7.b2 Updated Landscape Plan - US Solar CUP990995987988990992 988 993997988986POHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXUMVUMVUMVUMVUMVUMVUMVUMVUMVUMVUMVUMVUMVUMVPROPOSEDACCESS ROADEQUIPMENT PADPROPOSEDACCESS GATECARDINAL DOGWOOD@ 20' O.C.PROPOSEDSECURITY FENCEPROPERTY LINEPROPERTY LINEPROPOSEDSECURITY FENCEPROPOSED ARRAYPROPOSED ARRAYBLACK HILLS SPRUCE@ 30' O.C.BLACK HILLS SPRUCE@ 20' O.C.BLACK HILLS SPRUCE@ 20' O.C.NANNYBERRY VIBURNUM@ 20' O.C.RED ELDERBERRY@ 20' O.C.RED ELDERBERRY@ 20' O.C.NANNYBERRY VIBURNUM@ 20' O.C.CARDINAL DOGWOOD@ 20' O.C.N:\0010810.33\dwg\Permits\0010810.33PL.dwg 5/14/2019 3:00 PM Sarah Rumppe
NOT FOR CONSTRUCTIONREVISIONS:#DATECOMMENTPREPARED FOR:DATE:SHEET:04/17/2019Phone (608) 821-66001800 Deming Way, Suite 102Middleton, WI 53562westwoodps.comWestwood Professional Services, Inc.USS SolarSources LLCWashington County, MinnesotaTBD (Keystone Ave. N.)Scandia, MN 55073100 N 6th St. #218cMinneapolis, MN 55403A01/31/19CONDITIONAL USE PERMIT SITE PLANSA123456789BCDEFGB02/07/19CONDITIONAL USE PERMIT - REVISIONSC04/17/19CUP - SKETCH ELEVATIONS1.CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TO VERIFYLOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS ORLANDSCAPE MATERIAL.2.ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS.3.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEENCOMPLETED IN THE IMMEDIATE AREA.4.ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO SUBMISSION OFANY BID AND/OR QUOTE BY THE LANDSCAPE CONTRACTOR.5.CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THE GUARANTEEBEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTEN ACCEPTANCE OFTHE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A ONE YEAR GUARANTEECOMMENCING UPON PLANTING.6.ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADESHALL ADHERE TO, BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS:ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC.ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES.ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES.ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING.CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTH RATIOOF NO LESS THAN 5:3.7.PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOSTCURRENT VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED.8. PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES.9.PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN MATERIALS IFNECESSARY; TEMPORARY ONLY.10.PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS LOCATED AT THE TOPOF THE BALLED & BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVED DOWN TO THEROOT COLLAR/ROOT FLAIR. WHEN THE BALLED & BURLAP TREE IS PLANTED, THE ROOTCOLLAR/ROOT FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE.11.OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND BREAKAPART PEAT POTS.12.PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT POORBRANCHING OF EXISTING AND PROPOSED TREES.13.WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST.14.STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE YEAR.15.THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS PRIOR TOPLANTING. