Loading...
5. WW Activity Report 7-30-14 Wastewater Activity Report Tim Kieffer, Public Works Director (651) 433-5223 t.kieffer@ci.scandia.mn.us April 1 through April 30, 2014 Maintenance tasks  Read pump run times at all of the lift stations  Replaced 3 STEP system floats on the Bliss System Management tasks  Corresponded with contractors about upgrades to the 201 System  Met with resident to discuss his frozen building sewer on the Bliss System May 1 through May 31, 2014 Maintenance tasks  Read pump run times at all of the lift stations  Performed annual septic tank inspections Management tasks  Scheduled septic tank inspections with EcoCheck  Corresponded with several residents June 1 through June 30, 2014 Maintenance tasks  Read pump run times at all of the lift stations  Worked with contractor to raise two access covers on the Bliss System  Mowed drainfields and lift stations  Replaced two pumps and one control panel on the 201 System Management tasks  Scheduled septic tank improvements with contractor