6.b2 Better Place Forests Survey_Site PlanM
N
N
M
v
O
CL
I
I
J � I
I
.0:11
CA I
I 1I
BIG MARINE LAKE
OHWL 943.08
/ /I I IIIIIIIIIIIII�,�� IIII//�,
.,X
Ig
/ 1 # 797
,1 III �ERTY B00
�vr►� �a*
/y
NR
�1\\
� I r
l
`� > ,\�\\%ll �/ t�� r
11 fr
)z
\ v1 \I\�.... \(� �.�
\ \� ''�
l\0MIllN
Nl loo,/
�_.
LEGEND \/ Ir
� /l'
—*L— WETLANDSI(rr,
CICU I AVE
�JI IVVL NJ`+. VU
SLOPES GREAT THAN 25� /� ���`J )�
1.10
/( 0 ( ",\-\ x, J
AYn UT
DING PLA N
-
1111(
ENLARGEMENTS
SEE C2-1
EXISTING CONDITIONS / DEMOLITION PLAN
Fish Lake
0 200 i 400
SCALE IN FEET
OA
1113 x
7 OA I 36"OA ' X14"OA I \ \ I\ \
I ' 110
14"OA \ 30"OA o OA
,5"OAj118 OA, _ _yam
P / ) xZi
g9�
\ \� Q l I Q 14' OA + OA 15"0AQ/�+2
i
\ \ \ \ 00 1P' / �/5''6A1 OA A I`'0p413'OA 16"O 0 OA,5"OA OAOA OAI
! 22"OA
0 \ \ \ \ \ 24"OA
\\ \ \ 16"o 27 OA
A , / n
\ \ \ \ \ \
5" `1 24'OA 10 OA
\ \ \ \ \ 1 \ `4 pA . + °°1�\� 12'OA OA OA
r I 11
i
1 1 I \ \\I 28'OA ` \ ►1
1
23' OA ` �\ \ \ 20"0� 18"OA
\ \ ♦ `\ \\ 15'OA
\ \ \ \ \ T 13"OA 00>
' \ 22"OA
\ \ 110 5"` /
8"OA \ \I
CIA
x/003 \ \ \18 OA
I I l
4 _
22 OAC
, + 16"OA \ \ \
\ I I I I 19"OA I P-7,
1 12''OA + A
I
11"0A It+16 "OA I I 1\ I \
\\/ / I ISO �I x 11 II123"OA ' 8110AX
/
23 OA +1,OA7
/ + \I 1 OA �� I
\ I rn 1 '�
v �/ v �•
23OA 11 "OA 1 V\\ 1
1
I
12"OA
_1002� �+ 22"� /
/
l I I 1 I I I 9 14110A - 26 OA
11 "OA
\ 1 I \ \ I + 19"OA \
1 I I
12 gk J
\ \ 1 6x1 I I gg �� \
\ \ \ \ \ I I I 16"OA ' r x +\ I
I 21 "OA
I
\\ \\ I \1 I 4 II OA
rl
\\ \ \ l a
I,
1 \
1 \ \ \ \ 1 1\ \ � / I Ikx
\ \ I
I 1 ' /
1 I I \ ,99ro
6 99I-0 IN, /
/ \\X%,1\ a
1 1 `� \ \ __�
/ / \ 0g ` IIII 11 x
/ 1 I` J �I l k ` -z- \ ( 0 40 8Q-
ry`
rn� I x 0� I LTJ
j II I II ` I � ob/ /
I I / / -5CALE IN \FFEET
Ix 1117 N
TREE REM -OVAL PLAN
TREE PROTECTION NOTE:
INSTALL SNOW FENCE AROUND EACH TREE TO BE PROTECTED PRIOR TO GRADING. FENCE SHALL BE PLACED AT THE DRIP EDGE OR CRITICAL ROOT
ZONES OF THE TREES. FENCING SHALL BE NO CLOSER THAN 6' TO THE TRUNK OF ANY TREE TO BE PROTECTED. THE PERIMETERS FOR TREES BEING
PROTECTED SHALL BE DESIGNATED AT ALL TIMES DURING CONSTRUCTION ACTIVITY AND SIGNAGE SHALL BE INSTALLED AT ALL TREE PROTECTION
AREAS THAT INSTRUCTS WORKERS TO STAY OUT. CONTRACTOR SHALL AVOID ALL AREAS WITHIN TREE PROTECTION FENCE. SOIL SHOULD BE
PROTECTED FROM EROSION AND CHANGES IN CHEMISTRY FROM CONCRETE OR TOXIC MATERIALS SUCH AS FUELS AND PAINTS.
THE CONTRACTOR SHALL HAVE "TREE PAINT" ON SITE AT ALL TIMES. IF AN OAK IS WOUNDED DURING CONSTRUCTION, THE CONTRACTOR MUST
IMMEDIATELY APPLY PAINT TO THE WOUND IN ORDER TO PREVENT OAK WILT. ALL DAMAGE TO TREES TO BE PROTECTED SHALL BE BROUGHT TO THE
ATTFNTICIN C)F THF CIWNFR ANn I ANFISC'APF ARC'HITFC'T
TREE PROTECTION
SCALE 112" = V-0"
EXISTING TREE TO REMAIN
DRIP EDGE OF TREE
2" X 4" WOOD STAKE, POSITIONED AS
NOTED. STRING 4' HIGH, ORANGE
POLYETHYLENE LAMINAR SAFETY
NETTING BETWEEN WOOD STAKES
PLACED 5' ON CENTER AND PLACED
BETWEEN TREE PROTECTION AND
DISTURBED AREAS.
EXISTING GRADE
Tree Protection.DWG
BASE FLOOD ELEVATIONS
THE BASE FLOOD ELEVATIONS (FEMA MAP) LISTS AS FOLLOWS:
FISH LAKE - 854.08* (FLOOD ZONE AE)
BIG MARINE LAKE - 843.08* (FLOOD ZONE AE)
*SURVEY PERFORMED WITH THE NGVD 28 ELEVATION DATUM.
THE FEMA MAP LIST ELEVATIONS AS NAVD 88. THE
DIFFERENCE IN ELEVATIONS IS +0.078.
SITE DATA
TOTAL SITE AREA 4,888,225 SF / 112.2 ACRES
TOTAL DISTURBED AREA 75,450SF / 1.7 ACRES
SOIL CONDITIONS AND TYPE
DEMONTREVILLE SERIES: CONSISTS OF WELL DRAINED SOILS
ON SAND CAPPED GROUND MORAINE. THESE SOILS FORMED
IN A MODERATELY THICK SANDY MANTLE OF EOLIAN OR
LACUSTRINE MATERIAL AND THE UNDERLYING LOAMU
GLACIAL TILL. THEY HAVE RAPID PERMEABILITY IN THE UPPER
SANDY MANTLE AND MODERATELY SLOW PERMEABILITY IN
THE UNDERLYING GLACIAL TILL. SLOPE RANGES FROM 1 TO 25
PERCENT.
LEGEND
CONSTRUCTION /
GRADING LIMITS
t • S TREE TO BE RETAINED
f TREE TO BE PROTECTED
�
SEE 1/C1-1
4% 10
xTREE TO BE REMOVED
ER -OSI -ON CrJNTRDL
SEE SHEETS 0-1 AND 0-2
CALL BEFORE YOU DIG!
% Gopher State One Call
TWIN CITY AREA: 651-454-0002
�a V TOLL FREE: 1-800-252-1166
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
'. Ln U C KS
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55368
763.424.5505
www.Ioucksinc.com
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
04/14/2020 CITY SUBMITTAL
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Paul A. Kangas - LA
License No. 26017
Date 04/14/2020
Loucks Project No.
