10.a)3) resolution 02-16-06 Zavoral Mine AOPCITY OF SCANDIA RESOLUTION NO. 02-16-16-06 RESOLUTION APPROVING ANNUAL OPERATING PERMIT APPLICATION OF TILLER CORPORATION FOR THE ZAVORAL SAND AND GRAVEL MINE AND RECLAMATION PROJECT WHEREAS, Tiller Corporation ("Applicant") has applied for an Annual Operating Permit (AOP) to operate the Zavoral Mine and Reclamation Project ("Project") on a property owned by James Zavoral, located east of the intersection of State Trunk Highway 97 and State Trunk Highway 95 ("Site"); and WHEREAS, the Property is located in Washington County, Minnesota and legally described in Attachment A; and WHEREAS, the Applicant submitted an application for a CUP for the Project to the City on November 25, 2008, including the required Environmental Assessment Worksheet (EAW); and submitted an updated application on October 9, 2012; and WHEREAS, the Site proposed for the Project is located within the Agriculture (AG) Zoning District in the City's 2020 Comprehensive Plan and related Development Code, and those were the adopted Comprehensive Plan and regulations at the time of the application; and WHEREAS, the City and its consultant completed the Zavoral Mine and Reclamation Project EIS to meet the requirements of Minnesota Rules 4410, and the EIS concluded that if the mitigation recommendations included in the EIS were implemented that the Project will not have significant environmental impacts; and WHEREAS, the City Council approved the Findings of Fact and Record of Decision that found that the Zavoral Mine and Reclamation Project EIS was adequate to serve as the environmental review for the Project because it met the criteria set forth in Minnesota Rules 4410.2800 and the requirements of Minnesota Statutes Chapter 116D on September 25, 2012; and WHEREAS the City approved a Conditional Use Permit for the Zavoral Mine and Reclamation project on February 19, 2013; and WHEREAS, the Scandia City Council reviewed the AOP application at its regular meeting on February 16, 2016; and NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF SCANDIA, WASHINGTON COUNTY, MINNESOTA, that it should and hereby does find that the Annual Operating Permit for 2016 for the Zavoral Mine and Reclamation Project shall be and hereby is issued, with the following conditions made a part thereof: Resolution No.: 02-16-16- Page 2 of 5 1. All site operation and reclamation activities shall, in addition to the requirements of the Conditional Use Permit and this Annual Operating Permit, comply with and be governed by the Conditional Use Permit Compliance and Reclamation Agreement between the City, the Applicant and the Owner approved by the City on February 19, 2013, and the updated Reclamation Plan approved in 2014. 2. Site operations in 2016 shall be consistent with the application and plans submitted to the City in November 2008, and as required by the Conditional Use Permit and these conditions. 3. The applicant's requests for operating hours or haul routes outside those specified in the Conditional Use Permit shall be accompanied by a proposed truck haul route for approval by staff. 4. The applicant shall inform all of its contractors about the following requirements related to trucking operations, and monitor compliance with the requirements by all of its contractors: a. Engine braking is prohibited in Scandia per City Ordinance. b. Lofton Avenue is restricted to daylight hours only as defined in the CUP for the Zavoral Mine and Reclamation Project. c. Haul loads are required to be covered. 5. The City or its consultants shall monitor the potential impacts of mining activities on the ground and surface water resources at the site while mining activities are occurring at the site. The applicant shall cooperate with the City as requested to complete the monitoring activities. The City shall submit all status reports and ground and surface water monitoring reports to the applicant, CMSCWD, the WCD and the Minnesota DNR. 6. The City's consulting hydrogeologist shall make monthly site visits to download groundwater monitoring data and collect manual measurements. Monitoring shall occur during all months when the mine is in operation. The hydrogeologist shall evaluate the data and report the results to the City at least quarterly or more frequently if the consultant identifies issues or problems during the monitoring activity. 7. The City or its consultant shall install a monitoring station upstream of or near the existing monitoring station near Crystal Springs in order to isolate potential effects due to mining from other effects to due unrelated activities within the watershed. The applicant shall permit installation of the monitoring station on the Project Site if requested. The City or its consultant will analyze the data to determine the effect, if any, to the springs due to the Zavoral Mine operation, and identify any negative impacts. Monitoring shall occur during all months when the mine is in operation, weather permitting. The City or its consultant shall install a monitoring station on Middle Creek to collect the same continuous parameters as the stations installed on Zavoral Creek and Crystal Springs. The applicant shall permit installation of the monitoring station. The City or its consultant will analyze the monitoring data to determine the effect, if any, to the creek due to Zavoral mine operation, and identify any negative impacts. Monitoring shall occur during all months when the mine is in operation, weather permitting. 9. The City or its consultant shall visit the monitoring sites on Zavoral Creek, Middle Creek_, and near Crystal Springs at least twice per month to download the automated data loggers at Resolution No.: 02-16-16- Page 3 of 5 the monitoring stations and gather data for analysis and analyze the water quality and quantity data gathered at the site. Monitoring shall occur during all months when the mine is in operation, weather permitting. The consultant may also visit the sites after large storm events to gather and analyze monitoring data. If the consultant detects any negative impact to Zavoral Creek, Middle Creek or Crystal Springs, due to the Zavoral Mine operation, they will notify the City immediately. The consultant shall provide a summary of the monitoring data and analysis by early January for use in the AOP evaluation. 10. The City or its consultant shall complete twice annual macro -invertebrate monitoring on Zavoral Creek and provide this information to the CMSCWD. 11. The City or its consultant shall perform periodic on -site review and monitoring of dust control activities to assure compliance with this permit. Monitoring shall occur during all months that the mine is in operation. The applicant shall cooperate with the City as requested to complete the monitoring activities. 