Loading...
8.g City Administrator report1 Neil Soltis From:Greene, Wendy L <WLGreene@bherenewables.com> Sent:Thursday, April 25, 2019 6:00 PM To:Jay Riggs; Jim Shaver; Neil Soltis; Byron Karns; Ben Meyer; Carl Almer; Sorensen, Jenifer (DNR); Richter, Joe G (DNR); thomas.j.hingsberger@usace.army.mil; Nistler, Nicholas (MPCA) Cc:Poteet, Neal; John P. Hanson Subject:RE: Update for Argo Navis Community Solar Garden - Scandia, MN Attachments:BHE_REV 0 for Bids_Mar 12 2019.pdf Categories:issues for council Hello All, In response to Jay’s request for an update, please see an estimated schedule of upcoming work to be implemented in the area east of the original EOF location at the Argo Navis Community Solar Garden. All work to be implemented will be proposed in accordance with discussions already held between BHER and the TEP members, as well as through continued communication and coordination. Timing Task Notes May 6 - May 10, 2019 Site Investigation Dan Tix (Barr Senior Wetland Ecologist) - Timing dependent on area vegetation and conditions May 10 – June 10, 2019 Preliminary Slope Stabilization and Wetland Remediation Plans Submitted to TEP for Review Draft plans will be routed to the TEP as soon as they have undergone internal review by BHER June 2019 TEP/BHER Coordination Meeting As necessary during initial draft review July 2019 Final Slope Stabilization and Wetland Remediation Submitted to TEP Pending coordination with TEP and internal review by BHER July/August 2019 Construction commences Dependent on specific plan requirements Other Argo Navis Updates  Initial construction for improvements to the on-site stormwater system commenced in March 2019 in anticipation of possible flood conditions throughout the state. This was short-term and prior to full contract execution. Work will continue on both Phases I and II of the project (see attached drawings) re-commencing Monday, April 29, 2019 and is expected to be completed in early July, 2019.  Matt Berg with Endangered Resource Services has been retained to conduct the mussel survey as requested by DNR. He will conduct the survey when conditions allow and I will keep the TEP notified as to progress on this.  BHER continues to work with CMSCWD on approval of the stormwater system design, Maintenance Agreement, and Construction Agreement. 2019 Category B City: SCANDIA Currently a Step 2 GreenStep City as of June 2018 - joined May 2014 - Which assessment? Preliminary: for city review Final: recommendation to LMC Assessor and date: Philipp Muessig, 4/30/19 Total BPs done: All required* BPs done? BP distribution requirements* met? Recommend new June 2019 recognition at: Step 3 * required for Step 3 recognition Best practices (required in bold) BP implemented? Action summary by # and star level achieved Action rules (req. actions in bold) BUILDINGS: distribution requirement is 2 BPs; are 2 done? 1. Public Actions 1 & 2 YES 1.1 COMPLETE @ 2 STARS – current to fall 2017 1.2 COMPLETE @ 1 STAR -- occupancy sensors in restrooms - Community Building and Ice Rink warming house 1.3 COMPLETE @ 1 STAR -- retrofit of interior & exterior fixtures at Community Building to LEDs; exterior Dark Sky spec; $33,285 cost, Xcel rebate of $5,069, annual cost savings est. at $3,240 (at most an 8.7 year payback) 2. Private any one action 3. New any one action 4. Lighting/Signals 2 actions; one from 5-8 YES 4.1 COMPLETE @ 3 STARS -- all zoning districts require full cut-offs 4.5 COMPLETE @ 1 STAR -- solar light shining downward installed atop flag pole for veterans memorial Lilleskogen Park 5. Reuse any one action LAND USE: 2 BPs required; are 2 done? 6. Comp Plan Actions 1 & 2 YES 6.1 COMPLETE @ 1 STAR -- natural resource goals protecting open spaces to retain the rural character of Scandia; also Guidelines for the Protection of Scandia's Scenic Viewsheds 6.2 COMPLETE @ 1 STAR 6.3 COMPLETE @ 2 STARS 7. Density any one action 8. Mixed Uses any one action 9. Highway Development any one action 10. Conservation Development any one action YES 10.1 COMPLETE @ 2 STARS -- Open Space Conservation Subdivisions require 55%+ protected land 10.3 COMPLETE @ 2 STARS -- Woodland Preservation Plan is required whenever significant trees or woodlands exist in a proposed construction zone TRANSPORTATION: 1 BP required; is 1 done?  14 YES YES YES YES  YES 11. Complete Green Streets 1; & one additional action 12. Mobility Options any one action YES 12.1 COMPLETE @ 1 STAR -- Friends of Scandia Parks and Trails did map showing 4 cycling routes within the City 13. Fleets any one action 14. TOD / TDM any two actions ENVIRONMENTAL MGT: 3 BPs required; are 3 done? 15. Purchasing 1; and one additional action YES 15.1 COMPLETE @ 2 STARS – 2018 council resolution amending purchasing policy to add