usually made in 6 to 8 weeks.
Special Notices
36. Xcel Energy and CEE reserve the right to refuse payment or
SDUWLFLSDWLRQLQWKH2QH6WRS(IILFLHQF\6KRSLIWKH3DUWLFLSDQWRU
Vendor violates program design intent, rules and procedures. Xcel
Energy and CEE are not liable for rebates promised to Participants as a
result of a Vendor misrepresenting the program.
377KH2QH6WRS(IILFLHQF\6KRSLVVXEMHFWWR60 days notice of
cancellation. The Participant and Vendor are responsible for checking
with a CEE consultant to determine whether the program is still in
effect and to verify program requirements.
39. Do not endorse any particular vendor, manufacturer, product or
system design by offering these rebates;
40. Will not be responsible for any tax liability imposed on the
Participant as a result of the payment of rebates;
28. CEE reserves the right to inspect Participant¶s facility(ies) for
installation of materials listed on this rebate application and will need
access to survey the installed project. Participant must keep a sample of
any and all types of equipment removed for a period of three (3) months
after receiving a rebate from Xcel Energy. If the inspection determines
that Participant did not comply with these Rules and Requirements, any
rebate received by Participant must be promptly returned to Xcel Energy.
29. Vendor agrees to promptly provide CEE with such additional
documentation and information as may be necessary to verify
compliance with these Rules and Requirements, such as copies of
cancelled checks or other relevant receipts/records as proof that the
Participant paid the amount reflected on the invoice. Rebates for that
project will not be paid until all requested documentation and
information is provided and verified.
Verification
302QH6WRS(IILFLHQF\6KRSUXOHVDQGUHEDWHHOLJLELOLW\UHTXLUHPHQWV
are subject to change. It is the Participant's and Vendor's responsibility
to verify with CEE that estimated rebates are still valid before
committing to, purchasing equipment for or implementing a project.
CEE will not pay a rebate for projects where the invoice is submitted
more than 12 months after the start of the project.
31. Xcel Energy and CEE are not responsible for any lost, late, stolen,
ineligible, illegible, misdirected or postage-due mail. All completed
rebate applications and other submissions in connection with the One-
6WRS(IILFLHQF\6KRSEHFRPHWKHSURSHUW\RI;FHO(QHUJ\DQG&((
and will not be returned.
Rebate Application and Payment
Disclaimers
38. CEE RESERVES THE RIGHT TO DISQUALIFY NON-
COMPLIANT VENDORS FROM PARTICIPATION IN THE
21(6723()),&,(1&<6+23
41. EXPRESSLY DISCLAIM ALL WARRANTIES, EXPRESSED
OR IMPLIED, AND ANY IMPLIED WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE
WITH RESPECT TO ANY PRODUCTS, EQUIPMENT, MATERIAL
OR WORKMANSHIP PROVIDED, SUPPLIED OR INSTALLED IN
&211(&7,21:,7+7+(21(6723()),&,(1&<6+23
Warranties, if any, are between Participant and equipment manufacturer
(s) and/or Vendors.
Xcel Energy and CEE:
42. Are not responsible for the disposal of removed lighting equipment
(lamps, ballasts and/or fixtures) replaced as a result of this program,
when required for optimum lighting performance;
43. In no event shall be liable for any indirect, special, incidental,
consequential or punitive damages arising out of or relating to
DGPLQLVWHULQJWKH2QH6WRS(IILFLHQF\6KRS
44. Do not guarantee that a specific level of energy or cost savings will
result from the implementation of energy conservation measures or the
use of products funded under this program.
Page 2 of 2
CEE FACET, Program Rules # 130326
For more information, contact CEE at
Phone: (612) 244-2427 Fax: (612) 335-5888.