20072
ZI
PAK
Drawn By
GAJ
W
NN
Review Date
04/14/2020
Zz\
I
I
J � I
I
.0:11
CA I
I 1I
BIG MARINE LAKE
OHWL 943.08
/ /I I IIIIIIIIIIIII�,�� IIII//�,
.,X
Ig
/ 1 # 797
,1 III �ERTY B00
�vr►� �a*
/y
NR
�1\\
� I r
l
`� > ,\�\\%ll �/ t�� r
11 fr
)z
\ v1 \I\�.... \(� �.�
\ \� ''�
l\0MIllN
Nl loo,/
�_.
LEGEND \/ Ir
� /l'
—*L— WETLANDSI(rr,
CICU I AVE
�JI IVVL NJ`+. VU
SLOPES GREAT THAN 25� /� ���`J )�
1.10
/( 0 ( ",\-\ x, J
AYn UT
DING PLA N
-
1111(
ENLARGEMENTS
SEE C2-1
EXISTING CONDITIONS / DEMOLITION PLAN
Fish Lake
0 200 i 400
SCALE IN FEET
OA
1113 x
7 OA I 36"OA ' X14"OA I \ \ I\ \
I ' 110
14"OA \ 30"OA o OA
,5"OAj118 OA, _ _yam
P / ) xZi
g9�
\ \� Q l I Q 14' OA + OA 15"0AQ/�+2
i
\ \ \ \ 00 1P' / �/5''6A1 OA A I`'0p413'OA 16"O 0 OA,5"OA OAOA OAI
! 22"OA
0 \ \ \ \ \ 24"OA
\\ \ \ 16"o 27 OA
A , / n
\ \ \ \ \ \
5" `1 24'OA 10 OA
\ \ \ \ \ 1 \ `4 pA . + °°1�\� 12'OA OA OA
r I 11
i
1 1 I \ \\I 28'OA ` \ ►1
1
23' OA ` �\ \ \ 20"0� 18"OA
\ \ ♦ `\ \\ 15'OA
\ \ \ \ \ T 13"OA 00>
' \ 22"OA
\ \ 110 5"` /
8"OA \ \I
CIA
x/003 \ \ \18 OA
I I l
4 _
22 OAC
, + 16"OA \ \ \
\ I I I I 19"OA I P-7,
1 12''OA + A
I
11"0A It+16 "OA I I 1\ I \
\\/ / I ISO �I x 11 II123"OA ' 8110AX
/
23 OA +1,OA7
/ + \I 1 OA �� I
\ I rn 1 '�
v �/ v �•
23OA 11 "OA 1 V\\ 1
1
I
12"OA
_1002� �+ 22"� /
/
l I I 1 I I I 9 14110A - 26 OA
11 "OA
\ 1 I \ \ I + 19"OA \
1 I I
12 gk J
\ \ 1 6x1 I I gg �� \
\ \ \ \ \ I I I 16"OA ' r x +\ I
I 21 "OA
I
\\ \\ I \1 I 4 II OA
rl
\\ \ \ l a
I,
1 \
1 \ \ \ \ 1 1\ \ � / I Ikx
\ \ I
I 1 ' /
1 I I \ ,99ro
6 99I-0 IN, /
/ \\X%,1\ a
1 1 `� \ \ __�
/ / \ 0g ` IIII 11 x
/ 1 I` J �I l k ` -z- \ ( 0 40 8Q-
ry`
rn� I x 0� I LTJ
j II I II ` I � ob/ /
I I / / -5CALE IN \FFEET
Ix 1117 N
TREE REM -OVAL PLAN
TREE PROTECTION NOTE:
INSTALL SNOW FENCE AROUND EACH TREE TO BE PROTECTED PRIOR TO GRADING. FENCE SHALL BE PLACED AT THE DRIP EDGE OR CRITICAL ROOT
ZONES OF THE TREES. FENCING SHALL BE NO CLOSER THAN 6' TO THE TRUNK OF ANY TREE TO BE PROTECTED. THE PERIMETERS FOR TREES BEING
PROTECTED SHALL BE DESIGNATED AT ALL TIMES DURING CONSTRUCTION ACTIVITY AND SIGNAGE SHALL BE INSTALLED AT ALL TREE PROTECTION
AREAS THAT INSTRUCTS WORKERS TO STAY OUT. CONTRACTOR SHALL AVOID ALL AREAS WITHIN TREE PROTECTION FENCE. SOIL SHOULD BE
PROTECTED FROM EROSION AND CHANGES IN CHEMISTRY FROM CONCRETE OR TOXIC MATERIALS SUCH AS FUELS AND PAINTS.
THE CONTRACTOR SHALL HAVE "TREE PAINT" ON SITE AT ALL TIMES. IF AN OAK IS WOUNDED DURING CONSTRUCTION, THE CONTRACTOR MUST
IMMEDIATELY APPLY PAINT TO THE WOUND IN ORDER TO PREVENT OAK WILT. ALL DAMAGE TO TREES TO BE PROTECTED SHALL BE BROUGHT TO THE
ATTFNTICIN C)F THF CIWNFR ANn I ANFISC'APF ARC'HITFC'T
TREE PROTECTION
SCALE 112" = V-0"
EXISTING TREE TO REMAIN
DRIP EDGE OF TREE
2" X 4" WOOD STAKE, POSITIONED AS
NOTED. STRING 4' HIGH, ORANGE
POLYETHYLENE LAMINAR SAFETY
NETTING BETWEEN WOOD STAKES
PLACED 5' ON CENTER AND PLACED
BETWEEN TREE PROTECTION AND
DISTURBED AREAS.
EXISTING GRADE
Tree Protection.DWG
BASE FLOOD ELEVATIONS
THE BASE FLOOD ELEVATIONS (FEMA MAP) LISTS AS FOLLOWS:
FISH LAKE - 854.08* (FLOOD ZONE AE)
BIG MARINE LAKE - 843.08* (FLOOD ZONE AE)
*SURVEY PERFORMED WITH THE NGVD 28 ELEVATION DATUM.
THE FEMA MAP LIST ELEVATIONS AS NAVD 88. THE
DIFFERENCE IN ELEVATIONS IS +0.078.
SITE DATA
TOTAL SITE AREA 4,888,225 SF / 112.2 ACRES
TOTAL DISTURBED AREA 75,450SF / 1.7 ACRES
SOIL CONDITIONS AND TYPE
DEMONTREVILLE SERIES: CONSISTS OF WELL DRAINED SOILS
ON SAND CAPPED GROUND MORAINE. THESE SOILS FORMED
IN A MODERATELY THICK SANDY MANTLE OF EOLIAN OR
LACUSTRINE MATERIAL AND THE UNDERLYING LOAMU
GLACIAL TILL. THEY HAVE RAPID PERMEABILITY IN THE UPPER
SANDY MANTLE AND MODERATELY SLOW PERMEABILITY IN
THE UNDERLYING GLACIAL TILL. SLOPE RANGES FROM 1 TO 25
PERCENT.
LEGEND
CONSTRUCTION /
GRADING LIMITS
t • S TREE TO BE RETAINED
f TREE TO BE PROTECTED
�
SEE 1/C1-1
4% 10
xTREE TO BE REMOVED
ER -OSI -ON CrJNTRDL
SEE SHEETS 0-1 AND 0-2
CALL BEFORE YOU DIG!
% Gopher State One Call
TWIN CITY AREA: 651-454-0002
�a V TOLL FREE: 1-800-252-1166
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
'. Ln U C KS
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55368
763.424.5505
www.Ioucksinc.com
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
04/14/2020 CITY SUBMITTAL
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Paul A. Kangas - LA
License No. 26017
Date 04/14/2020
Loucks Project No.
