Loading...
7.d1 2020 Streets Pay Request No 2QBOLTON & MENK Real People. Real Solutions. June 9, 2020 Honorable Mayor and City Council 14727 2091h Street N Scandia, MN 55073 RE: 2020 Street Improvements Contractor's Request for Payment No. 2 City of Scandia, MN Dear Mayor and Council: 2035 County Road D East Maplewood, MN 55109-5314 Ph: (651) 704-9970 Fax: (651) 704-9971 Bolton-Menk.com Enclosed please find Contractor's Request for Payment No. 2 for the work performed by Valley Paving, Inc. completed through June 5, 2020 on the 2020 Street Improvements Project. This pay request includes a reduction of retainage to 1% as the project is substantially completed. We recommend the Council approves the pay request in the amount of $98,882.75. Please call me at (612) 597-7140 if you have any questions or concerns regarding this contractor's pay request. Sincerely, Bolton & Menk, Inc. Ryan J. Goodman, P.E. City Engineer Enclosure: Contractor's Request for Payment No. 2 H:\SCND\N13118530\7-Construction\E-PayApplications\CounciI Letters\Mayor and City Council_RJG^2020 Streets Pay Request No 2.docx Balton & Menk is an equal opportunity emplcyec Date: 6/8/2020 CONTRACTOR'S PAY REQUEST Pay Request No. 2 2020 Street Improvements City of Scandia, MN For Period Ending: 6/5/2020 BMI Project No. N13.118530 Original Contract Amount $505,848.00 Approved Change Orders $0.00 Revised Contract Amount $505,848.00 Completed Work to Date $352,937.77 Stored Materials on Hand $0.00 Sub-Total $352,937.77 Retained Percentage 1% ($3,529.38) Deduction $0.00 Liquidated Damages $0.00 Total $349,408.39 Total Amount Paid on Previous Estimates $250,525.64 Amount Due Contractor This Pay Request $98,882.75 Certificate for Partial Payment I hereby certify that, to the best of my knowledge and belief, all items quantities and prices of work and material shown on this Estimate are correct and that all work has been performed in full accordance with the terms and conditions of the Contract for this project between the Owner and the undersigned Contractor, and as amended by any authorized changes, and that the foregoing is a true and correct statement of the contract amount for the period covered by this Estimate. Approved for Payment: Valley paving, Inc. Signature Date 880013th Avenue E Shakopee, MN 55379 Printed Name and Title Checked and Approved as to Quantities and Amount: Signature Date Bolton & Menk, Inc. 2035 County Road D East Maplewood, MN 55109 Printed Name and Title Approved for Payment: City of Scandia Name Title Date Partial Pay Estimate No.: 2 2020 STREET IMPROVEMENTS CITY OF SCANDIA, MN BMI PROJECT NO. N13.118530 WORK COMPI FTFI) THROUGH AJNF 5. 