Loading...
5.g) Contractors Request for Payment No 2• = B+CD L—TC:>N & M F= N i < , i NC® Consulting Engineers & Surveyors " 2035 County Road D East • Suite B • Maplewood, MN 55109-5314 Phone (651) 704-9970 • Fax (651) 704-9971 www,bolton-menk.com September 10, 2015 Honorable Mayor and City Council 14727 209th Street N Scandia, MN 55073 RE: Contractor's Request for Payment No. 2 Quinnell Ave North Improvements Project No.: N15.109775 Dear Mayor and Council: Enclosed please find Contractor's Request for Payment No. 2 for Dresel Contracting, Inc. for the services they provided on the above referenced project. This request includes ditching, milling, bituminous pavement, and other related items. The railroad striping, final restoration, removal of erosion control devices, and punch list items remain on the project. If the Council chooses to approve a payment for this project, it would be appropriate to approve Contractor's Request for Payment No. 2 and pay $325,892.03 to Dresel Contracting, Inc. for the work performed. The request includes withholding 5% retainage. Please call me at 612-597-7140 if you have any questions or concerns regarding this Contractor's payment request. Sincerely, Ryan J. Goodman, P.E. City Engineer Enclosure: Contractor's Request for Payment No. 2 DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer Date: 8-Sep-15 PUBLICLY BID CONTRACTOR'S PAY REQUEST Quinnell Avenue North and Lilleskogen Park Improvements Pay Request No. 2 City Project No. N15.109775 City of Scandia, MN For Period Ending: 31-Aug-15 Original Contract Amount $649,962.46 Approved Change Orders - Addition ($116,371.05) Approved Change Orders - Deduction $0.00 Revised Contract Amount $533,591.41 Completed Work to Date $489,556.69 Stored Materials on Hand $0.00 Sub -Total $489,556.69 Retained Percentage 5% $24,477.83 Liquidated Damages $0.00 Total $465,078.85 Total Amount Paid on Previous Estimates $139,186.82 Amount Due Contractor This Pay Request $325,892.03 Approved for Payment: Dresel Contracting, Inc. Signature Date 14044 July Avenue Chisago City, MN 55013 Printed Name and Title Checked and Approved as to Quantities and Amount: Signature Date Bolton & Menk, Inc. 1035 County Road D East, Suite B Maplewood, MN 55109 Printed Name and Title Approved for Payment: City of Scandia Name Title Date Partial Pay Estimate No.: QUINNELL AVENUE NORTH AND LILLESKOGEN PARK IMPROVEMENTS CITY OF SCANDIA, MN BMI PROJECT NO. N15.109775 WORK COMPLETED THROUGH AUGUST 31. 