Mail To: Center for Energy and Environment
212 3rd Avenue North, Suite 560
Minneapolis, MN 55401
Page 8 of 8 Customer Report 01/17/2019 01:52 PM Program ID#-00002743
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
FIRE STATION GARAGE (*$3,872.60)
-Retrofit (24) 2-lamp T12HO fluorescent to 4-lamp bypass LED
5K 18W
18W LED T8 ballast bypass ETH-T8-4F-18 5000K HYBRID96 10.41 999.36
Retrofit Bracket (converts fixture from (2) 8' lamps to (4) 4' lamps)24 13.755 330.12
Labor22 110.00 2,420.00
Lamp Disposal 8'48 2.175 104.40
Ballast Disposal24 0.78 18.72
UTILITY ROOM (*$191.96)
-Retrofit (4) 2-lamp T8 fluorescent to 2-lamp bypass LED 5K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 5000K HYBRID8 9.375 75.00
Labor1 110.00 110.00
Lamp Disposal 4'8 0.48 3.84
Ballast Disposal4 0.78 3.12
REST AREA (*$115.69)
-Retrofit (2) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID6 9.375 56.25
Labor0.5 110.00 55.00
Lamp Disposal 4'6 0.48 2.88
Ballast Disposal2 0.78 1.56
Page 1
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
MEETING ROOM (*$)
-Retrofit (8) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
-Relamp (6) 75W recess lights to 10W LED BR30
-Replace incand. dimmer with LED rated 3-way (white)
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID24 9.375 225.00
10W BR30 Lamp Halco6 15.345 92.07
Lutron AYCL Dimmer WHITE1 32.15 32.15
Labor2.75 110.00 302.50
Lamp Disposal 4'24 0.48 11.52
Ballast Disposal8 0.78 6.24
KITCHEN (*$115.67)
-Retrofit (2) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID6 9.37167 56.23
Labor0.5 110.00 55.00
Lamp Disposal 4'6 0.48 2.88
Ballast Disposal2 0.78 1.56
HALLWAY (*$231.38)
-Retrofit (4) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID12 9.375 112.50
Page 2
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
Labor1 110.00 110.00
Lamp Disposal 4'12 0.48 5.76
Ballast Disposal4 0.78 3.12
MAIN FLOOR RESTROOM (*$231.38)
-Retrofit (4) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID12 9.375 112.50
Labor1 110.00 110.00
Lamp Disposal 4'12 0.48 5.76
Ballast Disposal4 0.78 3.12
DISPATCH (*$118.81)
-Retrofit (2) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID6 9.375 56.25
Labor0.5 110.00 55.00
Lamp Disposal 4'6 0.48 2.88
Ballast Disposal6 0.78 4.68
FIRE OFFICES (*$231.38)
-Retrofit (4) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID12 9.375 112.50
Labor1 110.00 110.00
Page 3
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
Lamp Disposal 4'12 0.48 5.76
Ballast Disposal4 0.78 3.12
UPSTAIRS GYM/ACTIVITY (*$2329.91)
-Remove (9) 2 lamp T8 fixtures
-Wire and install (9) LED Ready 2x4 lay in fixtures with 3 15W
Lamps
-Wire and install (2) LED Ready 2-lamp strip fixtures with 2 15W
Lamps
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID31 9.37516 290.63
2x4 LED ready 3-lamp fixture RG24-332LED-29 63.07556 567.68
4' LED ready 2-lamp wrap fixture 769-2-32-LED2E2 40.47 80.94
Labor12.5 110.00 1,375.00
Lamp Disposal18 0.48 8.64
Ballast Disposal9 0.78 7.02
UPSTAIRS SHERIFF's OFFICES (*$289.23)
-Retrofit (5) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID15 9.37533 140.63
Labor1.25 110.00 137.50
Lamp Disposal 4'15 0.48 7.20
Ballast Disposal5 0.78 3.90
Page 4
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
BEDROOM (*$115.69)
-Retrofit (2) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID6 9.375 56.25
Labor0.5 110.00 55.00
Lamp Disposal 4'6 0.48 2.88
Ballast Disposal2 0.78 1.56
MECHANICAL ROOM (*$377.45)
-Retrofit (5) 2-lamp T8 fluorescent to 2-lamp bypass LED 5K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 5000K HYBRID10 9.375 93.75
Labor2.5 110.00 275.00
Lamp Disposal 4'10 0.48 4.80
Ballast Disposal5 0.78 3.90
ENTRY (*$115.69)
-Retrofit (2) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID6 9.375 56.25
Labor0.5 110.00 55.00
Lamp Disposal6 0.48 2.88
Ballast Disposal2 0.78 1.56
Page 5
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
PUBLIC WORKS GARAGE (*$3,872.60)
-Retrofit (24) 2-lamp T12HO fluorescent to 4-lamp bypass LED
5K 18W
18W LED T8 ballast bypass ETH-T8-4F-18 5000K HYBRID96 10.41 999.36
Retrofit Bracket (converts fixture from (2) 8' lamps to (4) 4' lamps)24 13.755 330.12
Labor22 110.00 2,420.00
Lamp Disposal 8'48 2.175 104.40
Ballast Disposal24 0.78 18.72
PUBLIC WORKS OFFICE (*$231.38)
-Retrofit (4) 3-lamp T8 fluorescent to 3-lamp bypass LED 4K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 4000K HYBRID12 9.375 112.50
Labor1 110.00 110.00
Lamp Disposal 4'12 0.48 5.76
Ballast Disposal4 0.78 3.12
MEZZANINE (*$95.98)
-Retrofit (2) 2-lamp T8 fluorescent to 2-lamp bypass LED 5K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 5000K HYBRID4 9.375 37.50
Labor0.5 110.00 55.00
Lamp Disposal 4'4 0.48 1.92
Ballast Disposal2 0.78 1.56
Page 6
ESTIMATE
DATE
2/25/2019
BID #
26423
BID TO
City of Scandia
15040 Scandia Trail N
Scandia, MN 55073-9708
Norske Electric, Inc
3540 Kilkenny Ln, Ste 100
Hamel, MN 55340
952-443-4113
BID EXPIRES 60 DAYS FROM DATE
PROJECT NOTES:
Total
