Loading...
4. WW Activity Report 3-19-14 Wastewater Activity Report Tim Kieffer, Public Works Director (651) 433-5223 t.kieffer@ci.scandia.mn.us November 1 through November 30, 2013 Maintenance tasks  Read pump run times at all of the lift stations  Responded to a STEP system alarm on the Bliss system Management tasks  Corresponded with EcoCheck  Met with contractor about upgrades to the 201 systems  Created wastewater CIP  Scheduled septic tank repair with contractor December 1 through December 31, 2013 Maintenance tasks  Read pump run times at all of the lift stations  Responded to a STEP alarm on the Bliss system  Plowed drainfields Management tasks  Corresponded with EcoCheck and County  Corresponded with contractor about upgrades to the 201 systems January 1 through January 31, 2014 Maintenance tasks  Read pump run times at all of the lift stations  Responded to two STEP alarms on the Bliss system  Plowed drainfields Management tasks  Corresponded with EcoCheck about the Bliss system  Corresponded with contractor about upgrades to the 201 system  E-mailed the County and MPCA about improvements to the drainfields 2 February 1 through February 28, 2014 Maintenance tasks  Read pump run times at all of the lift stations  Responded to two STEP alarms on the Bliss system  Plowed drainfields  Replaced STEP pump on the Bliss system Management tasks  Corresponded with EcoCheck about the Bliss system  Corresponded with contractors about upgrades to the 201 system  Created a 201database to track maintenance