Loading...
8.f) Public Work October Activity ReportOctober Activity Report, Public Works Department Except for a couple of signs that we have had to hold off on, we have completed installing the new street signs in place. Now we have begun removing all the old signs. We will than haul them away for scrap. Due to the new policy from MNDOT, we were also able to relocate many of the I.D. sign on County 97 and Manning Road. We have completed all the Ditch mowing for the season Throughout the city Septic tanks that were on a list to be pumped this season due to high levels of sludge have been completed. This year, (every 3 years) the city was required to turn in water samples measuring the lead and copper levels from various taps around the city. This was done and sent to Pace Analytical in Virginia, Minnesota. We are still doing some land leveling and grooming at Lillyskogen Park. We have done a grading on Pilar and Paris Avenue since the ditching was completed for the season. I would like to get one more grading in before the winter freeze. Williams has completed an online course through the University of Minnesota on Gravel Road Maintenance and Design. The new SCADA system has been working well. All Public Works employees have the systems App installed in their phone. They have also learned how to use the Phone system in case of a situation. Public Works has only had to deal with 2 small trees and 1 pump on a septic system. It has been repaired and functioning properly. Thank You Dave Williams, Director of Public Works 14727 209" St. N., Scandia, Minnesota 55073 Phone (651) 433-2274 Fax (651) 433-5112 http://www.ci.scandia.mn.us