8a. Staub Cabin Remodelf,
M
M
z
LU
0
z
z
�9
Staub Cabin Demolition Notes:
All items described as removed must also be disposed of off site unless it is possible to donate for recyclingwhich
is preferred when possible.
1. Remove wall finishes, mechanicals and studs.
2. Remove wall finishes, insulation, and mechanicals to studs.
3. Remove wood rail.
4. Remove vanity, sink and faucet.
5. Remove toilet and retain for re -install.
6. Remove patio door and make ready for new door.
7. Remove cabinets and mechanicals.
8. Remove door, side -light and jamb.
9. Remove door and jamb.
10. Remove sheet fiber material between rafter to the under side of the roof sheathing.
11. Remove wall finishes, insulation, and mechanicals.
12. Remove floor materials to the floor sheathing. Repair or replace floor sheathing if required.
13. Remove floor materials completely to expose floor joists and crawlspace. Verify crawlspace condition. of
required, excavate by hand the crawlspace to an extent necessary to insulate and seal the floor and
perimeter of the crawlspace.
0
INDEX
1. EXISTING CONDITIONS / DEMOLITION NOTES
2. FOUNDATION PLAN / DEMOLITION NOTES
3. MAIN FLND LOFT PLANS
4. EXTERIOR ELEVATIONS
5. EXTERIOR ELEVATIONS
6. BUILDING SECTION / INTERIOR ELEVATIONS
7. BUILDING SECTION / INTERIOR ELEVATIONS
8. ELECTRICAL PLAN / ELECTRICAL KEY/ NOTES
11
Ile
W�
22=3007
9611VE
9W,
C/)
LJ
-
Z
LJ
W+ W
a•
rn
M
D
Z
<
0
Ce
co
w
LLJ
Z
LJ
a•
rn
..j
LJ
a•
M
Z
Z
Z
<
U
%woe
-no
CM
<
I-_
C/)
Drawn By:
W11
Date of Issue:
Ute -18-2.1
Sheet
No. 1
2
0
m
2 It
LLL
+ w
Cf1
Z <
9
rn w_
W
z J
�r
Drawn By:
Vj 15
Date cif Issue:
Sheet
No. 2
co71etle
Drawn By:
Vj 15
Date cif Issue:
Sheet
No. 2
k
z..
__._.CST
W
+
W
m
D
Z
W_
LLJ
z
W
d'
Drawn By:
Date of Issue:
a
0
Z
LLJ
V)
LLJ
ko
+
co
Z
D
Z
<
CO
Li
LJ
Z
<
C�
all
C�
It
.j
LLJ
Z
Cl)
z
FAIMM
Cm
C�
all
<
r�
0
ESUAKAMAIMIAM"Mi MA
L—
I
Irawn By:
wo
Date of Issue:
PREUM
3- -Z
Sheet
No.
�O
40
00
17
m
JIB
Drawn
By:
Date of Issue:
Sheet
No.
ELECTRICAL KEY
o
rt
V)
v�
�
Duplex convenience outlet;.W.P. denotes weatherproof.
1.
2.
Notes: Smoke detectors and CO detectors not shown are to be per code.
Verify dimmer locations on plans with owner
I
Verify all appliance selections with Owner.
D
22OV; appliance outlet
4.
Verify all equipment selections with appropriate Contractor and the Owner.
S.
All fixtures too are tamped with LED bulbs (2700K) wherever possible.
Floor outlet
6..
Locate low voltage boxes such as TV or computer jacks per the Owner's
Z
instruction.
Single pole switch; S3 denotes three-way.
7.
S.
Locate thermostats during electrical walk through.
Schedule a pre -installation walk through with the owner, designer and
contractor to verify all locations prior to installation of rough in.
Ceiling mounted fixture
9.
All recessed lighting fixtures; other specified fixtures and lamps are to be
included in the proposal for contract. Only decorative lighting fixtures are to be
Recessed fixture: 6" Halo H-7 series, White Trim Ring,
included in the fixture allowance specified. See allowance key.
Wet location trim at shower
Hanging fixture: to be selected. (or noted on plans)
Wall mounted fixture to be selected. (or nowd on plans)
_ ry
WAC, BA -LED under cabinet light fixtures or approved equal.
Size to be determined by mounting space
Bath fans to be selected by owner
All symbols with an "E" denote an existing, -,lement. Some may stay to be
M..
reused and some may require removal. The Contractor shall determine.
i