12. The City or its consultant shall establish air monitoring stations at a minimum of five locations: upwind of mining and loading operations, downwind of mining and loading operations, at the site entrance, downwind of the site entrance, and downwind of one location on the haul route. The City may establish additional monitoring locations based on City or public concerns. 13. The air quality monitoring plan shall include the collection of the following samples at each sampling location: Airborne particulate matter PM10 (monitor using a fibrous aerosol monitor fitted with a PM10 impactor); Respirable dust (using cyclones/37mm PVC cassettes and lab analysis [NIOSH method 0600/7500; mod OSHA ID-142]); Respirable silica, quantitative (using cyclones/37mm PVC cassettes and lab analysis); Diesel particulates (37 Quartz Fiber NIOSH 5040) and Nitrogen dioxide (TEA Tude, OSHA ID-1820; or equipment and methods that meet current OSHA or State standards. A monitoring station for respirable dust and respirable silica shall be established as close as possible to and downwind of the on - site operations. 14. The City or its consultant shall analyze and compare the air monitoring results to current State and Federal Ambient Air Quality Standards, ACGIH TLV or OSHA PELS or current applicable standards. 15. If sample results indicate levels above generally accepted or mandated action levels, the applicant shall stop all work on the site, review operating procedures and modify Project operations as necessary to reduce emissions. The City shall complete additional monitoring immediately after new procedures are in place to confirm that an acceptable reduction in emissions has occurred. 16. The applicant shall water and wash haul roads on the site during active mining operations, in accord with the applicant's updated Dust Control Plan, unless recent precipitation is keeping haul roads washed and wet. 17. The applicant shall wash hauling and loading equipment on a regular basis during active mining operations. Resolution No.: 02-16-16- Page 4 of 5 18. The applicant shall complete sweeping activities using vacuum -assisted sweeping equipment or similar equipment that ensures that sweeping operations do not generate visible airborne emissions. 19. The City or its consultant shall complete noise monitoring at the Project site. The applicant shall cooperate with the City as requested to complete the monitoring activities. 20. Noise monitoring shall include identification of one or two worst -case representative residential locations for each phase of mining and conduct at least one hour of monitoring at each location on a quarterly basis during operations in the morning and one hour of monitoring during operations in the afternoon. 21. Noise monitoring shall include at least one hour of monitoring at a representative location along the St. Croix Scenic Riverway quarterly during mining operations. 22. A noise monitoring event will be conducted within six weeks of the beginning of each mining phase, weather permitting, during a typical haul event. The City may conduct additional monitoring if needed based on site conditions. Monitoring shall be conducted in accord with Minnesota Rules. 23. The City shall notify residents of monitoring periods and request access to properties as necessary to conduct monitoring activities. 24. If monitoring results indicate levels above state standards, the applicant shall stop all work on the site, review operating procedures and modify Project operations as necessary to reduce noise to permitted levels. The City shall complete additional monitoring immediately after new procedures are in place to confirm that an acceptable reduction in noise has occurred. 25. The City or its consultant shall complete traffic monitoring of the Project. The applicant shall cooperate with the City as requested to complete the monitoring activities. 26. The Applicant shall maintain the traffic generated by the Project so that traffic does not exceed the maximum levels analyzed in the EIS for Alternative 3—average 334 to 400 round trips per working day and 600 peak round trips per day. 27. The City or its consultant shall complete a 14-hour video log of the TH 97 and 95 intersection that shall include the new access to the Zavoral site and count the numbers of trucks entering and exiting the site. The City's consultant shall review the log, and shall provide a summary of the observations related to traffic operations to the City, and identify any issues or problems related to the conditions required for operations. If issues are identified, the City may order additional video traffic counts. 28. The City or its consultant shall complete a 14-hour video log of the TH 97 and CR 91 (Lofton Avenue) intersection in 2016 if traffic issues are identified. The consultant shall provide a summary of observations to the City and identify any issues or problems. 29. The applicant shall regularly monitor the entrances and exits to the site, and work with their hauling contractors and truck drivers to maintain compliance with traffic laws. Resolution No.: 02-16-16- Page 5 of 5 30. The City shall review the crash records for the roadways in the area that will be used for truck -hauling every six months, to identify safety issues. The City shall contact Mn/DOT to discuss safety issues if identified. 31. The applicant shall post a "no trespassing" sign on the south side of the gate to the property and a "no parking" sign near the entrance to the mine site. 32. The City or its consultants shall complete monitoring of reclamation activities on the site on behalf of the City. The applicant shall cooperate with the City as requested to complete the monitoring activities. The City shall inspect the reclamation activities on an as -needed basis. 33. The applicant shall submit to the City quarterly reclamation activity progress reports during the growing season post -seed installation of each monitoring area, and shall submit an annual reclamation report with the AOP application for 2017. 34. The applicant shall provide advanced notice to, and shall obtain written approval from the City prior to deviating from any performance requirement contained within the CUP or AOP. Failure to obtain written approval for a deviation from the performance requirements of the CUP or AOP shall be a violation of this AOP. 35. The applicant shall maintain the letter of credit for the Phase 2 reclamation work at the City. 36. This Annual Operating Permit shall expire on March 31, 2017. 37. The applicant shall pay all fees and escrows associated with this application. Adopted by the Scandia City Council this 17th day of February, 2015. Randall Simonson, Mayor ATTEST: Neil Soltis, Administrator/Clerk