2015 ITEM NO. ITEM UNIT PRICE AS BID PREVIOUS ESTIMATE COMPLETED TO DATE ESTIMATED QUANTITY ESTIMATED AMOUNT ESTIMATED QUANTITY ESTIMATED AMOUNT ESTIMATED QUANTITY ESTIMATED AMOUNT BASE BID PART 1- STREET IMPROVEMENTS 1 MOBILIZATION $28,440.00 1.00 LS $28,440.00 1 LS $28,440.00 1 LS $28,440.00 2 TRAFFIC CONTROL $5,940.00 1.00 LS $5,940.00 1 LS $5,940.00 1 LS $5,940.00 3 COMMON EXCAVATION EV - DITCHING $18.19 1310.00 CY $23,828.90 454 CY $8,258.26 1311 CY $23,847.09 4 SAWING BITUMINOUS PAVEMENT -FULL DEPTH $2.37 210.00 LF $497.70 210 LF $497.70 473 LF $1,121.01 5 BITUMINOUS PAVEMENT RECLAMATION P $0.54 16700.00 SY $9,018.00 0 SY $0.00 0 SY $0.00 6 REMOVE SIGN $17.71 21.00 EA $371.91 0 EA $0.00 0 EA $0.00 7 REMOVE FENCE $2.43 230.00 LF $558.90 0 LF $0.00 60 LF $145.80 8 TEMPORARY MAILBOX $46.32 25.00 EA $1,158.00 0 EA $0.00 0 EA $0.00 9 SALVAGE AND REINSTALL MAILBOX $74.40 25.00 EA $1,860.00 0 EA $0.00 0 EA $0.00 10 REMOVE BITUMINOUS PAVEMENT $2.27 600.00 SY $1,362.00 300 SY $681.00 1277 SY $2,898.79 11 SUBGRADE PREPARATION $0.61 18310.00 SY $11,169.10 0 SY $0.00 977 SY $595.97 12 SUBGRADE EXCAVATION $16.17 1800.00 CY $29,106.00 486 CY $7,858.62 982 CY $15,878.94 13 AGGREGATE BASE, CLASS 5 $13.31 1100.00 TN $14,641.00 1401 TN $18,647.31 1829 TN $24,343.99 14 AGGREGATE SHOULDERING $22.00 700.00 TN $15,400.00 0 TN $0.00 0 TN $0.00 15 BITUMINOUS MATERIAL FOR TACK COAT $3.30 1250.00 GAL $4,125.00 0 GAL $0.00 450 GAL $1,485.00 16 TYPE SP 9.5 WEARING COURSE MIXTURE 3,C $70.93 4700.00 TN $333,371.00 0 TN $0.00 0 TN $0.00 17 RAILROAD CROSSING APRON $5,400.00 1.00 LS $5,400.00 0 LS $0.00 1 LS $5,400.00 18 TYPE SP 9.5 WEARING COURSE MIXTURE 3,C -DRIVEWAY $135.60 75.00 TN $10,170.00 0 TN $0.00 0 TN $0.00 19 AGGREGATE SURFACING, CLASS 5 - DRIVEWAY $18.11 225.00 TN $4,074.75 0 TN $0.00 80 TN $1,448.80 20 CLEARING AND GRUBBING $3,000.00 1.00 LS $3,000.00 1 LS $3,000.00 1 LS $3,000.00 21 COMMON TOPSOIL BORROW LV $19.65 1740.00 CY $34,191.00 447 CY $8,783.55 912 CY $17,920.80 22 SILT FENCE $3.29 890.00 LF $2,928.10 0 LF $0.00 0 LF $0.00 23 INLET PROTECTION $120.00 5.00 EA $600.00 11 EA $1,320.00 11 EA $1,320.00 24 EROSION CONTROL BLANKET $2.40 1320.00 SY $3,168.00 4004 SY $9,609.60 4004 SY $9,609.60 25 ANCHOR REINFORCED VEGETATION SYSTEM ARVS $39.30 120.00 SY $4,716.00 0 SY $0.00 0 SY $0.00 26 HYDRAULIC MATRIX TYPE HYDRAULIC MULCH $0.60 13550.00 SY $8,130.00 0 SY $0.00 0 SY $0.00 27 SEED MIXTURE 25-131 $2.40 930.00 LB $2,232.00 150 LB $360.00 175 LB $420.00 28 SEDIMENT CONTROL LOG $3.60 630.00 LF $2,268.00 250 LF $900.00 250 LF $900.00 29 STREET SWEEPER WITH PICKUP BROOM WITH OPERATOR $180.00 7.00 HR $1,260.00 0 HR $0.00 18 HR $3,240.00 30 4" DOUBLE SOLID LINE, YELLOW EPDXY $0.56 7100.00 LF $3,976.001 0 LF $0.00 0 LF $0.00 31 24" STOP BAR, WHITE EPDXY $9.36 90.00 LF $842.40 0 LF $0.00 0 LF $0.00 32 PAVEMENT MESSAGE RR XING - WHITE EPDXY $566.501 2.00 EA $1,133.001 0 EA $0.001 0 EA $0.00 TOTAL PART 1 - STREET IMPROVEMENTS COST: $568,936.76 $94,296.04 $147,955.79 PART 2 - STORM SEWER IMPROVEMENTS 33 REMOVE STORM SEWER PIPE $9.561 320.00 LF $3,059.20 320 LF $3,059.20 320 LF $3,059.20 34 IMPROVED PIPE FOUNDATION 1 $8.00 150.00 LF $1,200.00 150 LF $1,200.00 150 LF $1,200.00 35 6" PVC PIPE, SDR 26 1 $29.101 120.00 LF $3,492.001 