Loading...
8.d) 2015-5-19 Engineering Updates City of Scandia Engineering Updates 5/19/2015 Engineering • MnDOT is planning a route & seal (crack filling) and shoulder fog sealing project that will include several highways, but within the Scandia area it will include TH 95 from Hwy 8 to Hwy 96 (25.4 miles). The preconstruction meeting was held on Wednesday, May 6, 2015. • Quinnell Ave N and Lilleskogen Park Improvements Bid Opening was held at City Hall on May 13 th at 10:00am. Project award and bid results will be covered as a regular agenda item. • Bituminous Patching Quotes were received on May 15 th , project award and results will be covered as a regular agenda item. • Washington County/MnDOT Cooperative Agreement project for Lofton Ave & Hwy 97 Intersection Improvement has a bid opening scheduled for July 7, 2015, followed by the project award, contact execution, preconstruction meeting, and anticipated construction starting the first week of August. Construction is scheduled to be completed approximately in 4 weeks. • 2015 MnDOT planned improvements on Hwy 97 Micro surfacing – Hwy 61 to TH 95 Sign removal/replacement – I-35 to TH 95 Re-striping – Hwy 61 to TH 95 Centerline mumble strips – Hwy 61 to TH 95 • Christine Maefsky has requested the raw survey data that was completed for the 205 th Street N and also the Soil Boring Reports. Both these items were submitted the week of May 11, 2015.