20072
Project Lead
PAK
Drawn By
GAJ
Checked By
PAK
Review Date
04/14/2020
C1-1 EXIST COND / DEMOLITION
C2-1 LAYOUT /GRADING PLAN
C3-1 SWPPP PLAN
C3-2 SWPPP DETAILS
C4-1 DETAILS
I
M
N
N
M
v
-G
0
CL
ol
i
/�/ -----� FUTUR&TRAIL
CONNECTION
T-)
/ °()J
/ 1
436 OA
I / / + 17'OA
go M M aft
_40, 4Il\
X10 1.7 \ \
E F \ \ c \I
% 1 \ x 16°� \ \t
FUAJ E DRAINFIELD \
CATI.ONI
, 1 3 OA 41#* I N � FUTURE TRAIL
15''OA � J all to 1\- CONNECTION
003.38 100. / ' , +
Doti CM GR E P MEN i i I/ x
LOCATION 99�
FUTURE WELL I o /i/
\ , � // // \ � S I/ N EE C4-1 � \ � �
',00 1/3
\'00,
\'I
` \ , 3.14
\ 24'OA
'
1003 1.®
/ X004
\ % %
1003.%65/
/ 1°°1 I x
/ FUTUR ILDING - 1' /
100. 1002.9 /
IN
ES I G Q B + R3
I
ETE E 22''A 1002.72
FFOA / x 9961
�D � F25
1/ x //�+ \ / 1002.J6
14OA + 1 1
\ �/ / \
1 ° oA
28"OA \ \ //
20 OA
0
\ / \
\ 22'OA
\ � \ GRAVEL PAVE T \ \
1 I 1 \I • / 'I V03.27 ` SECTION -`5EE 4-1 418 oA \ 1
1 \ OA \+ \' \
U,
I I I I 0'2.50/ °j \ \ \ \ \ \
19"OA 2 "OA
l \ \ \
I I I •/ / 1 1 \
//+ + 16 OA I I \
I I / 23 OA \ f
,S OA x 1
18'OA I tk \ I
x
OA + I '(3- \
/ � A
loo
/j
/ / 1 18 oA / \ 1002
+ 22 OA
1O OA
\ GRAVEL PAVEMENT i/ // �� °o° \✓/
\ SECTION - FOLLOW ./
ALIGNMENT OF
\ \ EXISTING TRAIL
/ \ SEE C4-1 I / +/9''OA
I \
x
21 OA
IOJ
/
\ \ 1 I \°° /
\ x
110()01//
,/ \ SCALE IN FEET
ATH
/M
LAY -OUT /GRADING PLAN ENLARGEMENT
\ %\ l000 /
\ \ 998-
\ X996 xl
gg /
/
.4111
INV W\3.3•
a
1/
\
ell
GRAVEL PAVEMENT
SECTION - FOLLOW /
ALIGNMENT OF
EXISTING TRAIL
SEE C4-1
/
ATCHLINE A �
X o'99
� 1
j/ \ \
/j/, I
I NV,,9i4.0 /
12" HDPE CU'CVERT - 35" /
/ @ 2% SLOPE WITH CMP °
FLARED ENDS / RIPRAP
SEE,C4-1
00,
1 / /
/ j• I I
gg6 � \ 1000
9
/ \ \ 988.
/Zx
/ I x \
\ 1 '\ �
12" HDPE CU LV - 35' \ x // �O'
INV 9
@ 2� SLOPE WITH, MID
FLARED ENDS / RIPRAP
SEE C4-1 j /01
/
INV LIP A1. /\
--_�� // I / 1/0
16 /000
989.5 / '/ / j
E -OF
ATCHLINE B
LAY -OUT /GRADING PLAN ENLARGEMENTS
LEGEND
EXISTING CONTOUR
PRPOSED CONTOUR
+ 968.53 PROPOSED SPOT ELEVATION
X.XX% PROPOSED SLOPE
GRAVEL PAVEMENT SECTION - SEE C4-1
NATIVE SEED MIX - SHORT GRASS WOODS
EDGE OR SAVANNA SEED MIX FROM
PRAIRIE MOON NURSERY (1-866-417-8156)
NATIVE SEED MIX - DETENTION BASIN SEED
MIX FROM PRAIRIE MOON NURSERY
(1-866-417-8156)
ZCHLINE B
�0
1 \
I
.l
j
�/ I //
/1<oI
i
n � \ _
4 ,/ 994— /
993
x/
--_--N
°ry
a
j 2
I /
GRAVEL PAVEMENT
SECTION - FOLLOW
ALIGNMENT OF
EXISTING TRAIL
SE� C4-1
\\ "o" FUTURE
�g9 //j SIGNAGE
•/ $� x M CA -KI 0�I
/ x /
x
FZ1F
F0F
/"oo,
LAY -OUT, GRADING AND
SEEDING NATES
SEE SHEET C4-1
:. L�ucKs
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
'i11:i1V41■Id\WINaV61[GL 1.7
04/14/2020 CITY SUBMITTAL
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Paul A. Kangas - LA
License No.
26017
Date
04/14/2020
QUALITY
CONTROL
Loucks Project No.
20072
Project Lead
PAK
Drawn By
GAJ
Checked By
PAK
Review Date
04/14/2020
SHEETINDEX
C1-1 EXIST COND / DEMOLITION
C2-1 LAYOUT /GRADING PLAN
C3-1
SWPPP PLAN
C3-2
SWPPP DETAILS
C4-1
DETAILS
�7
M
N
O
N
M
O
N
O
CL
■ LnuCKS
■ LnuCKS
RAINGARDEN SECTION: SANDY SOILS
FINISHED GRADE
2" CLASS 2 MNDOT 3138
6" CLASS 5
UNDISTURBED OR
COMPACTED SUBGRADE
LOUCKS PLATE NO.
GRAVEL PAVEMENT SECTION 1 2031
DRAWN 12/2016
GRAVEL PAVEMENT SECTION
SEE C3-1
ENCASEMENT
BEDDING
NOTE:
GRANULAR MATERIALS FURNISHED FOR USE IN FOUNDATION, BEDDING, ENCASEMENT, OR BACKFILL
CONSTRUCTION SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
• FOUNDATION MATERIALS SHALL HAVE 100 PASSING THE 1 1/2" SIEVE AND A MAXIMUM OF 10�L
PASSING THE No. 4 SIEVE. NOT LESS THAN 50eL OF THE MATERIAL RETAINED BY THE No. 4 SIEVE SHALL
HAVE ONE (1) OR MORE CRUSHED FACES. HARD, DURABLE CRUSHED CARBONATE QUARRY ROCK MAY
BE USED FOR FOUNDATION MATERIALS.
• BEDDING AND ENCASEMENT MATERIALS FOR FLEXIBLE PIPE SHALL MEET THE REQUIREMENTS OF
MNDOT SPECIFICATION 3149.261, GRANULAR BORROW, EXCEPT THAT 100P/ SHALL PASS THE ONE
INCH (1 ") SIEVE.
• BACKFILL MATERIALS SHALL CONSIST OF SUITABLE EXISTING TRENCH MATERIALS, EXCEPT AS
OTHERWISE SPECIFIED. SUITABLE MATERIAL SHALL BE DEFINED AS A MINERAL SOIL FREE OF FOREIGN
MATERIALS (RUBBISH, ORGANICS & DEBRIS), FROZEN CLUMPS, OVERSIZE STONE, ROCK, CONCRETE
OR BITUMINOUS CHUNKS, AND OTHER UNSUITABLE MATERIALS THAT MAY DAMAGE PIPE, PREVENT
THOROUGH COMPACTION, OR INCREASE THE RISKS OF SETTLEMENT.
LOUCKS PLATE NO.
