8.d) 2015-9-15 Engineering Updatesm �r �17 • 1 • �O"ers & SoN�o m i n n e s o t a City of Scandia Engineering Updates 9/15/2015 Engineering • Quinnell Ave Street Improvements — All paving work has been completed. Remaining project work includes striping for the railroad crossing pavement markings, final restoration, removal of erosion control devices, and final punch list items. • Lilleskogen Parking Lot - All concrete work and paving work has been completed. Remaining work includes parking lot striping. • 2015 Seal Coat Project — Second sweeping has been completed along with the double yellow centerline striping. Double yellow striping has be completed on 230th Street N, 228th Street N, and 238th Street N. Remaining work includes solid white striping in the City Hall Parking Lot. • Ditching project along Pilar has started. Anticipated work will be completed by the end of the month. • Watershed District has completed requested changes to the construction plans for the 1971h Ravine Stabilization Project that includes deposit removals within the degraded wetland. This area is also known as dinosaur hill. • MnDOT— Hwy 97 updates: ➢ Pavement (Micro Seal) —has been completed ➢ Sign Replacements —This work is well underway and completed shortly. ➢ Mumble Strips — This project will be let on August 28, 2015, with construction anticipated to start October 1st and completed the same month. • On Friday, September 11th I will be attending a Workshop on New Water Efficiency Grant Program supported by the Clean Water Fund.