DESCRIPTIONQTY PRICE Total
PUBLIC WORKS UTILITY (*$95.98)
-Retrofit (2) 2-lamp T8 fluorescent to 2-lamp bypass LED 5K 15W
15W LED T8 ballast bypass ETH-T8-4F-15 5000K HYBRID4 9.375 37.50
Labor0.5 110.00 55.00
Lamp Disposal4 0.48 1.92
Ballast Disposal2 0.78 1.56
EXTERIOR (*$4842.33)
-Remove (12) 250W Metal Halide Wall Pack Fixtures
-Remove (7) 175W Metal Halide Wall Pack Fixtures
40W Wall Pack Howard MWP-4040R-LED-MV19 176.41526 3,351.89
Labor12 110.00 1,320.00
Lamp Disposal HID19 4.09526 77.81
Ballast Disposal HID19 4.87526 92.63
SCISSORS LIFT 2-day1 275.00 275.00
Page 7
_____________________________________________agrees to pay for the described electrical work upon completion by Norske Electric. Any
items added after this bid is accepted will be an extra charge to ________________________________________________. Any past due balance
will be subject to a FINANCE CHARGE of 2% per month. This is equal to an annual rate of 24%. This contract also serves as notice that if
NORSKE ELECTRIC is unable to collect final payment a MECHANICS' LIEN will be filed against said property. This bid includes all labor,
materials and permits necessary to complete described project. NORSKE ELECTRIC requires fifty percent payment after rough in of bid project
for everyone without an established credit line with NORSKE ELECTRIC.
Approved by: ________________________________________________of Norske Electric
Approved by: ________________________________________________of ________________________________________________
Date: ______________________________
$18,419.59
Prepared by Lighting Specialist:
Charlie Ketchum
Center for Energy and Environment
212 3rd Avenue North, Suite 560
Minneapolis, MN 55401
Phone:
(612) 518-4008Mobile:
(612) 335-5888Fax:
cketchum@mncee.orgE-mail:
- Financing
Kristen Funk
Center for Energy and Environment
212 3rd Avenue North, Suite 560
Minneapolis, Minnesota 55401
612-335-3487Phone:
612-335-5888Fax:
kfunk@mncee.orgE-mail:- Contractors
- Rebates
- Audits
Program Coordinator:
www.mncee.org
City of Scandia-15040-vNorske
Property Address:
15040 Scandia Trl N
Scandia, MN 55073-9708
February 25, 2019
Prepared for:
15040 Scandia Trl N
Scandia, MN 55073-9708
City of Scandia-
Cost Saving Recommendations
Lighting System Analysis
Customer Report
2QH6WRS(IILFLHQF\6KRS
Building Energy Efficiency Program
Page 1 of 8 Customer Report 02/25/2019 03:34 PM Program ID#-00002743
3.4 years$4,437.06
*Job must be completed and invoices submitted within 90 days or by 12/31/2019, whichever comes first. One-Stop reserves
the right to withdraw this rebate offer after expiration. You may request an extension, which includes re-verification of
eligibility, kW/kWh savings, installation costs, estimated rebate, and program rules by One-Stop.
After rebate (a)
(Including special orders)
Lighting Upgrades Estimated Costs
$18,419.59Total Installed Cost
$15,234.00Your Final Cost
Estimated
Annual Savings Payback
Rebate equals 17% of installed cost.Ö
Before rebate
$3,185.59Utility Rebate*
Estimated monthly savings $369.76
$379.87Monthly loan payments at 3.9% for 44 month term
(a)
(b) Estimate based on a loan amount of $15,434.00, including a $200.00 loan processing fee. Mortgage,
flood and title fees may apply. The loan term has a maximum of 5 years, with monthly payments not less
than the estimated monthly savings. Final terms and conditions set by lender upon loan approval.
3.8 years(b)
CEE Financing Option
(Including Loan Financing
Charges)
* How do CO2HPLVVLRQVDIIHFWPHDQGP\EXVLQHVV"5LVLQJFRQFHQWUDWLRQVRIJUHHQKRXVHJDVVHV*+*SURGXFHDQLQFUHDVHLQWKHDYHUDJH
surface temperature of the Earth over time. Rising temperatures produce changes in precipitation patterns, storm severity, and sea level
commonly referred to as ´climate change.µ&DUERQGLR[LGH&22), methane, nitrous oxide and four groups of fluorinated gases (sulfur
hexafluoride, HFCs, PFCs and CFCs) are the major GHG. In the U.S., GHG emissions come primarily from the combustion of fossil fuels in energy
use. CO2 emissions from coal-fired electricity generation comprise nearly 80 percent of the total CO2 emissions produced by the generation of
HOHFWULFLW\LQWKH86,QVWDOOLQJHQHUJ\HIILFLHQWOLJKWLQJDQGLPSOHPHQWLQJRWKHUFRQVHUYDWLRQPHDVXUHVWKDWUHGXFHHOHFWULFHQHUJ\XVH
significantly reduces GHG emmissions and mitigates global climate change. Read more at: www.eia.doe.gov or www.epa.gov
55,331
$4,437.06 (a)41,206
14,126
22.356
15.785
6.571
$6,254.48
$1,817.42
Existing Lights
New Lights
94,063
70,049
24,014
ŻEstimated Savings *
Utility Cost Analysis Demand (KW)Energy (KWh)Annual Cost CO2 (lbs)*
(a) Savings estimates are based on standard engineering calculations and are NOT guaranteed. Your actual savings may be higher or lower
depending on various factors, including how you operate your lights and other electric equipment in your building. Electric Utility Rates =
$0.0630/KWh and $13.30/KW, where Demand cost savings occurs primarily during the summer months peak rate hours of 9am to 9pm.
