Loading...
6.a Layton Ave-Temporary Drainage Improvement Options19091 19159 19156 19135 19151 19083 19107 19111 19123 19126 1918919166 19067 19077 19146 19169 19201 CLVT CLVT CLVT CLVT CLVT TILE C CLVT CLVT S C S CLVT CLVT CLVT CLVT C CLVT CLVT OEOEOEOEOEOEOEOEOEOE>>OUOUOUOUOUOUOUOUOUOU||||>>>>>>>>>>||||||||||||||||||||||||||||REMOVE TREE TRANSITION FLOW TO WEST WITH 1.5% CROSS SLOPE NEW DRIVEWAY APRONS TO ESTABLISH POSITIVE DRAINAGE REMOVE & REPLACE BITUMINOUS AND GRADE TO NEW CROSS SLOPE Layton Ave NLarkspur Ave NRECONSTRUCT SANITARY MANHOLE MILL & OVERLAY TO NEW CROSS SLOPE H:\SCND\N15106565\Capital Improvement Plan - CIP\Layton Ave - Temporary Drainage Improvements\CAD\FIGURE-106565-Option 1.dwg 7/31/2020 11:59:25 AMLayton Ave-Temp. Drainage Improvements City of Scandia, Minnesota Option 1 - Full Depth/Mill & Overlay July 2020 R FEETSCALE 0 30 60 ENGINEER'S ESTIMATE Layton Ave-Temporary Drainage Improvements City of Scandia, Minnesota Date:July 2020 OPTION 1 - FULL DEPTH/MILL & OVERLAY 1 MOBILIZATION 1 LUMP SUM $2,500.00 $2,500.00 2 CLEAR & GRUB 1 TREE $4,000.00 $4,000.00 3 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 50 SQ YD $20.00 $1,000.00 4 REMOVE BITUMINOUS PAVEMENT 200 SQ YD $20.00 $4,000.00 5 MILL BITUMINOUS PAVEMENT 440 SQ YD $10.00 $4,400.00 6 COMMON EXCAVATION 75 CU YD $45.00 $3,375.00 7 AGGREGATE BASE, CLASS 5 100 TON $15.00 $1,500.00 8 TYPE 9.5 WEARING COURSE MIXTURE (2,B)150 TON $110.00 $16,500.00 9 BITUMINOUS MATERIAL FOR TACK COAT 60 GAL $15.00 $900.00 10 TRAFFIC CONTROL 1 LUMP SUM $1,000.00 $1,000.00 11 RECONSTRUCT SANITARY SEWER MANHOLE 1 EACH $3,000.00 $3,000.00 12 COMMON TOPSOIL BORROW 30 CU YD $50.00 $1,500.00 13 EROSION CONTROL 1 LUMP SUM $500.00 $500.00 14 TURF RESTORATION 300 SQ YD $10.00 $3,000.00 TOTAL ESTIMATED CONSTRUCTION COST-OPTION 1-FULL DEPTH/MILL & OVERLAY:$47,175.00 Total AmountItem No.Item Estimated Quantity Unit Unit PriceNotes 8/3/2020, 11:54 AM Engineer's Estimate-Option 1 Bolton & Menk, Inc.Page 1 of 1 19091 19159 19156 19135 19151 19083 19107 19111 19123 19126 1918919166 19067 19077 19146 19169 19201 CLVT CLVT CLVT CLVT CLVT TILE C CLVT CLVT S C S CLVT CLVT CLVT CLVT C CLVT CLVT OEOEOEOEOEOEOEOEOEOE>>OUOUOUOUOUOUOUOUOUOU||||>>>>>>>>>>||||||||||||||||||||||||||||MOUNTABLE BITUMINOUS CURB Layton Ave NLarkspur Ave NH:\SCND\N15106565\Capital Improvement Plan - CIP\Layton Ave - Temporary Drainage Improvements\CAD\FIGURE-106565-Option 3.dwg 7/31/2020 11:49:34 AMLayton Ave-Temporary Drainage Improvements City of Scandia, Minnesota Option 2 - Bituminous Curb July 2020 R FEETSCALE 0 30 60 ENGINEER'S ESTIMATE Layton Ave-Temporary Drainage Improvements City of Scandia, Minnesota Date:July 2020 OPTION 2 - BITUMINOUS CURB 1 MOBILIZATION 1 LUMP SUM $1,500.00 $1,500.00 2 TRAFFIC CONTROL 1 LUMP SUM $500.00 $500.00 3 REMOVE BITUMINOUS PAVEMENT 40 SQ YD $5.00 $200.00 4 BITUMINOUS CURB 107 LIN FT $45.00 $4,815.00 5 BITUMINOUS MATERIAL FOR TACK COAT 10 GAL $15.00 $150.00 6 AGGREGATE SURFACING, LIMESTONE 10 TON $75.00 $750.00 7 COMMON TOPSOIL BORROW 10 CU YD $60.00 $600.00 8 TURF RESTORATION 50 SQ YD $15.00 $750.00 TOTAL ESTIMATED CONSTRUCTION COST-OPTION 2-BITUMINOUS CURB:$9,265.00 Total AmountItem No.Item Notes Estimated Quantity Unit Unit Price 8/3/2020, 1:06 PM Engineer's Estimate-Option 2 Bolton & Menk, Inc.Page 1 of 1