Loading...
2. Capital Improvement Plan 2016-2020sip SCANDIA City of Scandia Capital. Improvement Program 2016-2020 Recommendations from Capital Improvement Committee June 3, 2015 CONTENTS Introduction Whatis a CIP?.................................................................................................................1 Scope of the Draft CIP.................................................... ...1 FundingSources..............................................................................................................2 ProjectPriorities.............................................................................................................. 2 2015-2019 CIP Amendments.............................................................................................3 2016-2020 CIP Overview StreetProjects..................................................................................................................3 Equipment Replacement Fund........................................................................................4 Project Highlights by Department...................................................................................5 CIP Summary Data Project Listing by Department (All Years)..................................................................... 9 Projects and Funding Sources, 2016 thru 2020...............................................................11 Projects and Funding Sources, 2021 thru 2025...............................................................13 2016-2020 Capital Improvement Plan, Spending by Department ..........................15 Capital Improvement Fund, Spending by Department........................................15 Debt Service Fund, Spending by Department.................................................16 Equipment Replacement Fund, Spending by Department..............................................16 General Fund, Spending by Department ............................................. .......17 Grants/Donations, Spending by Department...................................................17 Appendix Project Details, All Projects is INTRODUCTION The Capital Improvement Program (CIP) for the five-year period of 2016 through 2020 is the seventh such document prepared by the City of Scandia. It would amend the CIP included in the March, 2009 Comprehensive Plan (as amended through December 17, 2014) replacing Appendix F of the plan in its entirety. What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (typically 5 years) capital expenditure plan for a City's infrastructure (such as streets, parks and utility systems), vehicles, equipment and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process) projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPS to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a "wish -list" that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that "a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan." A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept up to date and in synch with city budgets. The primary benefit of a CIP is as a financial planning tool, to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and help the City Council sort out competing priorities. Scope of the CIP Scandia's CIP includes all capital projects that cost at least $10,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget, but would not be included in the CIP. Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Capital Improvement Fund Existing Cityfund, primarily from property tax levy, set aside for capital projects. Debt Service Fund Projects financed by borrowing, later to be repaid with property taxes, and potentially special assessments depending upon the characteristics of the project. Equipment Replacement Fund Internal service fund used to segregate funds set aside for planned replacements of existing major equipment. Funds are transferred from operating budgets (primarily property tax revenues.) The fund may also receive funds realized through debt financing. General Fund Annual operating budget, primarily funded by property tax revenues. Park Improvement Fund Existing Cityfund, receipts from cash -in -lieu of land park dedication fees paid by developers and others who subdivide their land. Local Road Improvement Fund Existing fund, funded with unrestricted fund balance and property tax revenues. To be used mainly to fund mill and overlay and other similar street construction projects. 201 Sewer Funds come from fees paid by users on the 201 Wastewater System Uptown Sewer Funds come from fees paid by users on the Uptown Wastewater System In addition to these sources, it is possible that future projects could be funded from donations, grants, user fees or other sources not listed. Projects benefiting an enterprise or utility fund could be paid from the appropriate fund. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like "apples and oranges." There is no accepted system or "industry standard" for prioritizing projects. 2 The Capital Improvement Committee developed the following priority rating system in 2008, which was also used for the 2009 and subsequent updates: Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important, high-priority projects that should be done as funding becomes available. Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4 Less important, low -priority projects; desirable but not essential. N/A Used for replacements of existing equipment. 2015-2019 CIP AMENDMENTS The 2015-2019 CIP included $36,000 in expenditures for Lilleskogen such as site improvements to be funded by grants and donations. The parking lot was anticipated to be completed in 2014, however that did not happen. The Parks and Recreation Committee and the Capital Improvement Committee are recommending an amendment to the 2015-2019 CIP to include the parking lot and clearing of invasive species at Lilleskogen for 2015. The funding source for the parking lot would be an advance of up to $35,000 from the Capital Improvement Fund to the Parks Capital Improvement Fund. The advance would be paid back over the next few years as park dedication fees came in. This was approved with the awarding of the parking lot bid by the Council on July 21, 2015. However, further discussion is needed on the clearing of invasive species as funding is not available at this time. 2016-2020 CIP OVERVIEW For 2016 through 2020, the draft CIP includes 23 separate projects with a total estimated cost of $5,261,800. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be important to refine and update costs when the plan is reviewed, especially for projects in the first year or two of the plan. Some projects beyond the five-year planning period are also included in the CIP. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 to 20 years or even more. The plan also includes "pending" projects for which timelines (and in most cases, cost estimates) have not yet been identified. As more information is developed about the need for, cost and possible funding sources for these projects, they will be included in future CIP updates. Street Projects The draft update includes the following street projects in the CIP : 3 PW -002, Street Maintenance Program. The current funding level ($330,000 per year) has been maintained, with the addition of a $900,000 project in 2016 for a reconstruction of 236th, 237th and Novak. The reconstruction would be funded by the Local Road Improvement Fund. The goal of the 2008 Pavement Management Plan was to extend the life of city streets and to reduce the lifecycle costs for maintaining them in good condition. Each year the city has endeavored to increase the budget for contractual road maintenance and repairs. In 2014 the Local Road Improvement Fund was established to address major repairs (reconstruction, mill and overlays, etc) and is funded by the general tax levy. Equipment Replacement Fund The city created the Equipment Replacement Fund in 2007 to set aside funds on an annual basis for planned replacement of vehicles and major pieces of operating equipment. The fund receives transfers from the operating budget of each department depending on its equipment needs. This allows the departmental budgets for each major function to accurately show the costs of funding that function, including equipment, while segregating the funds from the operating budgets. Any revenues from the sale of old equipment being replaced are also deposited into the fund. Beginning in 2015, the revenue to the fund was reduced significantly which will result in the need to borrow for larger purchases in future years. Just as for other capital projects, the decision whether or not to replace a particular piece of equipment, and what to replace it with, will need to be made by the City Council at the time of the purchase. The City could decide to keep some equipment longer than planned. Or, equipment could wear out more quickly than expected. It is likely that some items will not be replaced, or that new technology or equipment could alter plans to replace a particular item. In 2015, the City transferred $20,000 to the fund. The draft 2016 budget and CIP show proposed transfers of $20,000 in 2017 and subsequent years. The Capital Improvement Committee (CIC) is recommending that the transfer be suspended for 2016 since adequate cash flow is available in the fund. The chart below shows the cash flow in the Equipment Replacement Fund from 2016-2025 assuming a $20,000 per year contribution from 2017 and on. The lowest the fund balance would reach under this scenario is $35,000 in 2024 but would continue to cash flow through 2025. Because of the healthy projected fund balance, the CIC decided to establish the threshold for borrowing for projects at those over $100,000 and suspend the annual contribution in 2016. 4 $400,000 $350,000 $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 Equipment Replacment Fund 2016-2025 otic oti` otic otic oti° otiti otic otic oti°� otic' ti ti ti ti ti ti ti ti ti ti =: Total $ Replacements Funding Balance Project Highlights by Department Fire: ➢ 12-15 SCBA and 30 Masks as well as the SCBA compressor replacements remain for 2017. ➢ Fire Hall HVAC replacement has been moved from 2016 to 2020 ➢ The Chief's vehicle has been moved to pending ➢ The Civil Defense Sirens (tornado sirens) have been moved from 2019 to 2020 ➢ The second fire station has been moved to pending until further research and analysis is completed ➢ Radio replacements remain for 2018 but this is largely tied to the County's schedule for replacement ➢ A fire training structure has been moved to pending ➢ The fire hall roof replacement remains for 2019 ➢ In later years, the replacements costs have been updated for Tanker 5178 ($180,000 to $250,000) and Engine 5176 ($600,000 to $700,000) Fire Dept 2016-2020 CIP by Funding Source Parks Can Imn Fund, 0, ( Equip Replace Fund, 275,000, 61% Grants, 22,500, qw- General Fund, 20,000,5% Service, 0, 0 Capital Imp Fund, 130,000,29% General Fund Debt Service Capital Imp Fund ■ Equip Replace Fund F Parks Cap Imp Fund ■ Grants Ice Rink: The replacement of the Zamboni has been pushed back a few years to 2020, if grants/donations are obtained. The Public Works Director believes it will last longer after the maintenance performed on it these last few years. Parks and Recreation: ➢ Lilleskogen Park Restoration remains the top priority for the Parks and Recreation Committee. Assuming the 2015-2019 CIP is amended as stated previously, the recommendations have been updated for years 2016-202 Ito complete the park improvements. The wetland restoration activities in years 2016-2021 would be funded from the general levy ($13,100 over six years) and all other updates (benches, picnic shelter signage, boardwalk, etc) would be funded with grants and/or donations ($45,200). ➢ No changes were made for a full reconstruction of the tennis courts in 2018. Resurfacing was completed in 2013. Parks 2016-2020 CIP by Funding Source Grants/Donations ,85,200,54% Parks Capital Imp Fund, 0, 0% Equipment Replacement, 0, 0% General Fund General Fund, 73,100,46% Debt Service, 0, 0% Debt Service Capital Improvement Fund a Equipment Replacement n Parks Capital Imp Fund . Grants/Donations Capital Improvement Fund, 0, 0% *Note: No Park Capital Improvement Funds are projected for project costs because they would be used to pay back the $35,000 advance to the Capital Improvement Fund, approved in 2015 for parking lot completion at Lilleskogen. Public Works: ➢ The remaining Public Works projects are equipment replacements. Changes to the expected useful life and cost estimates for several items have been made but do not have a significant impact on the first 5 years of the plan from previous plans. The CIC is recommending the grader be removed from the CIP and instead continue using it until it is no longer functional or economical and then contract out for grading services. rel Public Works 2016-2020 CIP by Funding Source Local Road Imp Fund, 3,325,000, 63% General Fund, ,620,000,30% Debt Service, 200,000,4% Equipment Replacement, 167,500,3% Grants, 0, 0 Parks Cap Imp General Fund Debt Service Fund, 0, 0% Capital Improvement Fund w Equipment Replacement r Parks Cap Imp Fund % Grants Local Road Imp Fund 201 Wastewater System: ➢ Capital Improvements for the 201 Wastewater System around Big Marine Lake include updating the control panels on Bliss Lift Station 1 and 2 and the pumps on Bliss Lift Station 2 in 2017 to the new SCADA system implemented on the rest of the system in 2015. All monies would come from the fund balance in the 201 Fund. 7