9.b) Council_RJG^Pilar Ditching Bid Results1July 16, 2015 BO LTON 8- M F:= N K , I ISI C® Consulting Engineers & Surveyors 2035 County Road D East • Suite B • Maplewood, MN 55109-5314 Phone (651) 704-9970 • Fax (651) 704-9971 www.bolton-menk.com Honorable Mayor and City Council City of Scandia 14727 2091h Street N. Scandia, MN 55073-8503 Re: Bid Results Pilar Road N Ditching Improvements Project Dear Mayor and Council: Bids for the Pilar Road N Ditching Improvements Project were opened on Thursday, July 16, 2015. Six (6) bids were received and ranged from $20,400.00 to $126,895.00. A Bid Tabulation has been included. Copies will also be distributed to each Bidder after award by the City. The following is a bid summary: Contractor Base Bid Scandia Trucking & Excavating L.C. $20,400.00 Peterson Excavating $27,730.00 RE Peterson, Inc. $28,500.00 Dunaway Construction $93,400.00 Peterson Companies, Inc. $117,163.00 New Look Contracting, Inc. $126,895.00 Based on the summary above and discussions with City Staff, if the City Council wishes to award the Project to the lowest bidder, then Scandia Trucking & Excavating L.C. should be awarded the Project on Base Bid in the amount of $20,400.00. The City has budgeted more funds for ditching improvements along Pilar Road N. It is recommended Council authorize staff to work with the low bid contractor to perform additional ditching up to an agreed upon amount as determined by the City Council. If you have any questions, please feel free to contact me at 612-597-7140. Sincerely, BOLTON & MENK, INC. Ryan J. Goodman, P.E., City Engineer Enclosure DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer ABSTRACT OF BIDS PILAR ROAD N DITCHING IMPROVEMENTS PROJECT CITY OF SCANDIA, MINNESOTA BMI PROJECT NO. N13.110309 Date: 7/16/2015 ITEM NO. ITEM APPROX. QUANT. UNIT 1 DITCHING IMPROVEMENTS - SEGMENT 1 1 LS 2 DITCHING IMPROVEMENTS - SEGMENT 2 1 LS 3 DITCHING IMPROVEMENTS - SEGMENT 3 1 LS 4 DITCHING IMPROVEMENTS - SEGMENT 4 1 LS 5 DITCHING IMPROVEMENTS - SEGMENT 5 1 LS 6 DITCHING IMPROVEMENTS - SEGMENT 6 1 LS 7 DITCHING IMPROVEMENTS - SEGMENT 7 1 LS $6,000.00 $3,500.00 $5,500.00 $6,000.00 $3,500.00 $5,500.00 TOTAL: 0 2 3 SCANDIA TRUCKING & EXCAVATING SCANDIA, MN PETERSON EXCAVATING SCANDIA, MN RE PETERSON, INC. LUNDSTROM, MN UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT $2,400.00 $2,400.00 $2,680.00 $2,680.00 $3,500.00 $2,500.00 $2,500.00 $3,500.00 $2,500.00 $2,500.00 $2,200.00 $2,200.00 $1,575.00 $1,575.00 $2,200.00 $2,200.00 $3,450.00 $3,450.00 $3,700.00 $3,700.00 $4,575.00 $4,575.00 $6,000.00 $3,500.00 $5,500.00 $6,000.00 $3,500.00 $5,500.00 $3,000.00 $3,000.00 $4,150.00 $4,150.00 $800.00 $800.00 $4,300.00 $7,000.00 $4,300.00 $7,000.00 $6,100.00 $6,100.00 $5,000.00 $5,000.00 $28,500.00 $20,400.00 $27,730.00 ABSTRACT OF BIDS PILAR ROAD N DITCHING IMPROVEMENTS PROJE CITY OF SCANDIA, MINNESOTA BMI PROJECT NO. N13.110309 Date: 7/16/2015 ITEM NO. ITEM APPROX. QUANT. UNIT 1 DITCHING IMPROVEMENTS - SEGMENT 1 1 LS 2 DITCHING IMPROVEMENTS - SEGMENT 2 1 LS 3 DITCHING IMPROVEMENTS - SEGMENT 3 1 LS 4 