Loading...
Addition - Layton Ave-Temporary Drainage Improvement OptionsLayton Ave -Temp. Drainage Improvements Option 1 - Full Depth/Mill & Overlay City of Scandia, Minnesota July 2020 SCANDIA - 9. 5 .L. NEW DRIVEWAY APRONS TO ESTABLISH POSITIVE DRAINAGE 6-0 Q Z -REMOVE TREE ror T 1 n 19126 6 REMOVE & REPLACE BITUMINOUS AND GRADE TO NEW CROSS SLOPE o� E op1u �I RECONSTRUCT SANITARY MANHOLE v Q E � E 9083 v -ft%j 19169 l 1919 MILL &OVERLAY / TO NEW CROSS / SLOPE 19151 �19135 TRANSITION FLOW TO WEST WITH 1.5% CROSS SLOPE / 19123 19107 k / 19091 19077 �r V 0 30 60 SCALE FLET ENGINEER'S ESTIMATE Layton Ave -Temporary Drainage Improvements a City of Scandia, Minnesota SCANDIA Date: July 2020 OPTION 1- FULL DEPTH/MILL & OVERLAY 1 MOBILIZATION 1 LUMP SUM $2,500.00 $2,500.00 2 CLEAR & GRUB 1 TREE $4,000.00 $4,000.00 3 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 50 SO YD $20.00 $1,000.00 4 REMOVE BITUMINOUS PAVEMENT 200 SO YD $20.00 $4,000.00 5 MILL BITUMINOUS PAVEMENT 440 SO YD $10.00 $4,400.00 6 COMMON EXCAVATION 75 CU YD $45.00 $3,375.00 7 AGGREGATE BASE, CLASS 5 100 TON $15.00 $1,500.00 8 TYPE 9.5 WEARING COURSE MIXTURE (2,B) 150 TON $110.00 $16,500.00 9 BITUMINOUS MATERIAL FOR TACK COAT 60 GAL $15.00 $900.00 10 TRAFFIC CONTROL 1 LUMP SUM $1,000.00 $1,000.00 11 RECONSTRUCT SANITARY SEWER MANHOLE 1 EACH $3,000.00 $3,000.00 12 COMMON TOPSOIL BORROW 30 CU YD $50.00 $1,500.00 13 EROSION CONTROL 1 LUMP SUM $500.00 $500.00 14 TURF RESTORATION 300 SO YD $10.00 $3,000.00 TOTAL ESTIMATED CONSTRUCTION COST -OPTION 1 -FULL DEPTH/MILL & OVERLAY: $47,175.00 Engineer's Estimate -Option 1 8/3/2020, 11:54 AM Bolton & Menk, Inc. Page 1 of 1 Layton Ave -Temporary Drainage Improvements City of Scandia, Minnesota Option 2 - Bituminous Curb July 2020 SC® 19156 1916 19146 Q L Z 7 � n �T 7 � � I V \/ V 19126 6 h O Q D MOUNTABLE BITUMINOUS —� / CURB Y \ E 19111 v 19123 19107 v � � v ry 19091 v J E 0 9083 v 19077 \l 1919 19151 19135 �I r / 1 V 0 30 60 SCALE FLET ENGINEER'S ESTIMATE Layton Ave -Temporary Drainage Improvements City of Scandia, Minnesota OPTION 2 - BITUMINOUS CURB 1 MOBILIZATION 2 TRAFFIC CONTROL 3 REMOVE BITUMINOUS PAVEMENT 4 BITUMINOUS CURB 5 BITUMINOUS MATERIAL FOR TACK COAT 6 AGGREGATE SURFACING, LIMESTONE 7 COMMON TOPSOIL BORROW 8 TURF RESTORATION * 4 SCANDIA Date: July 2020 1 LUMP SUM $1,500.00 $1,500.00 1 LUMP SUM $500.00 $500.00 40 SO YD $5.00 $200.00 107 LIN FT $45.00 $4,815.00 10 GAL $15.00 $150.00 10 TON $75.00 $750.00 10 CU YD $60.00 $600.00 50 SO YD $15.00 $750.00 TOTAL ESTIMATED CONSTRUCTION COST -OPTION 2 -BITUMINOUS CURB: $9,265.00 Engineer's Estimate -Option 2 8/3/2020,1:06 PM Bolton & Menk, Inc. Page 1 of 1