PLASTIC PIPE 4008
BEDDING
DRAWN 2/2016
LAY -OUT NOTES
1. BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS.
2. MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER "GOPHER STATE ONE CALL" PRIOR TO COMMENCING ANY GRADING, EXCAVATION OR UNDERGROUND WORK.
3. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITY. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE PLANS.
4. CONTRACTOR SHALL OBTAIN A COUNTY PERMIT FOR OBSTRUCTIONS AND WORK WITHIN RIGHT-OF-WAY. PERMIT IS REQUIRED PRIOR TO REMOVALS OR INSTALLATION.
5. ALL DIMENSIONS ARE SHOWN TO THE EDGE OF BITUMINOUS UNLESS OTHERWISE NOTED.
GRADING NOTES
BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS.
1. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE
CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS PROJECT.
2. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE,
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS.
3. BEFORE BEGINNING CONSTRUCTION THE CONTRACTOR SHALL INSTALL A TEMPORARY ROCK ENTRANCE PAD AT ALL POINTS OF VEHICLE EXIT FROM THE PROJECT SITE. SAID ROCK
ENTRANCE PAD SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF THE PROJECT.
4. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES, AND
CITY REQUIREMENTS.
5. ALL SPOT ELEVATIONS SHOWN REPRESENT FINISHED SURFACE ELEVATIONS UNLESS OTHERWISE NOTED
6. CONTRACTOR TO VERIFY EXISTING INFORMATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY PLAN DISCREPANCIES.
7. GENERAL CONTRACTOR MUST VERIFY ALL TIE IN GRADES.
ABBREVIATION LEGEND
FFE=FINISHED FLOOR ELEVATION
HP=HIGH POINT
LP=LOW POINT
SEEDING NOTES
COORDINATE THE PHASES OF CONSTRUCTION AND SEED INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA.
SEED ALL AREAS DISTURBED DUE TO GRADING. NATIVE SEED SHALL BE SHORTGRASS WOODS EDGE OR SAVANNA MIX FROM PRAIRIE MOON NURSERY (866-417-8156) INSTALLED AT 9.64
LBS/ACRE.
MULCH FOR TURF SEEDED AREAS SHALL BE TYPE 5 WOOD FIBER HYDROMULCH CONFORMING WITH MNDOT 3884. MULCH FOR SEEDED AREAS WITH SLOPES 15� OR GREATER SHALL BE
MNDOT CATEGORY 1, STRAW RD 1S BLANKET CONFORMING WITH MNDOT 3885.
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS.
CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE
WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE
PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, FERTILIZATION AND DISEASE/PEST CONTROL.
CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE.
WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE COMPLETION OF
PLANTING OF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED.
UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING SEEDING IS FROM THE TIME GROUND HAS THAWED TO JUNE 15. FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15;
DORMANT SEEDING IN THE FALL SHALL NOT OCCUR PRIOR TO NOVEMBER 1.
1'(12"-27" DIA. PIPE)
1.5' (30" AND LARGER PIPE)
RIPRAP-,,,
6" GRANULAR
FILTER MATERIAL
GEOTEXTILE FABRIC,
TYPE IV
SECTION B -B
NOTE:
ONE CUBI
APPROXIN
A
L DIA.
■ LnuCKS
GENERAL NOTES:
Project Lead
1.
INSTALL ALL TEMPORARY EROSION CONTROL MEASURES PRIOR TO THE START OF
RCP
QUANTITY
(C.Y.)
CMP/HDPE
QUANTITY
(C.Y.)
ANY CONSTRUCTION OPERATION THAT MAY CAUSE ANY SEDIMENTATION OR
12
8
SILTATION AT THE SITE.
5
2.
INSTALL STORM DRAIN INLET PROCTECTION TO PREVENT CLOGGING OF THE STORM
8
5
SEWER AND SEDIMENT LOADS TO DOWNSTREAM STORM WATER FACILITIES OR
III
18
WATERBODIES.
6
3.
IF THE STORM WATER BMP IS BEING DESIGNED TO SERVE AS A TEMPORARY
24
12
SEDIMENT BASIN, GRADE THE BMP TO WITHIN THREE (3) FEET OF FINAL GRADE TO
PLANT MATERIAL TOLERANT OF
III
PROTECT THE UNDERLYING MATERIAL FROM CLOGGING. ONCE CONSTRUCTION IN
INUNDATION AND DROUGHT.
12
THE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETED AND THE SITE IS
NATIVE PLANTS RECOMMENDED
36
STABILIZED, EXCAVATE THE RAINGARDEN TO FINAL GRADE AND COMPLETE
SEE C2-1
17
CONSTRUCTION OF THE RAINGARDEN.
42
4.
GRADING OF THE RAINGARDENS SHALL BE ACCOMPLISHED USING LOW -IMPACT
27
IV
EARTH -MOVING EQUIPMENT TO PREVENT COMPACTION OF THE UNDERLYING SOILS.
DEPTH REQUIRED TO DRAIN
26
SMALL TRACKED DOZERS AND BOBCATS WITH RUNNER TRACKS ARE
PRACTICE IN 48 HOURS OR LESS,
>48
RECOMMENDED.
NOT TO EXCEED 18".
5.
EXCAVATE THE RAINGARDEN TO THE SPECIFIED DEPTH (ELEVATION). ALL SUB
MATERIAL BELOW THE SPECIFIED ELEVATION SHALL BE LEFT UNDISTURBED, UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
6.
GRADE TO THE DEPTH (ELEVATION) SPECIFIED IN THE CONSTRUCTION DOCUMENTS
UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
PAVEMENT
7.
IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR
IMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL WILL NEED TO BE REMOVED
RIBBON CURB
FROM THE RAINGARDEN PRIOR TO INITIATING THE NEXT STEP IN THE RAINGARDEN
3H:1 L MAX.
CONSTRUCTION PROCESS. THIS IS ESPECIALLY IMPORTANT IF THE RAINGARDEN HAS
BEEN DESIGNED TO INFILTRATE STORM WATER: SEDIMENT THAT HAS BEEN WASHED
INTO THE RAINGARDEN DURING THE EXCAVATION PROCESS CAN SEAL THE
•r
w
IN 1/ii_
PERMEABLE MATERIAL, SIGNIFICANTLY REDUCING THE INFILTRATION CAPACITY OF
If
I I
I -III-
I
THE SOILS.
_
_
I
-III-
I
_
I
El
III
__
I
-
III
_
8.
MATERIAL EXCAVATED FROM THE RAINGARDEN(S) SHALL BE DISPOSED OF ON-SITE
-III -III
_III -III -III -I I
-I
I
I
I I
I
-III
I
I
-III
I I_
AT LOCATIONS (STOCKPILE AREAS) DESIGNATED BY ENGINEER.
-I
-I
-I
9.
NON-STANDARD COMPONENT: CLEAN, WASHED 1 TO UNCH GRAVEL SHALL BE
PRE-TREATMENT STRIP
-III
I -I I I
-I
I I-
PLACED IN THE BOTTOM OF THE RAINGARDENS TO THE DEPTH SPECIFIED IN THE
IIII
I I
I
I
I
I I
CONSTRUCTION DOCUMENTS. GRAVEL SHOULD BE PLACED IN LIFTS AND LIGHTLY
-I
-I
COMPACTED WITH PLATE COMPACTORS
UNDISTURBED, UNCOMPACTED
-III--III-III-III-
10.
