Loading...
9.a) Staff Report-Lofton Ave TH 97 Update� J SCAlVDIA Staff Repovt Date of Meeting: March 17, 2015 To: City Council From: Kristina Handt, Administrator Re: Lofton/TH97 Project Update Background: Wayne Sandberg, County Engineer, previously met with the Council to discuss the addition of turn lanes on TH 97 at this intersection. The project is partially funded by MN DOT. Issue: Does the City Council have any issues with the plans? Proposal: Cory Slagle will be at the meeting to provide the Council with an update on the Lofton Ave/TH 97 improvement project. Assuming the Council has no problem with the plans, the County has asked the City Engineer to sign off. Options: 1) Authorize City Engineer to Sign Construction Plans on behalf of City 2) Direct Engineer to Request Changes and then Sign Construction Plans on behalf of City