0 LF $0.001 0 LF $0.00 36 6" PVC PERFORATED PIPE, SDR 26, INCL ROCK & FABRIC $34.17 690.00 LF $23,577.30 0 LF $0.00 0 LF $0.00 37 6" PVC CLEAN OUT $435.00 4.00 EA $1,740.00 0 EA $0.00 0 EA $0.00 38 18" RC PIPE CULVERT, CL 5 $105.86 56.00 LF $5,928.16 56 LF $5,928.16 56 LF $5,928.16 39 24" RC PIPE CULVERT, CL 4 $178.50 48.00 LF $8,568.00 48 LF $8,568.00 48 LF $8,568.00 40 18" RC PIPE APRON $1,347.00 4.00 EA $5,388.00 4 EA $5,388.00 4 EA $5,388.00 41 24" RC PIPE APRON $1,218.00 2.00 EA $2,436.00 2 EA $2,436.00 2 EA $2,436.00 42 15" CMP PIPE CULVERT - DRIVEWAY $39.94 350.00 LF $13,979.00 350 LF $13,979.00 350 LF $13,979.00 43 15" GALVANIZED STEEL PIPE APRON $291.82 22.00 EA $6,420.041 22 EA $6,420.04 22 EA $6,420.04 44 RANDOM RIP RAP, CLASS III $87.30 60.00 CY $5,238.001 60 CY $5,238.00 60 CY $5,238.00 TOTAL PART 2 - STORM SEWER IMPROVEMENTS: $81,025.70 $52,216.40 $52,216.40 TOTAL BASE BID: $649,962.46 $146,512.44 $200,172.19 CHANGE ORDER NO. 1 PART1-DEDUCT 1 AGGREGATE SHOULDERING $22.00 -350.00 TN -$7,700.001 0 TN $0.00 0 TN $0.00 2 COMMON TOPSOIL BORROW LV $19.65 -390.00 CY -$7,663.501 0 CY $0.00 0 CY $0.00 3 INLET PROTECTION 1 $120.00 -5.00 EA -$600.001 0 EA $0.00 0 EA $0.00 TOTAL PART 1 - DEDUCT: -$15,963.50 $0.00 $0.00 PART 2-DEDUCT 1 AGGREGATE SHOULDERING $29.10 -120.00 LF -$3.492.001 0 LF $0.001 0 LF $0.00 2 COMMON TOPSOIL BORROW LV $34.17 -690.00 LF -$23,577.301 0 LF $0.001 0 LF $0.00 3 INLET PROTECTION 1 $435.00 -4.00 EA -$1,740.001 0 EA $0.001 0 EA $0.00 TOTAL PART 2 - DEDUCT: -$28,809.30 $0.00 $0.00 TOTAL CHANGE ORDER NO. 1: -$44,772.80 $0.00 $0.00 TOTAL BASE BID PLUS CHANGE ORDER NO. 1: $605,189.66 $146,512.44 $200,172.19 CHANGE ORDER NO.2 1 AGGREGATE SHOULDERING $22.00 -350.00 TN -$7,700.00 0 TN 0.00 0 TN 0.00 2 MILL BITUMINOUS PAVEMENT (2.5" DEEP) $1.95 16700.00 SY $32,565.00 0 SY 0.00 17112 SY 33,368.40 3 MOBILIZATION - RECLAIM $1,500.00 1.00 LS $1,500.00 0 LS 0.00 1 LS 1,500.00 4 TYPE SP 9.5 WEARING COURSE MIXTURE (3, C) $70.93 -4700.00 TN -$333,371.00 0 TN 0.00 0 TN 0.00 5 TYPE SP 9.5 WEARING COURSE MIXTURE (3, C)- DRIVEWAY $135.60 -75.00 TN -$10,170.00 0 TN 0.00 0 TN 0.00 6 TYPE SP 9.5 WEARING COURSE MIXTURE (3, B) $69.77 3100.00 TN $216,287.00 0 TN 0.00 3123.92 TN 217,955.90 7 TYPE SP 9.5 WEARING COURSE MIXTURE (3, B)- DRIVEWAY $116.57 75.00 TN $8,742.75 0 TN 0.00 60 TN 6,994.20 8 BITUMINOUS PAVEMENT RECLAIMATION $0.54 -16700.00 SY -$9,018.00 0 SY 0.00 0 SY 0.00 9 BITUMINOUS PATCHING (3" THICK) $42.72 300.00 SY $12,816.00 0 SY 0.00 300 SY 12,816.00 10 RELOCATE AGGREGATE BASE CLASS 5 $6,900.00 1.00 LS $6,900.00 0 LS 0.00 1 LS 6,900.00 11 CULVERT SURFACE REPAIRS $9,850.00 1.00 LS $9,850.00 0 LS 0.00 1 LS 9,850.00 TOTAL CHANGE ORDER NO. 2: -$71,598.25 0.00 289,384.50 TOTAL CHANGE ORDER NO. 1 & 2: -$116,371.05 0.00 289,384.50 TOTAL BASE BID PLUS CHANGE ORDER NO. 1 & 2: $533,591.41 $146,512.44 $489,556.69