Loading...
8.d) 2015-3-17 Engineering Updatesm x h �17 �' � h I n- �') SCANDIA m i n n e s o t a City of Scandia Engineering Updates 3/17/2015 Engineering • 2015 Seal Coat and Cracking Filling Project Bid Opening is scheduled for April 16, 2015. Possible award will be at the April 21, 2015 City Council Meeting. Forest Lake, Franconia Township, and Marine on St Croix will have the same bid opening date. See location map below. • Since the City Council authorized plans and specifications for the Quinnell Avenue Street Project and bid alternate for Lilleskogen parking lot on March 4th, infrastructure evaluation of existing culvert crossings on Quinnell, Gopher State One Call (GSOC) design locate ticket request of private utility maps, and survey control & preliminary survey work has either been completed or will be by the March 17th City Council meeting. • Washington County has completed preliminary construction plans for the intersection improvements at TH 97 & CR 91 (Lofton Avenue) as part of a Cooperative Agreement with MnDOT. Washington County is also in the process of preparing letters to be delivered to the adjacent property owners that will explain the improvements and provide a project schedule. • Calcium Chloride quotes will be obtained in April to cover the same areas that were completed in 2014. • Spring Load Restrictions became effective as of 12:01 am, Wednesday March 11th. Governor Mark Dayton did issue an executive order giving relief from spring load restrictions to persons transporting sewage from septic systems. 2015 Seal Coat and Cracking Filling Project Location Map 24kh ST_ N.. 240th ST. N. SEALCOAT