5. 2020-2024 Capital Improvment Plan as recommended by CIP committee after 08 09 meeting City of Scandia Capital Improvement Program 2020 – 2024 Recommendations from Capital Improvement Committee August 7, 2019 Committee Members: Terry Gorham, Adam Hawkinson, Public Works Director Perry Rynders Mike Hinz, Fire Chief Dominic Mitchell Mark Lofstrom Steve Kronmiller, City Council CONTENTS Introduction What is a CIP? .................................................................................................................. 1 Scope of the Draft CIP ..................................................................................................... 1 Funding Sources .............................................................................................................. 2 Project Priorities .............................................................................................................. 3 2020-2024 CIP Overview……………………………………………………………………………………4 2020-2024 CIP by Fund Capital Improvement Fund ............................................................................................. 5 Equipment Replacement Fund ........................................................................................ 6 Park Improvement Fund ................................................................................................. 7 Local Road Improvement Fund…………………………………………………………………………………..8-9 201 Sewer Fund………………………………………………………………………………………………………….10-11 Uptown Sewer Fund…………………………………………………………………………………………………..12 CIP Summary Data Project Listing by Department (All Years) ....................................................................... 6 Projects by Year, 2020 thru 2024 .................................................................................... 8 Sources and Departments Summary, 2020 thru 2024.................................................... 10 Projects by Year, 2021 thru 2025 .................................................................................... 11 Sources and Departments Summary, 2021 thru 2025.................................................... 12 Projects by Department, 2020 thru 2025 ....................................................................... 13 Projects by Source, 2020 thru 2025 ................................................................................ 15 Equipment Replacement Fund, Replacements by Department ..................................... 18 Equipment Replacement Fund Cash Flow, 2020-2025 ................................................... 19 Appendix Project Details, All Projects ............................................................................................. 20 INTRODUCTION The Capital Improvement Program (CIP) for the five-year period of 2020 through 2024 is the ninth such document prepared by the City of Scandia. It would amend the CIP included in the Comprehensive Plan replacing Appendix F of the plan in its entirety. What is a CIP? A capital improvement plan (CIP) is a multi-year plan identifying capital projects to be funded during the planning period. The CIP identifies each proposed capital project to be undertaken, the year the assets will be acquired or the project started, the amount of funds expected to be expended in each year of the CIP and the means of funding the expenditures. A CIP is not a static doc ument. It should be reviewed at an appropriate cycle to reflect changing priorities, unexpected events and opportunities. The CIP should include the maintenance, repair and rehabilitation of existing infrastructure as well as the construction of new infrastructure. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each project and the associated funding before any project may proceed. The basic function of a CIP is to provide a formal mechanism for decision making, a link to long range plans, a financial management tool and a reporting document. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish- list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP b e kept up to date and in synch with city budgets. Once the CIP has been completed, it will be reviewed by the Planning Commission for consistency with the Comprehensive Plan Scope of the CIP Scandia’s CIP includes all capital projects that cost at least $10,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these param eters would be reviewed as part of the annual operating budget, but would not be included in the CIP. 2 Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Capital Improvement Fund The City has been levying $30,000 per year in property tax to fund these general capital projects. Equipment Replacement Fund Most major equipment purchases are