2020 1 MOBILIZATION $13,000.00 1.00 LUMP SUM $13,000.00 0.90 LUMP SUM $11,700.00 1.00 LUMP SUM $13,000.00 2 TRAFFIC CONTROL $3,700.00 1 LUMP SUM $3,700.00 0.90 LUMP SUM $3,330.00 1.00 LUMP SUM $3,700.00 3 CLEARING AND GRUBBING $1,000.00 1 LUMP SUM $1,000.00 1.00 LUMP SUM $1,000.00 1.00 LUMP SUM $1,000.00 4 SAWING BITUMINOUS PAVEMENT -FULL DEPTH $2.50 300 LIN FT $750.00 204.00 LIN FT $510.00 204.00 LIN FT $510.00 5 REMOVE BITUMINOUS DRIVEWAY PAVEMENT $3.50 600 SQ YD $2,100.00 110.00 SQ YD $385.00 110.00 SQ YD $385.00 6 REMOVE CONCRETE RUBBLE $33.25 40 CU YD $1,330.00 30.00 CU YD $997.50 30.00 CU YD $997.50 7 CLEAN PIPE CULVERT $18.001 700 LIN FT $12,600.00 276.00 LIN FT $4,968.00 276.00 LIN FT $4,968.00 8 MILL BITUMINOUS 1.5' FULL WIDTH $0.36 25800 SQ YD $9,288.00 25,800.00 SQ YD $9,288.00 25,800.00 SQ YD $9,288.00 9 BITUMINOUS RECLAMATION 8" DEEP $1.00 4600 SQ YD $4,600.00 4,600.00 SQ YD $4,600.00 4,600.00 SQ YD $4,600.00 10 COMMON EXCAVATION $51.75 120 CU YD $6,210.00 0.00 CU YD $0.00 0.00 CU YD $0.00 11 SUBGRADE EXCAVATION $51.75 250 CU YD $12,937.50 0.00 CU YD $0.00 0.00 CU YD $0.00 12 SUBGRADE PREPARATION $0.70 4500 SQ YD $3,150.00 4,600.00 SQ YD $3,220.00 4,600.00 SQ YD $3,220.00 13 AGGREGATE SHOULDERING, CLASS 5 $28.00 400 TON $11,200.00 150.00 TON $4,200.00 400.00 TON $11,200.00 14 AGGREGATE BASE, CLASS 5 $29.001 300 TON $8,700.00 20.00 TON $580.00 145.95 TON $4,232.55 15 AGGREGATE SURFACING, TRAP ROCK $45.00 100 TON $4,500.00 20.00 TON $900.00 33.88 TON $1,524.60 16 AGGREGATE SURFACING, LIMESTONE $50.00 100 TON $5,000.00 40.00 TON $2,000.00 56.31 TON $2,815.50 17 TYPE SP 9.5 WEARING COURSE MIXTURE 3,C $72.50 440 TON $31,900.00 335.00 TON $24,287.50 462.00 TON $33,495.00 18 TYPE SP 12.5 NON WEARING COURSE MIXTURE 3,C $67.75 730 TON $49,457.50 420.00 TON $28,455.00 591.95 TON $40,104.61 19 TYPE SP 9.5 WEARING COURSE MIXTURE 3,B $65.15 3100 TON $201,965.00 2,225.00 TON $144,958.75 2,891.39 TON $188,374.06 20 TYPE SP 9.5 WEARING COURSE MIXTURE 3,B - PATCHING $85.50 850 TON $72,675.00 31.90 TON $2,727.45 31.90 TON $2,727.45 21 BITUMINOUS MATERIAL FOR TACK COAT $2.351 2150 GAL $5,052.50 1,200.00 GAL $2,820.00 1,350.00 GAL $3,172.50 22 TYPE SP 9.5 UPPER WEARING COURSE MIXTURE 3,B - DRIVEWAY $90.00 150 TON $13,500.00 0.00 TON $0.00 30.00 TON $2,700.00 23 DITCH GRADING $12.15 250 LIN FT $3,037.50 620.00 LIN FT $7,533.00 620.00 LIN FT $7,533.00 24 24" CM PIPE APRON W/ TRASH GUARD FOR HDPE $1,500.00 1 EACH $1,500.00 1.00 EACH $1,500.00 1.00 EACH $1,500.00 25 CULVERT END PROTECTION/INLET PROTECTION $91.00 45 EACH $4,095.00 21.00 EACH $1,911.00 21.00 EACH $1,911.00 26 TOPSOIL BORROW $78.00 50 CU YD $3,900.00 0.00 CU YD $0.00 0.00 CU YD $0.00 27 RANDOM RIP RAP, CLASS 3 $115.00 40 CU YD $4,600.00 16.00 CU YD $1,840.00 20.50 CU YD $2,357.50 28 TURF PREPARATION WITH SEED MIX 35-241 $2.001 1500 SQ YD $3,000.00 0.00 SQ YD $0.00 422.00 SQ YD $844.00 29 EROSION CONTROL BLANKET, CATEGORY 3 $4.00 1500 SQ YD $6,000.00 0.00 SQ YD $0.00 422.00 SQ YD $1,688.00 30 4" DOUBLE YELLOW LINE, MULTI COMP $0.50 10200 LIN FT $5,100.00 0.00 LIN FT $0.00 10,179.00 LIN FT $5,089.50 TOTAL BASE BID: $505,848.00 $263,711.20 $352,937.77