5. b Public Works Report
PW Staff report: November 2020 report 12-9-20
To: PRC
From: Director of Public Works – Adam Hawkinson
Lilleskogen:
The park sign design that was proposed by the Tourism Committee was ordered. Staff will look into
post alternatives per their guidelines. The posts and laterals for the cedar fence was installed to
redirect the public to use the bridge on the west end of the park.
Warming House / Rinks:
Staff has rolled the open rink area once so far to push the frost into the ground. On nights where it
gets down to the teens, the process will continue so positive results can be achieved when flooding
begins. So far no applicants for the rink maintenance postion.
Bike Fix-It station and bike racks were removed and put in shelter for the winter. Heat and water
softener were re-activated in the warming house.
Hay Lake & Monument:
Soil around the walk at Hay Lake was roughed-in for this fall. Final grading and seeding will occur in
the spring of 2021.