(13 [00,00 ] [0] [00,00] [00] [True] [11.535KW] )
Summary of Recommended Lighting Upgrades
2QH6WRS(IILFLHQF\6KRS
Page 2 of 8 Customer Report (02/25/2019 03:34 PM)
Program ID#
-00002743
City of Scandia-15040-vNorske
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
Recommended Lighting Projects
2QH6WRS(IILFLHQF\6KRS
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed Cost
(Without Rebate)
Estimated
Annual
Savings
Select
Area A: Fire Station Garage
Project: #1 Fire Station Hours
1,564 hrs/yr
$3,261.43
Incl Special Order
$1,149.89 ;
Qty Watts EXISTING Luminaire
24 257.60 T12 HO 8' 110S2 2L (EISA= T8 HO 8' 86E2 2L)
Qty Watts NEW Luminaire
72 LED LinearT8 4' 18W 4L-Bypass-w/brkt24
Area B: Utility Room
Project: #2 Min. Hours
521 hrs/yr
$246.28
Incl Special Order
$21.56 ;
Qty Watts EXISTING Luminaire
4 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L4
Area C: Rest Area
Project: #3 Fire Station Longer Hours
1,564 hrs/yr
$158.46
Incl Special Order
$20.65 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L2
Area D: Meeting Room
Project: #4 Fire Station Hours
1,564 hrs/yr
$102.89 $85.19 ;
Qty Watts EXISTING Luminaire
6 65 INC 065R-1L
Qty Watts NEW Luminaire
10 LED 010W-1L BR6
Project: #5 Fire Station Longer Hours
1,564 hrs/yr
$496.96
Incl Special Order
$113.59 ;
Qty Watts EXISTING Luminaire
8 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L8
Area E: Kitchen
Project: #6 Fire Station Hours
1,564 hrs/yr
$158.46
Incl Special Order
$20.65 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L2
Area F: Hallway
Project: #7 Common Area Hours
2,086 hrs/yr
$248.48
Incl Special Order
$64.03 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L4
Area G: Main Floor Restrooms
Project: #8 Fire Station Hours
1,564 hrs/yr
$316.93
Incl Special Order
$41.30 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L4
Page 3 of 8 Customer Report (02/25/2019 03:34 PM)
Program ID#
-00002743
City of Scandia-15040-vNorske
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
Recommended Lighting Projects
2QH6WRS(IILFLHQF\6KRS
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed Cost
(Without Rebate)
Estimated
Annual
Savings
Select
Area H: Dispatch
Project: #9 Fire Station Hours
1,564 hrs/yr
$158.46
Incl Special Order
$20.65 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L2
Area I: Fire Offices
Project: #10 Fire Station Hours
1,564 hrs/yr
$316.93
Incl Special Order
$41.30 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L4
Area J: Upstairs Gym and Activity Room
Project: #11 Fire Station Hours
1,564 hrs/yr
$1,722.75
Incl Special Order
$14.71 ;
Qty Watts EXISTING Luminaire
9 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L w/New 2x4 Prismatic9
30 LED 015W Linear-T8-Bypass-4' 2L w/New 4' Wrap2
Area K: Upstairs Sheriff's Offices
Project: #12 Fire Station Hours
1,564 hrs/yr
$310.60
Incl Special Order
$70.99 ;
Qty Watts EXISTING Luminaire
5 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L5
Area L: Bedroom
Project: #13 Min. Hours
521 hrs/yr
$124.25
Incl Special Order
$21.16 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Area M: Mechanical Room
Project: #14 Min. Hours
521 hrs/yr
$307.85
Incl Special Order
$26.94 ;
Qty Watts EXISTING Luminaire
5 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L5
Area N: Entry/Stairs
Project: #15 Fire Station Hours
1,564 hrs/yr
$124.25
Incl Special Order
$28.39 ;
Qty Watts EXISTING Luminaire
2 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Page 4 of 8 Customer Report (02/25/2019 03:34 PM)
Program ID#
-00002743
City of Scandia-15040-vNorske
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
Recommended Lighting Projects
2QH6WRS(IILFLHQF\6KRS
Recommended Lighting System Upgrades
Schedule Name
& Hours/year
of Operation
Installed Cost
(Without Rebate)
Estimated
Annual
Savings
Select
Area O: Public Works Garage
Project: #16 Public Works Hours
2,607 hrs/yr
$3,261.43
Incl Special Order
$1,442.58 ;
Qty Watts EXISTING Luminaire
24 257.60 T12 HO 8' 110S2 2L (EISA= T8 HO 8' 86E2 2L)
Qty Watts NEW Luminaire
72 LED LinearT8 4' 18W 4L-Bypass-w/brkt24
Area P: Public Works Office
Project: #17 Public Works Hours
2,607 hrs/yr
$316.93
Incl Special Order
$51.82 ;
Qty Watts EXISTING Luminaire
