Loading...
6. Staff Report - 201 System UpgradesStaff Report To: Wastewater Advisory Committee From: Tim Kieffer, Director of Public Works Date: April 8, 2014 Re: 201 System Upgrades Background: Automatic Systems and Connelly Industrial presented their proposals for upgrading Bliss 3 & 4 and Anderson/Erickson Lift Stations at the March 19, 2014 Wastewater Meeting. Both companies had similar valves and control panels. There were only a few differences in their proposals. Automatic Systems’ proposal for $94,918 included the installation of the valves, electrical work, and site preparation for the new control panels. Their proposal also included using Microwave Data Systems (MDS) unlicensed radios that do not require any FCC coordination, licensing, fees or renewals. Staff contacted Brian Malm from Bolton & Menk who stated that Automatic Systems is “pretty much the premiere systems integrator out there”. Connelly Industrial’s proposal for $92,583 did not include the installation of the valves, electrical work, or site preparation. Their proposal included radios that would have to be licensed by the FCC for an additional fee. Proposal: Staff is proposing to award the contract to Automatic Systems because their proposal is more inclusive, using radios that don’t need a license, and have a good reputation. Issue: What company should be awarded the contract to upgrade the 201 system? Fiscal Impact: The Wastewater Capital Improvement Program has $120,000 for upgrades to the system. $25,000 will be needed to replace the pumps. Options: 1) Recommend to the City Council to award the 201 upgrades to Automatic Systems Company. 2) Recommend to the City Council to award the 201 upgrades to Connelly Industrial Electronics, Incorporated. 3) Other options Recommendation: Option 1 Attachments:  Quote from Automatic Systems Co.  Quote from Connelly Industrial Electronics, Inc.