DITCHING IMPROVEMENTS - SEGMENT 4 1 LS 5 DITCHING IMPROVEMENTS - SEGMENT 5 1 LS 6 DITCHING IMPROVEMENTS - SEGMENT 6 1 LS 7 DITCHING IMPROVEMENTS - SEGMENT 7 1 LS $24,116.00 $45,250.00 $11,700.00 $11,200.00 TOTAL: 4 5 6 DUNAWAY CONSTRUCTION COLUMBUS, MN PETERSON COMPANIES, INC. CHISAGO CITY, MN NEW LOOK CONTRACTING, INC. ROGERS, MN UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT $15,050.00 $15,050.00 $17,570.00 $17,570.00 $12,995.00 $22,265.00 $9,885.00 $12,995.00 $22,265.00 $9,885.00 $12,350.00 $12,350.00 $16,274.00 $16,274.00 $8,100.00 $8,100.00 $12,200.00 $12,200.00 $21,600.00 $21,600.00 $24,116.00 $24,116.00 $45,250.00 $11,700.00 $11,200.00 $45,250.00 $11,700.00 $11,200.00 $11,700.00 $11,700.00 $15,115.00 $15,115.00 $9,500.00 $9,500.00 $15,264.00 $16,624.00 $15,264.00 $16,624.00 $15,100.00 $15,100.00 $13,600.00 $13,600.00 $126,895.00 $93,400.00 $117,163.00 170 ro Z / / 15280 c Q/ / o Q �Pilar Road - _ L N. ' � 1 15171 I 22959 15261 � 'i 'i I GRADE DITCH TO DIRECT DRAINAGE I I I tHROUGH EXISTING DRIVEWAY CULVERT I I ------------ I I LEGEND -------� I ' . ■ ■ ■ ■ ■ = DITCH EXCAVATION = INSTALL CULVERT = EXISTING ROADWAY WETLANDS PER NWI -------------� / O = DITCH SEGMENT �. _ .. -T ---- -- — I , ail . , IIN$TALL 1� 'CMP CULVERT SAWCUT %.. - 15. 0 BITUMINCIUS DRIVEWAYIAND REMOVE BITUMINOIUS DRIVEWAY PAVEMENT �-------------- ------------------ I ■' ■'��0��/ 15540 15359 ���■��2 �� %� CUf BRICK HILL �� ----- — 0 - / 1545 CUT/DOWN BERM --/-------- Qv 22810 ----� --___ a� �5/, 2287 �\ CUT DOWN � � BERM 15359 i �� �� �� 22811 7 O INSTALL 18 CMP �.. a ���� CULVERT - -' - CUT BACK HILL 0 0 66' 12' 12' z 1 3 ��. lL— 3 1 VARIES 2' DITCH EXISTING GRAVEL ROAD BOTTOM NOTES: 1. CONTRACTOR SHALL EXCAVATE A MINIMUM 18" DITCH FROM THE EDGE OF THE EXISTING GRAVEL ROAD. DITCH BOTTOM SHALL BE 2' WIDE. 2. WHERE ADDITIONAL EXCAVATION IS REQUIRED, PROVIDE POSITIVE DRAINAGE THROUGH THE DITCH, THE CONTRACTOR SHALL PROVIDE A DITCH GREATER THAN THE 18" DEPTH. 3. CLEARING AND GRUBBING SHALL BE PERFORMED WHERE NECESSARY. EXISTING STUMPS THAT WERE PREVIOUSLY REMOVED SHALL BE GRUBBED,REMOVED AND DISPOSED OF BY THE CONTRACTOR. 4. DITCHES SHALL BE GRADED TO DIRECT FLOW THROUGH EXISTING CULVERTS. 5. DITCHES SHALL BE RESTORED WITH 4" TOPSOIL, MNDOT SEED MIXTURE 25-142 AND TYPE 3 MULCH EXCEPT IN THE FOLLOWING LOCATIONS, MULCH SHALL BE REPLACED WITH CATEGORY 3 EROSION CONTROL BLANKET: - WHEN RUNNING SLOPES EXCEED 10% - SIDE SLOPES ARE STEEPER THAN 3:1 - WITHIN 100 FEET FROM A WETLAND OR WATER BODY 6. RESTORATION SHALL OCCUR WITHIN 7 DAYS OF COMPLETION OF DITCH GRADING ACTIVITIES. 7. EACH SEGMENT HAS BEEN IDENTIFIED AND THE LUMP SUM BID UNIT PRICE SHALL INCLUDE ALL WORK NECESSARY TO PROVIDE POSITIVE DRAINAGE FOR EACH DITCH SEGMENT, INCLUDING CULVERTS, RESTORATION AND EROSION CONTROL. CITY OF SCANDIA, MINNESOTA 0 150 300 PILAR ROAD N Horizontal Scale In Feet DITCHING IMPROVEMENTS MBOItOn & M -k, Inc. 2013, All Rights Reserved H'.\SCND\N15106565\PILAR- PERKINS -PARIS -PENNFIELD COST ESTIMATE S\FIGURES\CAD\PIIAR DITCHING IMPRUEMENFS-FIGURE 1—G 7/8/15 JUNE 2015 FIGURE NO. 1