4 85 T8 4' 32 E3-3L-Exist*
Qty Watts NEW Luminaire
45 LED 015W Linear-T8-Bypass-4' 3L4
Area Q: Mezzanine
Project: #18 Public Works Hours
2,607 hrs/yr
$123.15
Incl Special Order
$18.14 ;
Qty Watts EXISTING Luminaire
2 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Area R: Public Works Utility/RR
Project: #19 Min. Hours
521 hrs/yr
$123.15
Incl Special Order
$10.77 ;
Qty Watts EXISTING Luminaire
2 58 T8 4' 32 E2-2L-Exist*
Qty Watts NEW Luminaire
30 LED 015W Linear-T8-Bypass-4' 2L2
Area S: Exterior
Project: #20 Exterior
4,380 hrs/yr (Night-Only)
$6,539.95
Incl Special Order
$1,172.75 ;
Qty Watts EXISTING Luminaire
12 295 MH 250W STD1 1L
7 210 MH 175W STD1 1L
Qty Watts NEW Luminaire
40 LED 040W 1L-NewFix19
Totals (Including special orders)$18,419.59 $4,437.06
Page 5 of 8 Customer Report (02/25/2019 03:34 PM)
Program ID#
-00002743
City of Scandia-15040-vNorske
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
I, the undersigned, agree that to the best of my knowledge the lighting schedule below accurately describes how the lights are operated
at the facility listed in this document. I understand that the energy or cost savings reflected in this analysis are estimates, and that
Center for Energy and Environment (CEE) and Xcel Energy do not guarantee that a specific level of energy or cost savings will result
from the implementation of energy conservation measures or the use of products funded under this program. I also give CEE
SHUPLVVLRQWRVXEPLWRQP\EHKDOIDOO;FHO(QHUJ\UHEDWHDQGILQDQFLQJIRUPVUHTXLUHGIRUWKH2QH6WRS(IILFLHQF\6KRSSURJUDP
Signature Date
Customer Cost: $15,234.00 (Including special orders)
I understand that CEE and its staff do not perform lighting installation services. I agree to have CEE contact a participating contractor
who will contact me to schedule a time to perform a walk-through inspection, and, if I agree to hire the contractor, to schedule a time
to complete the lighting installations that are checked under the "Selected" column of this document. I understand that I must enter
into a separate agreement with the contractor to receive lighting installation services. I understand that contractors generally perform
installation during weekdays and labor will be charged accordingly. I understand that the contractor will provide a one-year warranty
on all labor and equipment that will be installed as part of this program and that the terms of the warranty will be part of my
agreement with the contractor. I understand that the contractor alone, and not CEE, provides a warranty on the installation services. I
further understand that all electrical code violations that are found during a contractor's inspection or during installation must be
brought up to code at my expense. Costs for correcting code violations are NOT included in the installation costs quoted in this
document.
%\VLJQLQJEHORZ,FHUWLI\WKDW,KDYHUHDGXQGHUVWDQGDQGZLOOFRPSO\ZLWKWKHDWWDFKHG2QH6WRS(IILFLHQF\6KRS58/(6DQG
REQUIREMENTS, and that I can not apply for other rebates offered by Xcel Energy or any other energy-efficiency program towards
lamps or lighting work covered by this agreement.
Financed
Cash
Select One
Lighting Schedules
Customer Participation Agreement
2QH6WRS(IILFLHQF\6KRS
Your lighting savings are based on the following average hours of operation
Lighting Schedule Name Mon Tues Wed Thur Fri Sat Sun
Common Area Hours
2,086 hrs/yr
8.0 hrs 8.0 hrs 8.0 hrs 8.0 hrs 8.0 hrs
Exterior
4,380 hrs/yr
12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs 12.0 hrs
Fire Station Hours
1,564 hrs/yr
12:00 PM
to
6:00 PM
12:00 PM
to
6:00 PM 6:00 PM
to
12:00 PM 12:00 PM
6:00 PM
to
12:00 PM
to
6:00 PM
Fire Station Longer Hours
1,564 hrs/yr
6.0 hrs 6.0 hrs 6.0 hrs 6.0 hrs 6.0 hrs
Min. Hours
521 hrs/yr
2.0 hrs 2.0 hrs 2.0 hrs 2.0 hrs 2.0 hrs
Public Works Hours
2,607 hrs/yr
10.0 hrs 10.0 hrs 10.0 hrs 10.0 hrs 10.0 hrs
Page 6 of 8 Customer Report (02/25/2019 03:34 PM)
Program ID#
-00002743
City of Scandia-15040-vNorske
15040 Scandia Trl N
Scandia, MN 55073-9708302325966
Xcel Acct#
21(6723()),&,(1&<6+23352*5$058/(6DQG5(48,5(0(176
1. Rebate items must be installed at the Xcel Energy electric account
listed on the application.
