Loading...
5. Swenson_Draft CMSCWD Permit 20-021CARNELIAN -MARINE -ST. CROIX WATERSHED DISTRICT PERMIT 20-021 Permission is hereby granted to do the work proposed at 18590 Norell Ave N, Scandia, in application number CMSCWD 20-021, a copy of which is attached, in accordance with the rules and Plan of the District; subject to the following provisions: Stipulations: 1. Contact information for the responsible erosion control contractor/site manager must be provided to the District Administrator prior to initiating work. 2. Notify District Administrator after erosion control is installed but prior to sta rt of construction. 3. All work shall be in accordance with the approved design, plans, computations and specifications on file with the Carnelian-Marine- St. Croix Watershed District and any stipulations identified in this permit. Any proposed revision to grading, drainage, landscaping and erosion control plans shall be submitted to the District for prior approval. 4. Applicant shall not alter or disturb the existing shoreline of Big Marine Lake. 5. Applicant is responsible for obtaining all other required permits and approvals for construction of proposed project. 6. Install and maintain silt fence down-gradient from all proposed disturbed soil prior to start of any construction. 7. Upon approval by the District of the draft maintenance agreement and buffer declaration, the document shall be executed and recorded at the County on the deed. Submit certified copies to the District within 60 days of notice of District approval of draft agreements. 8. Stabilization must be initiated immediately to limit soil erosion on any porti on of the site when construction activity has permanently ceased or will not resume for a period exceeding fourteen (14) calendar days. Stabilization must be completed no later than fourteen (14) calendar days after the construction activity in that portion of the site has ceased. Stabilization must be completed no later than twenty-four (24) hours after the construction activity has ceased in that portion of the site within two hundred (200) lineal feet of and draining to a wetland, waterbody, a discernable surface drainage feature or a stormwater system inlet. 9. Notify District Administrator after completion of work for final inspection and return of surety. Findings: CARNELIAN -MARINE -ST. CROIX WATERSHED DISTRICT PERMIT 20-021 1. Description – The proposed project entails expanding an existing cabin into a year-round residence, and constructing a new driveway and garage at 18590 Norell Ave N, resulting in 1,328 SF of new impervious surface for a total of 4,949 SF (24.97%) of impervious on site. 2. Stormwater Management – Based on the amount of new impervious surface, 199 CF of stormwater storage is required. The proposed stormwater management plan includes a turf infiltration area covering approximately 1,100 SF, with 440 CF of storage satisfying District stormwater management criteria. This turf area will be amended with 2-inches of compost tilled 6-inches deep. The proposed driveway and cabin additions are noted to be sloped to direct runoff to this infiltration area. A proposed berm (944.0) along the south property line directs runoff to Big Marine Lake away from the adjacent lot. 3. Erosion & Sediment Control – An acceptable erosion and sediment control plan has been provided. 4. Buffers – In order to implement the proposed plan, Scandia would need to approve a variance from its shoreland ordinance for shoreline setback therefore the District’s Buffer Rule applies. Big Marine Lake is a Groundwater-Dependent Natural Resource, requiring a 100-foot buffer. However, Rule 4.9.4 (exception for nonconforming setback) reduces buffer width to a minimum of 10-feet (50% of the existing distance between the structure and the OHWL (942.2)). If the variance is approved by Scandia, the District will require a buffer and recorded buffer declaration. The proposed lake buffer area on the Certificate of Survey satisfies District Rules. 5. Floodplain – The lowest proposed low floor elevation (new garage; 944.9) meets District 2- foot separation from the 100-year flood elevation of Big Marine Lake (942.5). 6. Wetlands – Big Marine Lake is considered a Manage 2 wetland. No proposed activities disturb the wetland; District Rule 8.0 does not apply. The CMSCWD Board conditionally approved this application at their August 12, 2020 Board meeting. The Board reserves the right to review and revise these special provisions as circumstances may require. This permit may be suspended for failure to comply with the above stated provisions. Notification to the Board is required upon project completion. Please reference the above application number. Approved______________________ __________________________________ Date Administrator Carnelian-Marine-St. Croix Watershed District Accepted_________________________________ Property Owner