funded through the issuance off debt which is then repaid with property taxes. Other sources of funding include the sale of unused assets and transfers from General Fund operating budgets. General Fund Annual operating budget, primarily funded by property tax revenues. Park Improvement Fund The primary sources of funds are from park dedication fees paid by developers as a part of any subdivision, revenues generated by the park facilities, such as advertising revenues, and grant revenues. Local Road Improvement Fund This fund was established in 2014 to segregate funds for major road improvement projects. The property taxes levy is the primary source of funds with a base levy in 2016 of $581,000. Pursuant to the City’s fund balance policy any general fund balance in excess of 50% of budgeted expenditures can be transferred to this fund. The 2017 transfer to this fund totaled $523,200. Additionally any special assessments on the 2007 road improvement projects received after the associated debt was retired are transferred to this fund. 201 Sewer Funds come from fees paid by users on the 201 Wastewater System which serves the Anderson Erickson and Bliss subdivisions. Uptown Sewer Funds come from fees paid by users on the Uptown Wastewater System In addition to these sources, it is possible that future projects could be funded from donations, grants, user fees or other sources not listed. Projects benefiting the utility funds, which are intended to operate as stand-alone businesses supported by user fees, would be paid from the appropriate fund. 3 Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following priority rating system was identified in 2008 and have been used in subsequent updates. 1 Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important, high-priority projects that should be done as funding becomes available. 3 Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4 Less important, low-priority projects; desirable but not essential. N/A Used for replacements of existing equipment. In reviewing the 2020 – 2024 plan, the Committee identified a scored evaluation criteria to be used if evaluating projects if sufficient funding is not available:  Does the project help meet the goals of the Comprehensive Plan or City Priorities?  Does the project eliminate or prevent an existing health, environmental, or safety hazard?  Does the project protect and preserve the City’s infrastructure?  Does the project will have a positive, neutral, or negative impact on the City’s operational Finances?  Does the project leverage outside funding?  Does the project tie into other projects?  Can the project be completed in partnership with another organization?  Is the project mandated to comply with environmental standards?  Does the project support the City’s Green Cities efforts?  Project directly the allows the City to meet environmental compliance standards or meet sustainability goals, where applicable?  Does the project help stimulate development or redevelopment of properties and/or encourage economic development in the City corridors?  Does the project improve and/or increase the level of service provided by the City? 4 2020-2024 CIP OVERVIEW For 2020 through 2024, the draft CIP includes projects with a total estimated cost of $6,967,900. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. Project costs will need to be updated annually, especially for projects in the first year or two of the plan. The decision whether or not to replace a particular piece of equipment and what to replace it with will need to be made by the City Council at the time of the purchase. The City could decide to keep some equipment longer than planned or equipment could wear out more quickly than expected. It is likely that some items will not be replaced, or that new technology or equipment could alter plans to replace a particular item. The breakdown of recommended projects is shown by fund below: The revenue sources for the projects shown below do not include the use of accumulated fund balances: The table below summarized the revenue and expenditures and shows the impact on the cumulative fund balance in the four capital project funds. The impact in each individual fund is shown later in this report. Note that the cumulative fund balance in the capital project funds is projected to decrease from $2,935,756 at 12/31/2019 to $1,085,250 in 2024 of which $640,569 will be in the Local Road Improvement Fund leaving $444,681 available for General Capital, Park Improvements, and Equipment Replacement. A primary consideration in the review of the projects is the impact on the property tax levy. A breakdown of the property tax levy needed to finance