Loading...
9.h) City Council_RJG^Contractors Request for Payment No 1-Quinnell• = BOLTON8.MF:=NK, INC® Consulting Engineers & Surveyors 2035 County Road D East • Suite B • Maplewood, MN 55109-5314 Phone (651) 704-9970 • Fax (651) 704-9971 www.bolton-menk.com August 12, 2015 Honorable Mayor and City Council 14727 209`h Street N Scandia, MN 55073 RE: Contractor's Request for Payment No. 1 Quinnell Ave North Improvements Project No.: N15.109775 Dear Mayor and Council: Enclosed please find Contractor's Request for Payment No. 1 for Dresel Contracting, Inc. for the services they provided on the above referenced project. This request includes culvert replacement and ditching improvements within the project area. The bituminous pavement work and related activities remain on the project. If the Council chooses to approve a payment for this project, it would be appropriate to approve Contractor's Request for Payment No. 1 and pay $139,186.82 to Dresel Contracting, Inc. for the work performed. The request includes withholding 5% retainage. Please call me at 612-597-7140 if you have any questions or concerns regarding this Contractor's payment request. Sincerely, BOLTON & MENK, INC. 4, d , Zt— , Ryan J. Goodman, P.E. City Engineer Enclosure: Contractor's Request for Payment No. 1 DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer Date: 3-Aug-15 PUBLICLY BID CONTRACTOR'S PAY REQUEST Quinnell Avenue North and Lilleskogen Park Improvements Pay Request No. 1 City Project No. N15.109775 City of Scandia, MN For Period Ending: 28-Jul-15 Original Contract Amount $649,962.46 Approved Change Orders - Addition ($44,772.80) Approved Change Orders - Deduction $0.00 Revised Contract Amount $605,189.66 Completed Work to Date $146,512.44 Stored Materials on Hand $0.00 Sub-Total $146,512.44 Retained Percentage 5% $7,325.62 Liquidated Damages $0.00 Total 1 $139,186.82 Total Amount Paid on Previous Estimates $0.00 Amount Due Contractor This Pay Request $139,186.82 Approved for Payment: Dresel Contracting, Inc. Signature Date 24044 July Avenue Chisago City, MN 55013 Printed Name and Title Checked and Approved as to Quantities and Amount: Signature Date Bolton & Menk, Inc. 2035 County Road D East, Suite B Maplewood, MN 55109 Printed Name and Title Approved for Payment: City of Scandia Name Title Date Partial Pay Estimate No.: QUINNELL AVENUE NORTH AND LILLESKOGEN PARK IMPROVEMENTS CITY OF SCANDIA, MN BMI PROJECT NO. N15.109775 WORK COMPLETED THROUGH JULY 29, 2015 ITEM NO. ITEM UNIT PRICE AS BID PREVIOUS ESTIMATE COMPLETED TO DATE ESTIMATED QUANTITY ESTIMATED ESTIMATED AMOUNT QUANTITY ESTIMATED AMOUNT ESTIMATED QUANTITY ESTIMATED AMOUNT BASE BID PART 1- STREET IMPROVEMENTS 1 MOBILIZATION $28,440.00 1.00 LS $28,440.00 0 LS $0.00 1 LS $28,440.00 2 TRAFFIC CONTROL $5,940.00 1.00 LS $5,940.00 0 LS $0.00 1 LS $5,940.00 3 COMMON EXCAVATION EV - DITCHING $18.19 1310.00 CY $23,828.90 0 CY $0.00 454 CY $8,258.26 4 SAWING BITUMINOUS PAVEMENT -FULL DEPTH $2.37 210.00 LF $497.70 0 LF $0.00 210 LF $497.70 5 BITUMINOUS PAVEMENT RECLAMATION P $0.54 16700.00 SY $9,018.00 0 SY $0.00 0 SY $0.00 6 REMOVE SIGN $17.71 21.00 EA $371.91 0 EA $0.00 0 EA $0.00 7 REMOVE FENCE $2.43 230.00 LF $558.90 0 LF $0.00 0 LF $0.00 8 TEMPORARY MAILBOX $46.32 25.00 EA $1,158.00 0 EA $0.00 0 EA $0.00 9 SALVAGE AND REINSTALL MAILBOX $74.40 25.00 EA $1,860.00 0 EA $0.00 0 EA $0.00 10 REMOVE BITUMINOUS PAVEMENT $2.27 600.00 SY $1,362.00 0 SY $0.00 300 SY $681.00 11 SUBGRADE PREPARATION $0.61 18310.00 SY $11,169.10 0 SY $0.00 0 SY $0.00 12 SUBGRADE EXCAVATION $16.17 1800.00 CY $29,106.00 0 CY $0.00 486 CY $7,858.62 13 AGGREGATE