Addition - Layton Ave-Temporary Drainage Improvement OptionsLayton Ave -Temp. Drainage Improvements Option 1 - Full Depth/Mill & Overlay
City of Scandia, Minnesota July 2020 SCANDIA
- 9. 5
.L.
NEW DRIVEWAY APRONS TO
ESTABLISH POSITIVE
DRAINAGE
6-0
Q
Z -REMOVE TREE
ror
T 1
n
19126
6
REMOVE & REPLACE
BITUMINOUS AND GRADE
TO NEW CROSS SLOPE
o�
E
op1u
�I RECONSTRUCT
SANITARY
MANHOLE
v
Q
E �
E 9083 v
-ft%j 19169
l
1919
MILL &OVERLAY /
TO NEW CROSS
/ SLOPE
19151
�19135
TRANSITION FLOW TO WEST
WITH 1.5% CROSS SLOPE
/ 19123
19107
k
/ 19091
19077
�r
V
0 30 60
SCALE FLET
ENGINEER'S ESTIMATE
Layton Ave -Temporary Drainage Improvements a
City of Scandia, Minnesota SCANDIA
Date: July 2020
OPTION 1- FULL DEPTH/MILL & OVERLAY
1
MOBILIZATION
1
LUMP SUM
$2,500.00
$2,500.00
2
CLEAR & GRUB
1
TREE
$4,000.00
$4,000.00
3
REMOVE BITUMINOUS DRIVEWAY PAVEMENT
50
SO YD
$20.00
$1,000.00
4
REMOVE BITUMINOUS PAVEMENT
200
SO YD
$20.00
$4,000.00
5
MILL BITUMINOUS PAVEMENT
440
SO YD
$10.00
$4,400.00
6
COMMON EXCAVATION
75
CU YD
$45.00
$3,375.00
7
AGGREGATE BASE, CLASS 5
100
TON
$15.00
$1,500.00
8
TYPE 9.5 WEARING COURSE MIXTURE (2,B)
150
TON
$110.00
$16,500.00
9
BITUMINOUS MATERIAL FOR TACK COAT
60
GAL
$15.00
$900.00
10
TRAFFIC CONTROL
1
LUMP SUM
$1,000.00
$1,000.00
11
RECONSTRUCT SANITARY SEWER MANHOLE
1
EACH
$3,000.00
$3,000.00
12
COMMON TOPSOIL BORROW
30
CU YD
$50.00
$1,500.00
13
EROSION CONTROL
1
LUMP SUM
$500.00
$500.00
14
TURF RESTORATION
300
SO YD
$10.00
$3,000.00
TOTAL ESTIMATED CONSTRUCTION COST -OPTION 1 -FULL DEPTH/MILL & OVERLAY: $47,175.00
Engineer's Estimate -Option 1
8/3/2020, 11:54 AM Bolton & Menk, Inc. Page 1 of 1
Layton Ave -Temporary Drainage Improvements
City of Scandia, Minnesota
Option 2 - Bituminous Curb
July 2020 SC®
19156
1916
19146
Q
L
Z
7 �
n �T
7
� � I
V \/
V
19126
6
h
O
Q
D
MOUNTABLE BITUMINOUS —�
/ CURB
Y \
E 19111
v
19123
19107
v � �
v
ry
19091
v J
E
0
9083 v
19077
\l
1919
19151
19135
�I r
/ 1
V
0 30 60
SCALE FLET
ENGINEER'S ESTIMATE
Layton Ave -Temporary Drainage Improvements
City of Scandia, Minnesota
OPTION 2 - BITUMINOUS CURB
1
MOBILIZATION
2
TRAFFIC CONTROL
3
REMOVE BITUMINOUS PAVEMENT
4
BITUMINOUS CURB
5
BITUMINOUS MATERIAL FOR TACK COAT
6
AGGREGATE SURFACING, LIMESTONE
7
COMMON TOPSOIL BORROW
8
TURF RESTORATION
* 4
SCANDIA
Date: July 2020
1
LUMP SUM
$1,500.00
$1,500.00
1
LUMP SUM
$500.00
$500.00
40
SO YD
$5.00
$200.00
107
LIN FT
$45.00
$4,815.00
10
GAL
$15.00
$150.00
10
TON
$75.00
$750.00
10
CU YD
$60.00
$600.00
50
SO YD
$15.00
$750.00
TOTAL ESTIMATED CONSTRUCTION COST -OPTION 2 -BITUMINOUS CURB: $9,265.00
Engineer's Estimate -Option 2
8/3/2020,1:06 PM Bolton & Menk, Inc. Page 1 of 1