the recommended program and to service the debt issued to fund capital projects in prior years is shown below: Fund 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Capital Improvement 270,000$ 1,380,000$ 130,000$ -$ 223,000$ Park Improvement 73,800$ 150,400$ 55,900$ 78,840$ 64,960$ Equipment Replacement 256,000$ 136,500$ 273,500$ 250,000$ 30,000$ Local Road Improvement 637,000$ 895,000$ 643,000$ 715,000$ 705,000$ Total 1,236,800$ 2,561,900$ 1,102,400$ 1,043,840$ 1,022,960$ CAPITAL PROJECT EXPENDITURES BY FUND Revenue Source 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Property Taxes 496,516$ 553,039$ 604,469$ 661,464$ 713,366$ Issuance of debt -$ 600,000$ 200,000$ 250,000$ -$ Park Dedication Fees 6,000$ 6,000$ 6,000$ 6,000$ 6,000$ Grants & Donations 32,180$ 504,680$ 24,680$ 37,500$ -$ Other 16,100$ 293,100$ 56,100$ 30,100$ 14,100$ Total 550,796$ 1,956,819$ 891,249$ 985,064$ 733,466$ CAPITAL PROJECT REVENUES BY SOURCE 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Revenue 550,796$ 1,956,819$ 891,249$ 985,064$ 733,466$ Expenditures 1,236,800$ 2,561,900$ 1,102,400$ 1,043,840$ 1,022,960$ Fund Balance 2,249,752$ 1,644,671$ 1,433,520$ 1,374,743$ 1,085,250$ CAPITAL PROJECTS TOTAL Fund 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Debt Service Fund 498,730$ 449,028$ 527,531$ 513,054$ 479,748$ Capital Improvement Fund -$ -$ -$ -$ -$ Park Capital Improvement 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ Equipment Replacement 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ Local Road Improvement 436,516$ 493,039$ 544,469$ 601,464$ 653,366$ Total levy for capital projects 995,246$ 1,002,067$ 1,131,999$ 1,174,518$ 1,193,115$ Levy / $100,000 of 2019 taxable value 151.72$ 152.76$ 172.57$ 179.05$ 181.89$ 5 The 2019 levy for the capital project purposes of $910,280 or $138.77 / $100,000 of valuation. CAPITAL IMPROVEMENT FUND The Capital Improvement Fund is utilized to fund projects that are not equipment related, do not have a dedicated funding source, or rely on donations or grants to be funded. The projects recommended from 2020 – 2024 are as follows: The projected balance in the fund as of December 31, 2019 is $1,076,904. The balance is largely attributable to the transfers from the General Fund of excess balances pursuant to the City’s fund balance policy. Similar transfers of this magnitude are not anticipated in the future. It is proposed that the design work for the Community Center Improvements be funded through the available balance and the 2021 construction work be funded through the issuance of debt. The implementation of the bliss addition stormwater construction in 2021 is based on obtaining grants for 87.5% of the project cost ($435,000). The second fire station is proposed to be located on property given to the City by the School District for use as park property. That restriction will need to be released for the project to proceed. The Committee is proposing that the second fire station be funded through the sale of the annex building (former fire station) on Oakhill Road. The Committee is recommending that $100,000 be transferred from this fund to the equipment replacement fund in 2021 to meet a shortfall in that fund. Based on the proposed projects the available fund balance is projected to decrease to $303,404 by December 31, 2024. 2020 2021 2022 2023 2024 General Bliss Addition Stormwater construction 500,000$ Cold storage building 150,000$ Information Technology Broadband Implementation Community Building HVAC & furnace replacement 30,000$ Community Center 100,000$ 600,000$ Fire Emergency Generator 70,000$ HVAC replacement 25,000$ Parking lot 75,000$ Second fire station 180,000$ Roof replacement 100,000$ Weather siren - additional 25,000$ Exhaust removal system 48,000$ 270,000$ 1,280,000$ 130,000$ -$ 223,000$ 6 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Fund Balance $809,404 $649,904 $522,904 $525,904 $305,904 Revenue $3,000 $1,220,500 $3,000 $3,000 $3,000 Expenditures $270,000 $1,380,000 $130,000 $-$223,000 $- $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 CAPITAL IMPROVEMENT FUND 7 EQUIPMENT REPLACEMENT FUND The City created the Equipment Replacement Fund in 2007 to set aside funds on an annual basis for planned replacement of vehicles and major pieces of operating equipment. Any revenues from the sale of old equipment being replaced are also deposited into the fund. Beginning in 2015, the revenue to the fund was reduced to reflect a new City policy of borrowing for equipment costing over $100,000 with the balance able to meet the projected smaller equipment needs for 10 years. Beginning in 2017 $30,000 of property tax, which was previously levied for the Capital improvement Fund, be allocated to the Equipment Replacement Fund. The projects recommended from 2020 – 2024 are as follows: The projected balance in the fund at 12/31/2019 is $244,977. In order to fund the equipment purchases a transfer from the General Capital Fund of $100,000 in 2021 is recommended. Additionally the proceeds from the sale of equipment totaling $101,000 over the five years are also needed to fund the equipment replacement. It is anticipated that equipment certificates will be issued in order to fund the purchase of the plow truck in 2022 and the fire truck in 2023. As recommended, the available fund balance at December 31, 2024 is projected to be $102,977. 