NON-STANDARD COMPONENT: THE PERFORATED PIPE (UNDERDRAIN) SHALL BE LAID
INSITU SOIL =
I I
I
I
I
MI
MI
I-II
DIRECTLY ON THE GRAVEL BED. GRADE AND ALIGNMENT SHALL NOT VARY FROM
-III
-I
-III
I I
_-_-_-_-_-_
III-III-
III
-III
-III
-III
-I
I I
THE PRESCRIBED GRADE BY MORE THAN 0.03 FEET (9 MM) AT ANY POINT. THE
3" SHREDDED WOOD MULCH �
--
-
I I �
-III
-III
-III-
I
JOINTS BETWEEN SECTIONS OF PIPE SHALL BE CONNECTED IN A FASHION
(MnDOT TYPE 6)
III
-III
-I
I -III
I
I-
_I
I I I
III
-III
-III
ACCEPTABLE TO ENGINEER. ONCE THE PIPE IS IN PLACE, IT SHALL BE COVERED
-_=
III
I
I
I I I
III-
I -III-III
IMMEDIATELY WITH GRANULAR MATERIAL AS SPECIFIED IN THE CONSTRUCTION
RAINGARDEN BIOMEDIA:
-I
I
-III
DOCUMENTS. THE GRANULAR MATERIAL SHALL BE OF UNIFORM DEPTH ON BOTH
2" CERTIFIED ORGANIC
SIDES OF THE PIPE. SPECIAL INLETS AND SPECIAL DEVICES AT THE OUTLET END OF
COMPOST - MNDOT GRADE 2
BOTTOM SHALL BE GRADED
THE PIPE SHALL BE CONSTRUCTED AS SHOWN IN THE PLANS.
TILL IN 6" DEEP
FLAT WITHOUT DIPS OR SWALES 11.
RAINGARDEN SHALL BE OVER -EXCAVATED TO SPECIFIED DEPTH AND BACK FILLED
WITH A WELL BLENDED MIXTURE OF 60-70P/ HOMOGENOUS CONSTRUCTION SAND,
DECOMPACT SUBGRADE
20-306� MnDOT GRADE 2 COMPOST AND 10-206� NATIVE TOPSOIL BY VOLUME.
MINIMUM 18"
12.
PORTIONS OF RAINGARDENS TO BE PLANTED SHALL RECEIVE 3" OF SHEDDED
WOODCHIP MULCH (MNDOT TYPE 6).
13.
PORTIONS OF RAINGARDENS TO BE SEEDED SHALL BE MULCHED WITH CLEAN GRAIN
STRAW (MNDOT TYPE 3) AT A RATE OF 2 TONS PER ACRE.
14.
SEEDING AND INSTALLATION OF EROSION CONTROL BLANKET SHALL BE
LOUCKS PLATE NO.
■ LnuCKS
■ LnuCKS
RAINGARDEN SECTION: SANDY SOILS
FINISHED GRADE
2" CLASS 2 MNDOT 3138
6" CLASS 5
UNDISTURBED OR
COMPACTED SUBGRADE
LOUCKS PLATE NO.
GRAVEL PAVEMENT SECTION 1 2031
DRAWN 12/2016
GRAVEL PAVEMENT SECTION
SEE C3-1
ENCASEMENT
BEDDING
NOTE:
GRANULAR MATERIALS FURNISHED FOR USE IN FOUNDATION, BEDDING, ENCASEMENT, OR BACKFILL
CONSTRUCTION SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
• FOUNDATION MATERIALS SHALL HAVE 100 PASSING THE 1 1/2" SIEVE AND A MAXIMUM OF 10�L
PASSING THE No. 4 SIEVE. NOT LESS THAN 50eL OF THE MATERIAL RETAINED BY THE No. 4 SIEVE SHALL
HAVE ONE (1) OR MORE CRUSHED FACES. HARD, DURABLE CRUSHED CARBONATE QUARRY ROCK MAY
BE USED FOR FOUNDATION MATERIALS.
• BEDDING AND ENCASEMENT MATERIALS FOR FLEXIBLE PIPE SHALL MEET THE REQUIREMENTS OF
MNDOT SPECIFICATION 3149.261, GRANULAR BORROW, EXCEPT THAT 100P/ SHALL PASS THE ONE
INCH (1 ") SIEVE.
• BACKFILL MATERIALS SHALL CONSIST OF SUITABLE EXISTING TRENCH MATERIALS, EXCEPT AS
OTHERWISE SPECIFIED. SUITABLE MATERIAL SHALL BE DEFINED AS A MINERAL SOIL FREE OF FOREIGN
MATERIALS (RUBBISH, ORGANICS & DEBRIS), FROZEN CLUMPS, OVERSIZE STONE, ROCK, CONCRETE
OR BITUMINOUS CHUNKS, AND OTHER UNSUITABLE MATERIALS THAT MAY DAMAGE PIPE, PREVENT
THOROUGH COMPACTION, OR INCREASE THE RISKS OF SETTLEMENT.
LOUCKS PLATE NO.
PLASTIC PIPE 4008
BEDDING
DRAWN 2/2016
LAY -OUT NOTES
1. BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS.
2. MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER "GOPHER STATE ONE CALL" PRIOR TO COMMENCING ANY GRADING, EXCAVATION OR UNDERGROUND WORK.
3. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITY. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE PLANS.
4. CONTRACTOR SHALL OBTAIN A COUNTY PERMIT FOR OBSTRUCTIONS AND WORK WITHIN RIGHT-OF-WAY. PERMIT IS REQUIRED PRIOR TO REMOVALS OR INSTALLATION.
5. ALL DIMENSIONS ARE SHOWN TO THE EDGE OF BITUMINOUS UNLESS OTHERWISE NOTED.
GRADING NOTES
BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS.
1. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE
CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS PROJECT.
2. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE,
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS.
3. BEFORE BEGINNING CONSTRUCTION THE CONTRACTOR SHALL INSTALL A TEMPORARY ROCK ENTRANCE PAD AT ALL POINTS OF VEHICLE EXIT FROM THE PROJECT SITE. SAID ROCK
ENTRANCE PAD SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF THE PROJECT.
4. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES, AND
CITY REQUIREMENTS.
5. ALL SPOT ELEVATIONS SHOWN REPRESENT FINISHED SURFACE ELEVATIONS UNLESS OTHERWISE NOTED
6. CONTRACTOR TO VERIFY EXISTING INFORMATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY PLAN DISCREPANCIES.
7. GENERAL CONTRACTOR MUST VERIFY ALL TIE IN GRADES.
ABBREVIATION LEGEND
FFE=FINISHED FLOOR ELEVATION
HP=HIGH POINT
LP=LOW POINT
SEEDING NOTES
COORDINATE THE PHASES OF CONSTRUCTION AND SEED INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA.
SEED ALL AREAS DISTURBED DUE TO GRADING. NATIVE SEED SHALL BE SHORTGRASS WOODS EDGE OR SAVANNA MIX FROM PRAIRIE MOON NURSERY (866-417-8156) INSTALLED AT 9.64
LBS/ACRE.
MULCH FOR TURF SEEDED AREAS SHALL BE TYPE 5 WOOD FIBER HYDROMULCH CONFORMING WITH MNDOT 3884. MULCH FOR SEEDED AREAS WITH SLOPES 15� OR GREATER SHALL BE
MNDOT CATEGORY 1, STRAW RD 1S BLANKET CONFORMING WITH MNDOT 3885.
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS.
CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE
WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE
PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, FERTILIZATION AND DISEASE/PEST CONTROL.
CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE.
WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE COMPLETION OF
PLANTING OF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED.
UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING SEEDING IS FROM THE TIME GROUND HAS THAWED TO JUNE 15. FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15;
DORMANT SEEDING IN THE FALL SHALL NOT OCCUR PRIOR TO NOVEMBER 1.
1'(12"-27" DIA. PIPE)
1.5' (30" AND LARGER PIPE)
RIPRAP-,,,
6" GRANULAR
FILTER MATERIAL
GEOTEXTILE FABRIC,
TYPE IV
SECTION B -B
NOTE:
ONE CUBI
APPROXIN
A
L DIA.