2. All equipment must be new. Used or rebuilt equipment is not eligible
for a rebate.
3. All removed lighting equipment (lamps, ballasts and fixtures) must be
properly recycled, and cannot be sold or reused at another location.
Documentation may be required to ensure compliance with proper
disposal of equipment.
4. Energy-efficient equipment must result in an electric load reduction.
5. Xcel Energy and CEE recommend Illuminating Engineering Society
(IES) light levels. Participant is responsible for approval of final light
levels.
6. Rebates are offered for interior lighting, exterior canopy lighting,
soffit fixtures, wall pack fixtures, parking garage and parking lot
lighting. Rebates will not be issued for street lighting. Most screw-in
compact fluorescent lamps (CFLs) are not eligible for rebates.
7. Lamps or other equipment that have already been rebated through any
other Xcel Energy rebate programs are ineligible for a rebate under the
2QH6WRS(IILFLHQF\6KRS7KLVLQFOXGHVXSVWUHDPSURJUDPVWKDW
provide incentives to manufacturers, distributors and retailers to sell
products at a discounted price.
8. CEE reserves the right to disallow a rebate if it determines, in its sole
judgment, that the lighting technology is inappropriately applied or light
levels are inadequate. Contact your CEE consultant to determine
qualification of custom or specialty lighting projects.
9. Equipment must be purchased, properly installed and fully operating
prior to submitting an application for a rebate.
A Minnesota Conservation Improvement Program (CIP) Offered by Center for Energy and Environment
10. The ³Vendor´is any person or company that is consulting on the
project, selling the project to the participant, completing the work and/or
supplying the materials. Vendor is an independent contractor and not an
agent or representative of Xcel Energy or CEE, has no authority to bind
Xcel Energy or CEE, and is solely responsible for sub-contractors the
Vendor hires to do some or all of the work and/or supply materials.
11. The Vendor must clearly communicate to the Participant the purpose
DQGUHTXLUHPHQWVRIWKH2QH6WRS(IILFLHQF\6KRSLQFOXGLQJ
eligibility requirements for lighting rebates. The Vendor must involve
the CEE consultant in communications with the Participant, and must
keep the CEE consultant fully informed regarding all details of the
transaction.
Eligibility Requirements
Vendor Responsibilities
12. Vendors are responsible for reviewing, signing and returning the
Contractor Report to CEE before materials are ordered. By signing the
Contractor Report, the Vendor represents and warrants that the
transaction complies with these Rules and Requirements and that the
project specifications in the Contractor Report are accurate, acceptable
and will be installed as specified.
13. Any inaccuracies concerning project specifications must be reported
immediately to a CEE consultant so they can be addressed, the rebate
recalculated if necessary and a revised report issued to the Vendor and
the Participant.
14. Vendor must contact a CEE consultant whenever there are changes
to the project so that equipment eligibility can be confirmed and the
rebate value can be re-calculated if necessary.
15. CEE will not be responsible for changes in the rebate value if the
Vendor does not sign and return the Contractor Report, and report:
inaccuracies in the Contractor Report; changes in the equipment to be
installed; or changes in the project during construction.
Rebate Calculations
16. Rebate values are based on CEE¶s calculation of electric demand
(KW) and energy (kWh) savings. Hours used for calculation of the
kWh savings must be an accurate representation of the Participant¶s
operating schedule.
17. Electric demand and energy savings are calculated using lighting
efficiency baselines established by the Energy Independence and
Security Act (EISA). EISA standards apply to most T12 and
incandescent lighting technologies today, and will apply to other
technologies as efficiency requirements continue to be phased in.
18. If an Xcel Energy lighting rebate was previously assigned to this
account and the rebated lighting was subsequently converted to a less
efficient lighting system, a One-Stop consultant must review the
situation to determine the correct baseline energy use for calculating
the rebate.
19. Rebates are based on the energy use of the equipment actually
installed at the site and the Participant¶s Project Cost. Rebates will be
recalculated if the final equipment and Participant¶s Project Cost is
different than originally approved by CEE.
20. Rebates cannot exceed 60 percent of the Participant¶s Project Cost,
XQOHVVRWKHUZLVHVSHFLILHGE\WKH2QH6WRS(IILFLHQF\6KRS7KH
minimum rebate paid is $5.00.
21³Participant¶s Project Cost´means the Participant¶s financial
obligation for the lighting retrofit based on the total project cost less
any and all Deductions, regardless of when these Deductions are
received.