2020 2021 2022 2023 2024 Public Works Add loader to fleet 95,000$ Replace 1999 John Deere 6410 Tractor 98,000$ Replace 2010 Tiger ditch rear mower 16,000$ Replace 2011 Tiger ditch boom mower 17,000$ Replace 2011 Ford F250 + plow 35,500$ F-250 plow assembly 8,000$ Replace 2011 Mack dump truck & plow 208,500$ Replace 2017 Kubota 3990 mower w broom & blower 30,000$ Fire Zoll monitor / defib 30,000$ Pagers 18,000$ Radio replacement 75,000$ Lund boat 25,000$ 1995 Ford - Grass Rig #5175 - kept in service in 2018 40,000$ Replace 2003 Peterbuilt Tanker - #5178 250,000$ 256,000$ 136,500$ 273,500$ 250,000$ 30,000$ 8 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Fund Balance $29,977 $31,477 $38,977 $93,977 $102,977 Revenue $41,000 $138,000 $281,000 $305,000 $39,000 Expenditures $256,000 $136,500 $273,500 $250,000 $30,000 $- $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 EQUIPMENT REPLACEMENT FUND 9 PARK IMPROVEMENT FUND The Parks Improvement Fund is set up to use park dedication fees as the primary funding source. In 2019 a vacant parcel of City property was sold and the proceeds allocated to the Park Improvement Fund. At 12/31/2018 the Fund had a balance of $12,000 due to the Capital improvement Fund from an advance for the parking lot construction at Lilleskogen Park. The projects recommended from 2020 – 2024 are as follows: In 2019 the City obtained a grant for habitat restoration at Lilleskogen Park. The grant is reimbursable based on expenditures. The 2019 budget provided for $10,000 that will serve as the local matching share of this project which is anticipated to be completed in 2022 with both the revenues and expenditures spread over the 4 year period. The projections assume an increase in the property tax levy of $30,000 be added to fund. The revenue assumptions presume that additional funding through grants and donations totaling $132,500 will be obtained. The ability to implement the listed projects is conditional on obtaining this funding. Projects recommended based on obtaining 50% outside funding are the purchase of a new Zamboni, replacement of the playground at the Community Center, replacement of the playground at the Wayne Erickson ballfield, and the construction of a picnic shelter at Lilleskogen Park. 2020 2021 2022 2023 2024 Lilleskogen Picnic shelter -$ -$ 30,000$ -$ -$ Woodland plantings and fencing 5,000$ -$ -$ -$ -$ culvert drainage ditch E. side -$ -$ 10,000$ -$ -$ Lilleskogen - wetland restoration 9,680$ 9,680$ 9,680$ -$ -$ Other improvements 2,500$ 2,500$ 2,500$ -$ -$ 17,180$ 12,180$ 52,180$ -$ -$ Wayne Erickson Bleacher / Concession improvements -$ -$ -$ 15,000$ -$ Playground replacement -$ -$ 75,000$ -$ -$ Ballfield fence -$ -$ -$ -$ 26,000$ -$ -$ 75,000$ 15,000$ 26,000$ Wojtowicz Ice Rink Zamboni 45,000$ 45,000$ -$ -$ -$ -$ Undesignated Community Ctr playground -$ 115,000$ -$ -$ -$ Clearing and trails at nature parks (Bone Lake, Big Marine School site, Orwell Court) 10,000$ Settlers monument improvements 5,000$ Wind in the Pines sign 3,000$ -$ -$ -$ -$ Lions Park shelter - sign & stain 5,000$ 4,500$ -$ -$ -$ Amphitheatre -$ -$ -$ -$ 35,000$ 8,000$ 134,500$ -$ -$ 35,000$ 10 Based on the increased levy funding and the grants and donation the projected fund balance at 12/31/2024 will be a $35,799. 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Fund Balance $106,140 $60,520 $66,900 $63,160 $35,800 Revenue $69,780 $104,780 $62,280 $75,100 $37,600 Expenditures $73,800 $150,400 $55,900 $78,840 $64,960 $- $20,000 $40,000 $60,000 $80,000 $100,000 $120,000 $140,000 $160,000 PARK CAPITAL FUND 11 LOCAL ROAD IMPROVEMENT FUND In 2008 the City adopted a Pavement Management Plan to extend the life of city streets and to reduce the lifecycle costs for maintaining them in good condition. The City has endeavored to increase the budget for contractual road maintenance and repairs. In 2014 the Local Road Improvement Fund was established to address major repairs (reconstruction, mill and overlays, etc.) and is