■ LnuCKS
U Ur,HINVLH r,
FILTER MATERIAL
SECTION A -A
11
RIPRAP
1' (12"-27" DIA. PIPE)
1.5' (30" AND LARGER PIPE)
RANDOM / HAND
PLACED RIPRAP
GEOTEXTILE FABRIC, TYPE IV
EXTEND 1' UNDER APRON
LOUCKS PLATE NO.
4308
DRAWN 2/2016
:. LOUCKS
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
04/14/2020 CITY SUBMITTAL
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
Df the State of Minnesota.
Paul A. Kangas - LA
License No. 26017
Date 04/14/2020
Loucks Project No.
MINIMUM RIPRAP REQUIRED
Project Lead
DIA. OF
PIPE (IN.)
L (FT.)
RCP
QUANTITY
(C.Y.)
CMP/HDPE
QUANTITY
(C.Y.)
CLASS
12
8
5
5
III
15
8
5
5
III
18
10
6
7
III
24
12
8
10
III
30
14
12
13
III
36
16
14
17
III
42
18
22
27
IV
48
20
26
32
IV
>48
22-28
30-40
32-40
IV
U Ur,HINVLH r,
FILTER MATERIAL
SECTION A -A
11
RIPRAP
1' (12"-27" DIA. PIPE)
1.5' (30" AND LARGER PIPE)
RANDOM / HAND
PLACED RIPRAP
GEOTEXTILE FABRIC, TYPE IV
EXTEND 1' UNDER APRON
LOUCKS PLATE NO.
4308
DRAWN 2/2016
:. LOUCKS
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
04/14/2020 CITY SUBMITTAL
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
Df the State of Minnesota.
Paul A. Kangas - LA
License No. 26017
Date 04/14/2020
Loucks Project No.
20072
Project Lead
PAK
Drawn By
GAJ
Checked By
PAK
Review Date
04/14/2020
C1-1 EXIST COND / DEMOLITION
C2-1 LAYOUT/ GRADING PLAN
C3-1 SWPPP PLAN
C3-2 SWPPP DETAILS
C4-1 DETAILS
ro
SWPPP NOTES
1. PROJECT DESCRIPTION
THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING A GRAVEL ROAD AND PARKING
SPOTS, AS WELL AS RAINGARDENS.
THIS SITE IS LOCATED WITHIN A ONE MILE RADIUS OF THE MISSISSIPPI RIVER -AN IMPAIRED RIVER.
2. SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS:
1. INSTALL PROTECTIVE FENCE AROUND PERIMETER OF CONSTRUCTION AREA AND BASIN AREAS
2. CLEAR AND GRUB SITE
3. STRIP AND STOCKPILE TOPSOIL
4. REMOVE PAVEMENTS
5. ROUGH GRADE SITE
6. INSTALL UTILITIES
7. INSTALL GRAVEL
8. FINAL GRADE SITE
9. REMOVE ACCUMULATED SEDIMENT FROM BASINS
10. SEED AND MULCH
11. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT
FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
3. SITE DATA:
AREA OF DISTURBANCE: 1.81 ± AC
PRE -CONSTRUCTION IMPERVIOUS AREA: 0.20 AC
TOTAL PROPOSED IMPERVIOUS AREA: 0.69 AC
GENERAL SOIL TYPE: HSG A
4. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES,
SIGNS, SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS.
5. ALL DISTURBED GROUND LEFT INACTIVE SHALL BE STABILIZED BY SEEDING OR SODDING (ONLY
AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT
CONTROL MEASURE. STABILIZATION MUST BE INITIATED IMMEDIATELY AND COMPLETED
WITHIN SEVEN (7) CALENDAR DAYS AFTER CONSTRUCTION ACTIVITY IN THAT PORTION OF THE
SITE TEMPORARILY OR PERMANENTLY CEASES, STOCKPILING INCLUDED.
6. ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES,
SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET.
DENOTES SLOPES GREATER THAN 3:1. ALL 3:1 SLOPES TO BE STABILIZED WITH EROSION
CONTROL BLANKET
7. ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL
DISCHARGE ARE STABILIZED.
8. TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE
PLACED IN SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. TEMPORARY
STOCKPILES WITHOUT SIGNIFICANT AMOUNT OF SILT, CLAY, OR ORGANIC COMPOUNDS ARE
EXEMPT EX: CLEAN AGGREGATE STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND
STOCKPILES.
9. SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER
POSSIBLE. IF NOT POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE BMPS.
10. SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL
REQUIREMENTS.
11. THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR INSPECTIONS OR
AS -BUILT DRAWINGS VERIFYING PROPER CONSTRUCTION OF THE BMPS.
12. THE OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE AND IS RESPONSIBLE
FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR
(CONTRACTOR) WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE FOR PARTS II.B.,
PART II.C, PART II.B-F, PART V, PART IV AND APPLICABLE CONSTRUCTION ACTIVITY
REQUIREMENTS FOUND IN APPENDIX A, PART C. OF THE NPDES PERMIT AND IS JOINTLY
RESPONSIBLE WITH THE OWNER FOR COMPLIANCE WITH THOSE PORTIONS OF THE PERMIT.
13. TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A
NOTICE OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN
30 DAYS AFTER ONE OR MORE OF THE FOLLOWING CONDITIONS HAVE BEEN MET:
A. FINAL STABILIZATION, PER NPDES PERMIT PART IV.G. HAS BEEN ACHIEVED ON ALL
PORTIONS OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE.
B. TRANSFER OF OWNERSHIP AS DESCRIBED IN THE PERMIT.
15. INSPECTIONS
A. INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS
REQUIRED.
B. EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5"
OVER 24 HOUR RAIN EVENT.
C. STABILIZED AREAS: ONCE EVERY 30 DAYS
D. FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING
CONSTRUCTION.
E. INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING
OF THE NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME
OF PERSON(S) CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS
FOR CORRECTIVE ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5
INCHES IN A 24 HOUR PERIOD.
16. MINIMUM MAINTENANCE
A. SILT FENCE TO BE REPAIRED, REPLACED, SUPPLEMENTED WHEN NONFUNCTIONAL, OR 1/3
FULL; WITHIN 24 HOURS
B. SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE
VOLUME. REMOVAL MUST BE COMPLETE WITHIN 72 HOURS OF DISCOVERY.
C. SEDIMENT REMOVED FROM SURFACE WATERS WITHIN MSEVEN DAYS
D. CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED WITH 24 HOURS.
E. PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER FOR ALL EVENTS
GREATER THAN Y" IN 24 HOURS
17. THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS
MUST BE KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE
OPERATIONAL CONTROL OF THE SITE.
18. OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL
INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS,
AND REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER
MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING
NPDES NOTICE OF TERMINATION.
19. SWPPP MUST BE AMENDED WHEN:
A. THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL
CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE
B. INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING
WATER QUALITY STANDARDS.
C. THE BMPS IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT
CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT.