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR THE NEED OFANY SOIL AMENDMENTS.16.BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (SELECTTOPSOIL BORROW) AND TO BE EXISTING TOP SOIL FROM SITE FREE OF ROOTS, ROCKS LARGERTHAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED OTHERWISE. MINIMUM 4"DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTH TOPSOIL FOR TREE, SHRUBS, ANDPERENNIALS.17.MULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE AND SHRUBPLANTING BEDS SHALL HAVE 4" DEPTH OF SHREDDED HARDWOOD MULCH. SHREDDEDHARDWOOD MULCH TO BE USED AROUND ALL PLANTS WITHIN TURF AREAS. PERENNIAL ANDORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH SHREDDED HARDWOOD MULCH. MULCH TO BEFREE OF DELETERIOUS MATERIAL AND COLORED RED, OR APPROVED EQUAL. ROCK MULCH TO BEBUFF LIMESTONE, 1 1/2" TO 3" DIAMETER, AT MINIMUM 3" DEPTH, OR APPROVED EQUAL. ROCKMULCH TO BE ON COMMERCIAL GRADE FILTER FABRIC, BY TYPAR, OR APPROVED EQUAL WITH NOEXPOSURE. MULCH AND FABRIC TO BE APPROVED BY OWNER PRIOR TO INSTALLATION. MULCH TOMATCH EXISTING CONDITIONS (WHERE APPLICABLE).18.ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. SOD TO BESTANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF LAWN WEEDS. ALLTOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE DRAINAGE. SLOPES OF 3:1 ORGREATER SHALL BE STAKED. SEED AS SPECIFIED AND PER MN/DOT SPECIFICATIONS. IF NOTINDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL PLAN.19.CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE PLANT ISFULLY ESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDE WATERFOR CONTRACTOR.20.REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD AREASADJACENT TO THE SITE DISTURBED DURING CONSTRUCTION.21.REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER.PLANTING NOTESNOTE: QUANTITIES ON PLAN SUPERSEDE LIST QUANTITIES IN THE EVENT OF A DISCREPANCY.#5 CONT.Cardinal Dogwood / Cornus sericea 'Cardinal'20'-0" O.C. TYP.288'-10' BUFFER PLANTING SCHEDULECOMMON/BOTANICAL NAMESIZESPACING O.C.QTY.KEYMATURE HEIGHT6' HT BBBlack Hills Spruce / Picea glauca densataSEE PLAN10230'-40'Cardinal Dogwood (Winter)Black Hills SpruceBUFFER PLANTING MATERIALSLAST REVISED:10/19/18DECIDUOUS TREEPLANTINGLA28N.T.S.SET ROOT BALL ON UNDISTURBED SUBSOILOR COMPACTED SOIL MOUND MATCHINGTREES NATURAL GROUNDLINE WITH FINISHEDSITE GRADE.REFER TO AMERICAN STANDARD FORNURSERY STOCK FOR MINIMUM BALL SIZE.ROOT FLARE TO BE PLANTED AT OR NEARFINISHED GROUNDLINE.SCARIFY SIDES AND BOTTOM OF HOLE.BACKFILL PLANT PIT WITH SPECIFIED BACKFILLSOIL.FORM 3" DEEP WATERING BASIN.PLACE MULCH, DEPTH AS SPECIFIED, OVERPLANT PITS - DO NOT PILE AGAINST TRUNK.TREE WRAP MATERIAL FROM GROUNDLINEUPWARD TO FIRST BRANCHES, AS REQUIRED.PRUNE OUT MISDIRECTED BRANCHES.PROVIDE ONE CENTRAL LEADER.GUYING AND STAKING, AS REQUIRED, FORONE (1) YEAR ON ALL DECIDUOUS ANDCONIFEROUS TREES:TOP STAKES 5' ABOVE GROUND (MAX.)OR TO FIRST BRANCH. BOTTOM OFSTAKE 3' (MIN.) BELOW GROUND.STAKING POSTS TO BE 2"X2" STAINEDWOOD OR PAINTED STEEL DELINEATORPOSTS. PLACE 3 POSTS EQUIDISTANTAROUND AND OUTSIDE ROOT BALL.SECURE TREE TO POSTS WITH 16" LONGPOLYPROPYLENE OR POLYETHYLENE, 40MIL., 1.5" WIDE STRAP.2XBALLDIAMETERLAST REVISED:10/23/18SHRUB & PERENNIALCONTAINER PLANTINGLA27-CN.T.S.2XCONT.DIAMETERSET CONTAINER ROOT SOIL ONUNDISTURBED SUBSOIL OR MILDCOMPACTED SOIL FOR DEPTH TO MATCHFINISH GRADESCARIFY SIDES AND BOTTOM OF HOLE.DEPTH PER CONTAINER SOIL DEPTHBACKFILL PLANT PIT WITH SPECIFIEDPLANTING SOIL OR AS APPROVEDEDGING AT PLANTING BEDS, AS SPECIFIED,ADJACENT TO LAWN AREASMULCH AS SPECIFIED (AND FILTER FABRIC,AS INDICATED)REMOVE CONTAINER, SCARIFY SIDES, ANDSET SOIL MASS ON COMPACTED SOIL BASEMOUND, MATCHING SHRUBS NATURALGROUNDLINE WITH FINISHED GRADEPLANTING DETAILSC.500Landscaping Plan0'240'160'80'Nannyberry Viburnum (Spring)Red Elderberry (Summer)#5 CONT.Red Elderberry / Sambucus racemosa20'-0" O.C. TYP.3110'-12'#5 CONT.Nannyberry Viburnum / Viburnum lentago20'-0" O.C. TYP.328'-10'