7KH2QH6WRS(IILFLHQF\6KRSOLJKWLQJHIILFLHQF\SURJUDP2QH6WRS(IILFLHQF\6KRSDGPLQLVWHUHGE\&HQWHUIRU(QHUJ\DQG
Environment ³CEE´and funded through Xcel Energy, offers cash rebates to eligible small business customers ³Participant´who purchase and
install qualifying energy-efficient lighting products in existing buildings.
7KHLQWHQWRIWKH2QH6WRS(IILFLHQF\6KRSRSHUDWLQJDVD0LQQHVRWD&RQVHUYDWLRQ,PSURYHPHQW3URJUDP&,3LVWRLQFHQWLYL]H;FHO
Energy¶s customers to install energy efficient equipment earlier than they would have otherwise by defraying a portion of the cost of the retrofit.
To ensure that the program operates as intended, the Participant must have a financial stake in the transaction and the Participant¶s Project Cost
PXVWEHJUHDWHUWKDQ]HURWRUHFHLYHD2QH6WRS(IILFLHQF\6KRSUHEDWH
Participant Qualifications
2QH6WRS(IILFLHQF\6KRSUHEDWHVDSSO\RQO\WRTXDOLILHG;FHO(QHUJ\FXVWRPHUVZLWKDYDOLGFRPPHUFLDOHOHFWULFDFFRXQWLQ;FHO(QHUJ\¶s
0LQQHVRWDVHUYLFHWHUULWRU\WKDWPHHW2QH6WRS(IILFLHQF\6KRSHOLJLELOLW\UHTXLUHPHQWV7KH9HQGRURU3DUWLFLSDQWPXVWYHULI\ZLWKD&((
FRQVXOWDQWWKDWDQ;FHO(QHUJ\DFFRXQWLVHOLJLEOHIRU2QH6WRS(IILFLHQF\6KRSUHEDWHVEHIRUHFRPPLWWLQJWRSXUFKDVLQJHTXLSPHQWIRURU
LPSOHPHQWLQJDSURMHFW7RGHWHUPLQHLIDEXVLQHVVTXDOLILHVIRUWKH2QH6WRS(IILFLHQF\6KRSSOHDVHFRQWDFW&((DW
Page 1 of 2
Page 7 of 8 Customer Report 02/25/2019 03:34 PM Program ID#-00002743
21(6723()),&,(1&<6+23352*5$058/(6DQG5(48,5(0(176
22³Deductions´means anything of value received by the Participant
that reduces the Participant¶s actual out-of-pocket cost for the lighting
retrofit including, but not limited to: labor or material donations;
monetary donations; labor or material cost deductions; grants; awards,
rebates; or any other assistance of monetary value provided, directly or
indirectly, by the Vendor, its agents or representatives to reduce the
Participant¶s actual financial obligation for the lighting project.
23. The following types of financial transactions are not allowed as
methods of payment by the Participant for the lighting project: barter,
in-kind donations and performance contracting.
24. All Deductions must be separately itemized on the final invoice
submitted to CEE. The Participant¶s Project Cost must be greater than
]HURWRUHFHLYHD2QH6WRS(IILFLHQF\6KRSUHEDWH
A Minnesota Conservation Improvement Program (CIP) Offered by Center for Energy and Environment
25. The Vendor must submit an accurate, complete and transparent final
invoice for the completed lighting retrofit. All parties involved in the
project, including the Participant and CEE, must have a clear
understanding of the scope of work and associated project costs,
including any Deductions that have been applied.
26. Invoice(s) submitted must include: (1) itemized quantity,
manufacturer¶s make and model numbers for each material item, (2) a
lump sum amount for both material and labor, and (3) grand total project
cost. In some cases, original equipment manufacturer (OEM)
specification sheets may be requested for verification or clarification.
27. The Vendor must provide the Participant an invoice that reflects the
same financial information that is submitted to CEE, including any
Deductions that have been applied.
Invoice
32. In cases of deferred payment, CEE reserves the right to process the
rebate only when full payment is received by the Vendor from the
Participant. All financed and alternate payment plans must be
documented with detailed, legally obligating and signed contracts. CEE
reserves the right to disallow any payment plan that its staff determines
is not in compliance with the program design intent and rules.
33. Rebates will not be disbursed until the project is fully installed and
verified.
34. The rebate check will be sent to the Participant (i.e., Xcel Energy
account holder) listed on the rebate application, unless otherwise
authorized by CEE.
Xcel Energy will issue rebates in the form of checks, not utility bill
credits.
35. Once completed paperwork is submitted and approved, rebate
payments are usually made in 6 to 8 weeks.
Special Notices
36. Xcel Energy and CEE reserve the right to refuse payment or
SDUWLFLSDWLRQLQWKH2QH6WRS(IILFLHQF\6KRSLIWKH3DUWLFLSDQWRU
Vendor violates program design intent, rules and procedures. Xcel
Energy and CEE are not liable for rebates promised to Participants as a
result of a Vendor misrepresenting the program.
