5. PC Resolution 2020-05 Smith Minor Subdivision 04.07.20
CITY OF SCANDIA, MINNESOTA
PC RESOLUTION NO. 2020-05
APPROVING A MINOR SUBDIVISION OF THE PARCEL LOCATED AT
13781 185TH STREET NORTH
WHEREAS, Marschall Smith has made an application for a Minor Subdivision named
Ravensfield South related to two parcels of land to split a 23.19 acre lot (PID
#34.032.20.31.0001) into 3 parcels: (1) A 3.444 acre lot (Block 1 Lot 1) which has an existing
residential structure; (2) a 0.39 acre vacant lot (Outlot B), which could then be combined with a
neighboring property (Gutmanis); and (3) combine a 2nd parcel (PID #34.032.20.34.0003) of
1.58 acres into the remaining 19.356 acres from the original parcel; and
WHEREAS, the property is legally described on the following page as:
PC Resolution No.: 2020-05
Page 2 of 3
and,
PC Resolution No.: 2020-05
Page 3 of 3
WHEREAS, the Planning Commission reviewed the request for the Minor Subdivision
at a duly noticed Public Hearing on April 7, 2020, and recommended approval of the Minor
Subdivision, with conditions;
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE PLANNING
COMMISSION OF THE CITY OF SCANDIA, WASHINGTON COUNTY,
MINNESOTA, that it recommends that the City Council approve the Smith Minor Subdivision,
to split a 23.19 acre lot (PID #34.032.20.31.0001) into 3 parcels: (1) A 3.444 acre lot (Block 1
Lot 1) which has an existing residential structure; (2) a 0.39 acre vacant lot (Outlot B), which
could then be combined with a neighboring property (Gutmanis); and (3) combine a 2nd parcel
(PID #34.032.20.34.0003) of 1.58 acres into the remaining 19.356 acres from the original
parcel;.
FURTHER, BE IT RESOLVED, that the following conditions of approval shall be met:
1. The minor subdivision shall be in substantial compliance with the Preliminary Plat dated
March 16, 2020.
2. Two existing accessory structures located near the south lot line of proposed Block 1, Lot
1, shall be removed, as indicated on the Preliminary Plat.
3. A secondary septic location for Block 1, Lot 1 shall be identified on the Final Plat
document, to be reviewed by the City and filed with Washington County.
4. The applicants shall record a Final Plat with Washington County within one year of the
date when the minor subdivision is approved.
5. The applicant shall pay all fees and escrows associated with this application.
Adopted by the Scandia Planning Commission this 7th day of April, 2020.
_________________________________
Dan Squyres, Chair
ATTEST:
_________________________________
Ken Cammilleri, Administrator/Clerk