funded by the general tax levy. Regardless of these efforts the PASER rating of City streets by the City engineer indicated that over 18% of the City streets were rated very poor or poor and 37% rated fair. The 2018 – 2022 Capital Improvement Plan recommended that the City issue debt to fund a program to address all roads that were in very poor or poor condition. Due to a favorable bid the City was able to address over 15.96 miles of roads. In order to conserve the available resources the asphalt on the roads that were in the 2018 program was reclaimed in place and the base amended as necessary before paving. The cost for this work averaged $57.49 per linear foot of road. The cost for similar work in 2020 – 2024 is estimated by the engineer to cost between $74 and $105 per lineal foot of road. The roads that were previously rated fair or good will continue to deteriorate. The Committee has recommended that for the years 2020 – 2024 an additional $55,000 be levied each year in order to fund road improvements. The impact of the levy is shown on the chart below. Based on an estimated 12/31/2019 fund balance of $1,504,215 and with the increased levy amount and the proposed construction the balance at 12/31/2024 is projected to be $640,569. Description 2020 2021 2022 2023 2024 Base 610,050$ 665,050$ 720,050$ 775,050$ 830,050$ Increase in base 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ Sealcoat funds from General Fund 115,000$ 115,000$ 115,000$ 115,000$ 115,000$ Debt Service on bonds (343,534)$ (342,011)$ (345,581)$ (343,586)$ (346,684)$ 436,516$ 493,039$ 544,469$ 601,464$ 653,366$ 12 13 201 SEWER SYSTEM Improvements to the 201 Sewer System are intended to be funded through user fees. The projects recommended are shown below. At the end of 2019 the cash balance in the 201 Sewer Fund is projected to be $4,675. The Wastewater Advisory Committee has recommended a 5% rate increase for 2020 and extending that increase out into the future to build an equipment reserve. Based on the planned replacements in 2020 the fund would have a negative cash balance of $16,129 at 12/31/2020. The Committee recommended that an inter-fund loan be utilized in order to off-set any negative cash balance. The Anderson Erickson drainfield improvement would be used to make improvement to the drainfield and to potentially add capacity. There is no immediate need for the A-E drainfield improvements and the amount shown can be a placeholder for future improvements. The MPCA permit for the Bliss addition requires the City to submit by September, 2019 a plan to address the high levels of nitrate at one of the test wells. It is anticipated that there will be a time limit placed on the City in the permit renewal process and the 2022 date is an approximation of when construction is anticipated. Low interest rate debt and grant assistance may be available for the nitrate remediation project but are not included in the 2020-2024 projection. At current interest rates, the annual cost to service the full amount of debt for the nitrate remediation project over a 10-year period would be roughly $72,000 / year, which would require a rate increase of roughly 75%. 2020 2021 2022 2023 2024 Anderson / Erickson Drainfield 200,000$ AE LS 1 Pump 2 12,000$ Bliss Bliss LS 1 Pump 1 6,300$ Bliss LS 1 Pump 2 6,300$ Bliss LS 2 Pump 1 6,000$ Bliss LS 2 Pump 2 6,000$ Bliss LS 3 Pump 1 6,000$ Bliss LS 3 Pump 2 6,000$ Bliss LS 4 Pump 1 6,000$ Bliss LS 4 Pump 2 6,000$ Nitrate treatment 960,000$ -$ 36,000$ 960,000$ 212,000$ 12,600$ 14 2020 Budget 2021 Budget 2022 Budget 2023 Budget 2024 Budget Cash Balance $4,675 $(16,129)$(957,676)$(1,147,528)$(1,134,035) Revenue $95,215 $99,746 $104,303 $109,298 $114,543 Expenditures $135,875 $134,250 $135,550 $136,850 $138,150 $(1,400,000) $(1,200,000) $(1,000,000) $(800,000) $(600,000) $(400,000) $(200,000) $- $200,000 $400,000 201 SEWER FUND 15 UPTOWN SEWER SYSTEM Improvements to the Uptown Sewer System are intended to be funded through user fees. The projects recommended are shown below. The projected cash balance at 12/31/2019 is $5,689. The replacement of the blower and pumps are schedule replacements at the end of the projected useful life. The Wastewater Advisory Committee has recommended a 5% rate increase for 2020 and extending that increase out into the future to build an equipment reserve. Based on the increased revenue and the proposed capital expenditures the cash balance at 12/31/2024 is projected to be a negative $6,399. 2020 2021 2022 2023 2024 Drainfield blower 4,000$ Replace Uptown pump 1 5,800$ Replace Uptown pump 2 5,800$ Replace Drainfield pump 1 5,800$ Replace Drainfield pump 2 5,800$ -$ 4,000$ 11,600$ -$ 11,600$