Loading...
5.h) Staff Report - 2015 Stump Grinding ProjectStaff Report To: City Council c From: Tim Kieffer, Director of Public Works P57�-. Date: April 21, 2015 SCANDIA Re: 2015 Stump Grinding Project Background: Last Winter staff performed tree trimming and removal along sections of roadway. The stumps from this work should be removed to eliminate hazards. Staff solicited bids from four contractors but only received two bids for this project. B & B Stump Removal was $6,000 and Haaven Stump Removal was $10,000. The contractor is required to spread the woodchips when finished. Proposal: Staff is proposing to award the 2015 Stump Grinding Project to B & B Stump Removal for $6,000. Issue: Should stump grinding occur? Fiscal Impact: The 2015 operating budget has $330,000 for contractual road maintenance. Options: 1) Award the 2015 Stump Grinding Project to B & B Stump Removal for $6,000. 2) Do not award the 2015 Stump Grinding Project. 3) Other options. Recommendation: Option 1