D. AT ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE, THE MPCA MAY DETERMINE THAT THE
PROJECT'S STORMWATER DISCHARGES MAY CAUSE, HAVE REASONABLE POTENTIAL TO
CAUSE, OR CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY
STANDARD, OR THAT THE SWPPP DOES NOT INCORPORATE THE APPLICABLE
REQUIREMENTS IN PART III.A.8., (IMPAIRED WATERS AND TMDLS). IF A WATER QUALITY
STANDARD CHANGES DURING THE TERM OF THIS PERMIT, THE MPCA WILL AKE A
DETERMINATION AS TO WHETHER A MODIFICATION OF THE SWPPP IS NECESSARY TO
ADDRESS THE NEW STANDARD. IF THE MPCA MAKES SUCH DETERMINATION (S) OR ANY OF
THE DETERMINATIONS IN PARTS 111.13.1.-3., THE MPCA WILL NOTIFY THE PERMITTEE(S) IN
WRITING. IN RESPONSE, THE PERMITTEE(S) MUST AMEND THE SWPPP TO ADDRESS THE
IDENTIFIED CONCERNS AND SUBMIT INFORMATION REQUESTED BY THE MPCA, WHICH
MAY INCLUDE AN INDIVIDUAL PERMIT APPLICATION. IF THE MPCA'S WRITTEN
NOTIFICATION REQUIRES A RESPONSE, FAILURE TO RESPOND WITHIN THE SPECIFIED
TIMEFRAME CONSTITUTES A PERMIT VIOLATION.
20. CONCRETE WASHOUT AREA
A. CONTRACTOR TO PROVIDE PREFABRICATED CONCRETE WASH-OUT CONTAINER WITH RAIN
PROTECTION PER PLAN.
B. CONCRETE WASH-OUT TO BE IDENTIFIED WITH SIGNAGE STATING "CONCRETE WASHOUT
AREA DO NOT OVERFILL"
C. CONCRETE WASHOUT WATER NEEDS TO BE PUMPED WITHIN 24 HOURS OF STANDING
WATER IN WASHOUT AREA.
21. IN THE EVENT OF ENCOUNTERING A WELL OR SPRING DURING CONSTRUCTION CONTRACTOR
TO CEASE CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER.
22. PIPE OULTETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION
WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER.
23. FINAL STABILIZATION
FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED
AND THAT DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER
WITH 70% OF THE EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN
INSTALLED. ALL TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT
SHALL BE REMOVED FROM PERMANENT CONVEYANCES AND SEDIMENTATION BASINS IN ORDER
TO RETURN THE POND TO DESIGN CAPACITY.
24. TEMPORARY SEDIMENTATION BASINS
A. THE TEMPORARY SEDIMENTATION BASINS SHALL BE CONSTRUCTED AND MADE
OPERATIONAL PRIOR TO DISTURBANCE OF 10 OR MORE ACRES DRAINING TO A COMMON
LOCATION.
B. TEMPORARY SEDIMENTATION BASINS ARE REQUIRED PRIOR TO RUNOFF LEAVING THE
CONSTRUCTION SITE OR ENTERING SURFACE WATERS WHEN 10 OR MORE ACRES OF
DISTURBED SOILS DRAIN TO A COMMON LOCATION. THE BASIN MUST PROVIDE 3,600
CUBIC FEET OF STORAGE BELOW THE OUTLET PER ACRE DRAINED. IF HYDRAULIC
CALCULATIONS ARE AVAILABLE, THE TEMPORARY SEDIMENTATION BASIN MUST PROVIDE A
STORAGE VOLUME EQUIVALENT TO THE 2 -YEAR, 24-HOUR STORM, BUT IN NO CASE LESS
THAN 1800 CUBIC FEET PER ACRE DRAINED. THE TEMPORARY SEDIMENTATION BASIN MUST
BE CONSTRUCTED AND MADE OPERATIONAL CONCURRENT WITH THE START OF SOIL
DISTURBANCE UP GRADIENT OF THE POND. THE TEMPORARY SEDIMENTATION BASIN
SHALL BE DESIGNED TO PREVENT SHORT CIRCUITING. THE OUTFALL SHALL BE DESIGNED
TO REMOVE FLOATABLE DEBRIS, ALLOW FOR COMPLETE DRAWDOWN OF THE POND FOR
MAINTENANCE ACTIVITIES, AND HAVE ENERGY DISSIPATION. THE EMERGENCY SPILLWAY
SHALL BE STABILIZED.
C. TEMPORARY SEDIMENTATION BASINS SHALL BE SITUATED OUTSIDE OF SURFACE WATERS
AND ANY REQUIRED BUFFER ZONE, AND MUST BE DESIGNED TO AVOID DRAINING
WETLANDS, UNLESS THE IMPACT IS IN COMPLIANCE WITH THE REQUIREMENTS OF THIS
PERMIT.
D. EXCESSIVE SEDIMENT -LADEN WATER THAT IS NOT PROPERLY FILTERED WILL NOT BE
PERMITTED TO DISCHARGE FROM SIRE.
25. DEWATERING AND BASIN DRAINING
A. TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING
SHALL BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE
PROJECT SITE UNLESS INFEASIBLE. THE TEMPORARY OR PERMANENT BASIN MAY DISCHARGE
TO SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE
ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT THE NUISANCE
CONDITIONS WILL NOT RESULT FROM THE DISCHARGE. DISCHARGE POINTS SHALL BE
ADEQUATELY PROTECTED FROM EROSION AND PROPER VELOCITY DISSIPATION PROVIDED.
B. ALL WATER FROM DEWATERING OR BASIN -DRAINING ACTIVITIES MUST BE DISCHARGED IN
A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN THE RECEIVING
CHANNELS OR ON DOWN SLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING
SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND.
C. IF FILTERS WITH BACKWASH WATERS ARE USED, THE BACKWASH WATER SHALL BE HAULED
AWAY FOR DISPOSAL, RETURNED TO THE BEGINNING OF THE TREATMENT PROCESS, OR
INCORPORATED INTO SITE IN A MANNER THAT DOES NOT CAUSE EROSION. BACKWASH
WATER MAY BE DISCHARGED TO SANITARY SEWER IF PERMISSION IS GRANTED BY THE
SANITARY SEWER AUTHORITY.
MORE INFORMATION ON INFILTRATION DESIGN, PROHIBITIONS AND APPROPRIATE SITE
CONDITIONS.
31. RESPONSIBILITIES
A. THE OWNER MUST IDENTIFY A CONTRACTOR WHO WILL OVERSEE THE SWPPP
IMPLEMENTATION AND THE PERSON RESPONSIBLE FOR INSPECTION AND
MAINTENANCE:
B. THE OWNER MUST IDENTIFY THE A PERSON WHO WILL BE RESPONSIBLE FOR LONG TERM
OPERATIONS AND MAINTENANCE OF THE PERMANENT STORMWATER
MANAGEMENT SYSTEM:
32. TRAINING REQEMENTS
THE PERMITTES(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE
BEEN TRIANED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS.
1. WHO MUST BE TRAINED:
A. INDIVIDUAL(S) PREPARING THE SWPP FOR THE PROJECT
B. INDIVIDUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING
THE SWPPP AND INDIVIDUALS(S) PERFORMING INSPECTIONS AS REQUIRED IN
PART IV.E. ONE OF THESE INDIVDUAL(S) MUST BE AVAILABLE FOR AN ONSITE
INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA.
C. INDIVIDUAL(S) PERFORMING OR SUPERVISING THE INSTALLATION,
MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL ON A
PROJECT MUST BE TRAINED IN THESE JOB DUTIES.
2. TRAINING CONTENT:
THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE
INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES
COVERED UNDER THIS PERMIT FOR THE PROJECT. AT LEAST ONE INDIVIDUAL PRESENT
ON THE PERMITTED PROJECT SITE (OR AVAILABLE TO THE PROJECT SIRE IN 72 HOURS)
MUST BE TRAINED IN THE JOB DUTIES DESCRIBED IN PART III.F.1.13. AND
PARTIII.F.1.C.
3. THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL, STATE,
FEDERAL AGENCIES, PROFESSIONAL OR OTHER ENTITIES WITH EXPERTISE IN EROSION
PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE
MINNESOTA NPDES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFESHER-TRAINING
MUST BE ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE
DATE OF THIS PERMIT.