377KH2QH6WRS(IILFLHQF\6KRSLVVXEMHFWWR60 days notice of
cancellation. The Participant and Vendor are responsible for checking
with a CEE consultant to determine whether the program is still in
effect and to verify program requirements.
39. Do not endorse any particular vendor, manufacturer, product or
system design by offering these rebates;
40. Will not be responsible for any tax liability imposed on the
Participant as a result of the payment of rebates;
28. CEE reserves the right to inspect Participant¶s facility(ies) for
installation of materials listed on this rebate application and will need
access to survey the installed project. Participant must keep a sample of
any and all types of equipment removed for a period of three (3) months
after receiving a rebate from Xcel Energy. If the inspection determines
that Participant did not comply with these Rules and Requirements, any
rebate received by Participant must be promptly returned to Xcel Energy.
29. Vendor agrees to promptly provide CEE with such additional
documentation and information as may be necessary to verify
compliance with these Rules and Requirements, such as copies of
cancelled checks or other relevant receipts/records as proof that the
Participant paid the amount reflected on the invoice. Rebates for that
project will not be paid until all requested documentation and
information is provided and verified.
Verification
302QH6WRS(IILFLHQF\6KRSUXOHVDQGUHEDWHHOLJLELOLW\UHTXLUHPHQWV
are subject to change. It is the Participant's and Vendor's responsibility
to verify with CEE that estimated rebates are still valid before
committing to, purchasing equipment for or implementing a project.
CEE will not pay a rebate for projects where the invoice is submitted
more than 12 months after the start of the project.
31. Xcel Energy and CEE are not responsible for any lost, late, stolen,
ineligible, illegible, misdirected or postage-due mail. All completed
rebate applications and other submissions in connection with the One-
6WRS(IILFLHQF\6KRSEHFRPHWKHSURSHUW\RI;FHO(QHUJ\DQG&((
and will not be returned.
Rebate Application and Payment
Disclaimers
38. CEE RESERVES THE RIGHT TO DISQUALIFY NON-
COMPLIANT VENDORS FROM PARTICIPATION IN THE
21(6723()),&,(1&<6+23
41. EXPRESSLY DISCLAIM ALL WARRANTIES, EXPRESSED
OR IMPLIED, AND ANY IMPLIED WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE
WITH RESPECT TO ANY PRODUCTS, EQUIPMENT, MATERIAL
OR WORKMANSHIP PROVIDED, SUPPLIED OR INSTALLED IN
&211(&7,21:,7+7+(21(6723()),&,(1&<6+23
Warranties, if any, are between Participant and equipment manufacturer
(s) and/or Vendors.
Xcel Energy and CEE:
42. Are not responsible for the disposal of removed lighting equipment
(lamps, ballasts and/or fixtures) replaced as a result of this program,
when required for optimum lighting performance;
43. In no event shall be liable for any indirect, special, incidental,
consequential or punitive damages arising out of or relating to
DGPLQLVWHULQJWKH2QH6WRS(IILFLHQF\6KRS
44. Do not guarantee that a specific level of energy or cost savings will
result from the implementation of energy conservation measures or the
use of products funded under this program.
Page 2 of 2
CEE FACET, Program Rules # 130326
For more information, contact CEE at
Phone: (612) 244-2427 Fax: (612) 335-5888.
Mail To: Center for Energy and Environment
212 3rd Avenue North, Suite 560
Minneapolis, MN 55401
Page 8 of 8 Customer Report 02/25/2019 03:34 PM Program ID#-00002743
Date 4/2/2018
Estimate #1692
Name / Address
City of Scandia
14727 209St N
Scandia MN 55073
Project:
D&G Electric, Inc.
6491 381st St
North Branch, MN 55056
Signature:
Phone #651-674-6145
Fax #320-358-0146
E-mail dave@dandgelec.com
Total:
DescriptionQty
Provide and Install:
Hallway & Office retrofit 16 3 lamp fixtures
Garage A Remove 24 8 ft strip lights and install 20 LED High bay lights
Storage Area retrofit 2 4 ft strips, retrofit 1 8 ft strip and retrofit 2 2 X 4 troffers
Meeting Rm retrofit 10 2 X 4 troffers install 6 10 watt LED lamps Add 2 ARIADNI 3 way dimmers
Gym retrofit 7 2 X 4 troffers remove 9 4 ft strip lights install 9 LED flat panel lights
Mech Rm retrofit 5 4 ft strip lights
Garage B Remove 24 8 ft strip lights install 22 LED high bay lights
Office Retrofit 4 2X4 troffers
Mezanine Retrofit 2 strip lights
Bathroom Retrofit 2 4 ft strip lights
Outside Wall pack Remove 19 wallpack lights Install 19 new wallpack lights
__________________________________...
1. Price as stated is good for 30 Days.
2. A signed proposel is required to save start dates and start work. All invoices are
due upon receipt regardless of client / third party payment agreements.
$33,600.00