an objective to purchase sustainable whenever practicable 15.7 COMPLETE @ 1 STAR -- tablets used by Council, Planning Commission, other Committees: meeting packets posted to a Dropbox 16. Trees any one action YES 16.5 COMPLETE @ 2 STARS – required tree preservation plan for plats and minor subdivisions, replacement standards (up to 2-for-1) for significant trees 17. Stormwater any one action YES 17.5 COMPLETE @ 2 STARS -- City's Development Code stresses reducing the need for stormwater controls/BMPs by minimizing impervious surfaces, incorporating the use of natural topography, installing green roofs, cisterns 18. Parks & Trails any two actions YES 18.5 COMPLETE @ 2 STARS – 2016 resolution: best efforts to utilize plants favorable to pollinators, use native MN species, cease the use of pesticides that would impact pollinators 18.8 COMPLETE @ 3 STARS – 2017 thorough volunteer policy for maintenance in City parks, species mapping, removal of invasives, etc 19. Surface Water if state public water: 4; and one additional action others: any one action NO 19.4 COMPLETE @ 2 STARS – 2007 shoreland overlay district; added shoreland management regulations to the development code 20. Water / Wastewater 1 & 2; and one additional 21. Septics any one action 22. Solid Waste one from 1-3; & one from 4-8 NO 22.6 COMPLETE @ 1 STAR -- City contracts with SRC for single sort curbside recycling collection for all households 23. Local Air Quality any one action ECON & COMM DEVELOP: 3 BPs required; are 3 done? 24. Benchmarks & Involvement 1; and one additional action YES 24.1 COMPLETE @ 2 STARS -- Friends of Scandia Parks and Trails assists City with the GreenStep implementation/reports; reports to Council 24.4 COMPLETE @ 2 STARS -- ongoing free speaker events (some in partnership with the Marine Community Library) on recycling, wasps, building resiliency to climate change, silkworm moths, changes in Minnesota birds, climate change and trees 25. Green Businesses any two actions YES 25.1 COMPLETE @ 1 STAR -- Economic Development resources on web include RETAP 25.7 COMPLETE @ 2 STARS -- City maintains a listing of local businesses topically organized and links, on its website 26. Renewable Energy any two actions YES 26.1 COMPLETE @ 2 STARS –2016 Solar farm & community solar garden ordinance; 4 solar farms have been approved YES YES 26.5 COMPLETE @ 1 STAR -- 40 kW solar system on the roof of the Fire / Public Works Building; performance displayed live on public web site 26.6 COMPLETE @ X STAR -- Community Solar Garden purchases (up to 120% of city electricity needs) expected to produce 127,771 kWh annually; savings of $0.01 per kWh produced 26.7 COMPLETE @ 1 STAR -- solar energy systems (except for roof- & building-mounted) are permitted accessory uses in all zoning districts: only building permit review process (not CUP) for systems smaller than 800 s.f. in area 27. Local Food any one action YES 27.3 COMPLETE @ 3 STARS – City & Gammelgården Museum collaborated in 2011 to bring a Farmers Market to Scandia; market is promoted on the City website and in the Spring newsletter 28. Business Synergies 2, 3 or 4 29. Climate Adaptation YES 29.2 COMPLETE @ 2 STARS -- City worked with Washington Co. to update in 2018 the All-Hazard Mitigation Plan; City is creating its own Emergency operations plan; emergency information via ECHO, Code Red in English, Spanish, Hmong, Somali, via landlines, cells, text, outdoor warning sirens, house-to-house contact, including alerting individuals with special needs; fire station is emergency shelter NO From: Muessig, Philipp (MPCA) [mailto:philipp.muessig@state.mn.us] Sent: Tuesday, April 30, 2019 4:53 PM To: n.soltis@ci.scandia.mn.us Subject: Scandia GSC assessment 2019 Step 3 it is Neil – congratulations! Very impressive the work of Friends of Scandia Parks; and the city/county emergency planning is better than larger cities I’ve reviewed. All good for other cities to see. - Philipp Public Notice Carnelian-Marine-St. Croix Watershed District The Washington County Board of Commissioners announces they will be accepting applications for the Carnelian-Marine-St. Croix Watershed District Board of Managers. Applicants must reside in the Watershed District. Cities or townships included in the Carnelian-Marine-St. Croix Watershed are: Hugo, Grant, Marine on St. Croix, Scandia, May Township, and Stillwater Township To receive an application, please call the Washington County Office of Administration at (651) 430-6009, or go on line at: http://www.co.washington.mn.us/index.aspx?nid=300 Applications must be received by July 16, 2019. If you need assistance due to disability or language barrier, please call 430-6000 (TDD 439-3220) An Equal Employment Opportunity / Affirmative Action Employer