33. LIST OF CONTACTS
TILE
NAME
COMPANY
PHONE NUMBER
OWNER
GAJ
Checked By
PAK
PROJECT MANAGER
PAUL KANGAS
LOUCKS
763-496-6713
ENGINEER SWPPP
VAL ANDERSON
LOUCKS
763-496-6728
CONTRACTOR
SITE MANGER
* MPCA 24HR. HAZARDOUS SPILL HOTLINE: 651-649-5457 OF 80420798
26. POLLUTION PREVENTION
A. BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE
UNDER COVER TO PREVENT DISCHARGE OR PROTECTED BY AN EFFECTIVE MEANS
DESIGNED TO MINIMIZE CONTACT WITH STORMWATER.
B. PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND
LANDSCAPE MATERIALS MUST BE UNDER COVER.
C. HAZARDOUS MATERIALS AND TOXIC WASTE MUST BE PROVIDED TO PREVENT VANDALISM. CONSTRUCTION STORMWATER SPECIAL WATERS SEARCH MAP
D. SOLID WASTER MUST BE STORED, COLLECTED AND DISPOSED OF IN COMPLIANCE WITH
MINN. R. CH 7035.
E. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE
TIPPED OR KNOCKED OVER. SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN
ACCORDANCE WITH MINN. R. CH 7041.
F. DISCHARGE OF SPILLED OR LEAKED CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE PROJECT SITE
CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED SHALL BE PREVENTED USING
DRIP PANS OR ABSORBENTS. SUPPLIES SHALL BE AVAILABLE AT ALL TIMES TO CLEAN UP
DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD MUST BE
AVAILABLE FOR RECOVERED SPILLED MATERIALS.
27. DESIGN CALCULATIONS
TEMPORARY & PERMANENT STORMWATER TREATMENT ARE DESIGNED TO MEET MPCA GENERAL
& SPECIAL WATER REQUIREMENTS. CALCULATIONS ARE PART OF THE HYDROLOGY REPORT,
WHICH IS TO BE CONSIDERED PART OF THE SWPPP DOCUMENTS. SEE HYDROLOGY REPORT FOR
ADDITIONAL INFORMATION.
28. GENERAL STORMWATER DISCHARGE REOUIREMENTS
ALL REQUIREMENTS LISTED IN PART III OF THE PERMIT FOR DESIGN OF THE PERMANENT
STORMWATER MANAGEMENT SYSTEM AND DISCHARGE HAVE BEEN INCLUDED IN THE
PREPARATION OF THIS SWPP. THESE INCLUDE BUT ARE NOT LIMITED TO:
A. THE EXPECTED AMOUNT, FREQUENCY, INTENSITY, AND DURATION PRECIPITATION
B. THE NATURE OF STORMWATER RUNOFF AND RUN-ON AT THE SITE.
C. PEAK FLOW RATES AND STORWATER VOLUMES TO MINIMIZE EROSION AT OUTLETS
AND DOWNSTREAM CHANNEL AND STREAM BANK EROSION.
D. THE RANGE OF SOIL PARTICLE SIZES EXPECTED TO BE PRESENT ON THE SITE.
29. CONSTRUCTION OF FILTRATION BASINS
A. NO HEAVY TRAFFIC ON FILTRATION AREAS. CONSTRUCTION TO BE DONE WITH MINIMAL
COMPACTION COMPACTION TO FILTRATION AREAS. IF COMPACTION IS ENCOUNTERED,
BASIN SOILS FOR THE FIRST & MUST BE REMOVED & RELAID.
B. INFILTRATION SYSTEMS MUST NOT BE EXCAVATED TO FINAL GRADE UNTIL THE
CONTRIBUTING DRAINAGE AREA HAD BEEN CONSTRUCTED AND FULLY STABILIZED UNLESS
RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS ARE PROVIDED(PART
III.D.1.C.).
C. WHEN AN INFILTRATION SYSTEM IS EXCAVATED TO FINAL GRADE (OR WITHIN THREE (3)
FEET OF FINAL GRADE), THE PERMITTEES) MUST EMPLOY RIGOROUS EROSION PREVENTION
AND SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO KEEP SEDIMENT AND RUNOFF
COMPLETELY AWAY FROM THE INFILTRATION AREA. THE AREA MUST BE STAKED OFF AND
MARKED SO THAT HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT WILL NOT COMPACT
THE SOIL IN THE PROPOSED INFILTRATION AREA.
D. TO PREVENT CLOGGING OF THE INFILTRATION OR FILTRATION SYSTEM, THE PERMITTEE(S)
MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, SMALL
SEDIMENTATION BASIN, OR WATER QUALITY INLET (E.G., GRIT CHAMBER) TO SETTLE
PARTICULATES BEFORE THE STORMWATER DISCHARGES INTO THE INFILTRATION OF
FILTRATION SYSTEM.
30. POST CONSTRUCTION
THE WATER QUALITY VOLUME THAT MUST BE RETAINED ON SITE BY THE PROJECT'S PERMANENT
STORMWATER MANAGEMENT SYSTEM DESCRIBED IN PART III.D. SHALL BE ONE (1) INCH OF
RUNOFF FROM THE NEW IMPERVIOUS SURFACES CRATED BY THE PROJECT. SEE PART III.D.1. FOR
r
a
Y
Z
i k -
18.1h 51 N
CERTIFICATION
off LAKE
PAIRED W
7
16 Marine l ain Lake},
r
D \y
UNIVERSITY OF MINNESOTA
Val Anderson
�1"Izz - 6�2�
Design of Construction SWPPP-
4",6 WIwi
ri.
,N �4 Z
F
o
OIL
4VI, Washington yaunty, MN, Esn Can2d1A(,R%F FiE, Gamun, INC% JEC il,_
BIG MARINE LAKE
IMPAIRED WATER
ER
NOTES:
1. PLACE BOTTOM EDGE OF WIRE FENCE INTO 6 IN DEEP TRENCH.
2. POSTS SHALL BE:
• 6 FT MAX. SPACING.
• STANDARD STEEL T -TYPE POSTS.
• 5' MIN. LENGTH POSTS, DRIVEN 2 FT INTO THE GROUND.
3. ATTACH WIRE FENCE TO STEEL POSTS WITH NO. 9 GA. ALUMINUM
WIRE DR NO. 9 GALVANIZED STEEL PRE-FDRMED CLIPS.
4. ATTACH FABRIC TO WIRE FENCING WITH WIRE DR ZIP TIES. A MIN.
OF 3 ZIP TIES PER POST. EXTEND BDTTDM DF FABRIC INTO TRENCH.
5. BACKFILL TRENCH & COMPACT.
WIRE MESH STEAL FENCE
POST
G EDTEXTI LE
FABRIC PER
IN M N DDT 3886
WIRE MESH
G EDTEXTI LE
IN IN IN IN N,F�,�?� FABRIC PER
MN DDT 3886
6„
6°
LrJUCKS PLATE NO.
■■ LOUCKS FENCE DUTY SILT 3001
FENCE
DRAWN 12/2016
NOTES:
1. RDCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DDT CA -1 OR
CA -2 COURSE AGGREGATE. (WASHED)
2. A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
■■ DUCKS
ROCK ENTRANCE TO
CONSTRUCTION SITE
LDUCKS PLATE NO.
3004
DRAWN 2/2016
i� LnuCKS
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
04/14/2020 CITY SUBMITTAL
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Paul A. Kangas - LA
License No. 26017
Date 04/14/2020
Loucks Project No.
20072
Project Lead
PAK
Drawn By
GAJ
Checked By
PAK
Review Date
04/14/2020
C1-1 EXIST CDND / DEMDLITIDN
C2-1 LAYOUT /GRADING PLAN
C3-1 SWPPP PLAN
C3-2 SWPPP DETAILS
C4-1 DETAILS