BASE, CLASS 5 $13.31 1100.00 TN $14,641.00 0 TN $0.00 1401 TN $18,647.31 14 AGGREGATE SHOULDERING $22.00 700.00 TN $15,400.00 0 TN $0.00 0 TN $0.00 15 BITUMINOUS MATERIAL FOR TACK COAT $3.30 1250.00 GAL $4,125.00 0 GAL $0.00 0 GAL $0.00 16 TYPE SP 9.5 WEARING COURSE MIXTURE 3,C $70.93 4700.00 TN $333,371.00 0 TN $0.00 0 TN $0.00 17 RAILROAD CROSSING APRON $5,400.00 1.00 LS $5,400.00 0 LS $0.00 0 LS $0.00 18 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) -DRIVEWAY $135.60 75.00 TN $10,170.00 0 TN $0.00 0 TN $0.00 19 AGGREGATE SURFACING, CLASS 5 - DRIVEWAY $18.11 225.00 TN $4,074.75 0 TN $0.00 0 TN $0.00 20 CLEARING AND GRUBBING $3,000.00 1.00 LS $3,000.00 0 LS $0.00 1 LS $3,000.00 21 COMMON TOPSOIL BORROW LV $19.65 1740.00 CY $34,191.00 0 CY $0.00 447 CY $8,783.55 22 SILT FENCE $3.29 890.00 LF $2,928.10 0 LF $0.00 0 LF $0.00 23 INLET PROTECTION $120.00 5.00 EA $600.00 0 EA $0.00 11 EA $1,320.00 24 EROSION CONTROL BLANKET $2.40 1320.00 SY $3,168.00 0 SY $0.00 4004 SY $9,609.60 25 ANCHOR REINFORCED VEGETATION SYSTEM ARVS $39.30 120.00 SY $4,716.00 0 SY $0.00 0 SY $0.00 26 HYDRAULIC MATRIX TYPE HYDRAULIC MULCH $0.60 13550.00 SY $8,130.00 0 SY $0.00 0 SY $0.00 27 SEED MIXTURE 25-131 $2.40 930.00 LB $2,232.00 0 LB $0.00 150 LB $360.00 28 SEDIMENT CONTROL LOG $3.60 630.00 LF $2,268.00 0 LF $0.00 250 LF $900.00 29 STREET SWEEPER WITH PICKUP BROOM WITH OPERATOR $180.00 7.00 HR $1,260.00 0 HR $0.00 0 HR $0.00 30 4" DOUBLE SOLID LINE, YELLOW EPDXY 1 $0.56 7100.00 LF $3,976 ' 001 0 LF $0.001 0 LF $0.00 31 24" STOP BAR, WHITE EPDXY 1 $9.361 90.00 LF $842.40 0 LF $0.001 0 LF $0.00 32 PAVEMENT MESSAGE RR XING - WHITE EPDXY 1 $566.501 2.00 EA $1,133.001 0 EA $0.001 0 EA $0.00 TOTAL PART 1 - STREET IMPROVEMENTS COST: $568,936.76 $0.00 $94,296.04 PART 2 - STORM SEWER IMPROVEMENTS 33 REMOVE STORM SEWER PIPE $9.56 320.00 LF $3,059.20 0 LF $0.001 320 LF $3,059.20 34 IMPROVED PIPE FOUNDATION $8.00 150.00 LF $1,200.00 0 LF $0.00 150 LF $1,200.00 35 6" PVC PIPE, SDR 26 $29.10 120.00 LF $3,492.00 0 LF $0.00 0 LF $0.00 36 6" PVC PERFORATED PIPE, SDR 26, INCL ROCK & FABRIC $34.17 690.00 LF $23,577.30 0 LF $0.00 0 LF $0.00 37 6" PVC CLEAN OUT $435.00 4.00 EA $1,740.00 0 EA $0.00 0 EA $0.00 38 18" RC PIPE CULVERT, CL 5 $105.86 56.00 LF $5,928.16 0 LF $0.00 56 LF $5,928.16 39 24" RC PIPE CULVERT, CL 4 $178.50 48.00 LF $8,568.00 0 LF $0.00 48 LF $8,568.00 40 18" RC PIPE APRON $1,347.00 4.00 EA $5,388.00 0 EA $0.00 4 EA $5,388.00 41 24" RC PIPE APRON $1,218.00 2.00 EA $2,436.00 0 EA $0.00 2 EA $2,436.00 42 15" CMP PIPE CULVERT - DRIVEWAY $39.94 350.00 LF $13,979.00 0 LF $0.00 350 LF $13,979.00 43 15" GALVANIZED STEEL PIPE APRON 1 $291.821 22.00 EA $6,420.041 0 EA $0.001 22 EA $6,420.04 44 RANDOM RIP RAP, CLASS III 1 $87.301 60.00 CY $5,238.001 0 CY $0.001 60 CY $5,238.00 TOTAL PART 2 - STORM SEWER IMPROVEMENTS: $81,025.70 $0.00 $52,216.40 TOTAL BASE BID: $649,962.46 $0.00 $146,512.44 CHANGE ORDER NO. 1 PART 1 -DEDUCT 1 AGGREGATE SHOULDERING 1 $22.00 -350.00 TN -$7,700.001 0 TN $0.001 0 TN $0.00 2 COMMON TOPSOIL BORROW LV $19.65 -390.00 CY -$7,663.501 0 CY $0.001 0 CY $0.00 3 INLET PROTECTION 1 $120.00 -5.00 EA -$600.001 0 EA $0.001 0 EA $0.00 TOTAL PART 1 - DEDUCT: -$15,963.50 $0.00 $0.00 PART 2 -DEDUCT 1 AGGREGATE SHOULDERING 1 $29.10 -120.00 LF -$3,492.001 0 LF $0.001 0 LF $0.00 2 COMMON TOPSOIL BORROW LV $34.17 -690.00 LF -$23,577.301 0 LF $0.001 0 LF $0.00 3 INLET PROTECTION 1 $435.00 -4.00 EA -$1,740.001 0 EA $0.001 0 EA $0.00 TOTAL PART 2 - DEDUCT: -$28,809.30 $0.00 $0.00 TOTAL CHANGE ORDER NO. 1: -$44,772.80 $0.00 $0.00 TOTAL BASE BID PLUS CHANGE ORDER NO. 1: $605,189.66 $0.00 $146,512.44