Loading...
5.a 12408 228th St N Scandia_site plan for septic rplcmt12408 228th St N, Scandia 0 20 4010 ft 0 7 143.5 m 1:2 50 Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification. ~ 7 5 ' - 2 " S C H 4 0 P I P E HOU S E BENCHMARK = 100.0' Threshold of Back Door Need variance for 16' setback from house to mound STA 5.0ft 8.0 f t 16.0 f t20.0 f t 20.0 f t HOU S E 5.0ft w Deep Well 50.0ft 13.3ft15' -0 " 15.0ft WALL STAIR S 110.81 DIGOUT EXISTING AT-GRADE 16' X 42' ROCK BED GRADE UPSLOPE TO LEVEL @102.5' SHED (slab o n gr a d e) 14' X 2 0' Tanks must be certified. Contact Smilie's Sewer for Certification. SP1 INSPECT 2" SUPPLY LINE GAS GA S GA S GA S G A S GA S GA S GA S GA SGA S G A S G A S G A S G A SGA S G A S G A S G A S G A SGA S G A S G A S G A S G A SGA S 8.0ft SB3 SB2 SB1 ADD E F F L U E N T SCR E E N PUMP TANK 1,500 COMBOTANK30'20'ABSORPTION AREA ROCK BED13.5%3%27.2ft 10.0ft GARAGE 2' ROOF LINE21.0ft9.5ft21.5ft24.5ftInstall Timed Dosing Control Panel for Pump NOTES: 1. Reuse existing Tanks: 1st Tank - 1,500-gallons (split compartment) and Pump Tank - 1,000-gallons (single compartment). 2. Existing Tanks must be certified by licensed Maintainer (Pumper) or Inspector to be water-tight and structurally sound. 3. Existing At-Grade Rock bed and Soil Cover must be removed. Handle all contaminated soil as sewage and hazardous waste. 4. Prepare soil below mound absorption area carefully throughout 20' x 30' Soil Absorption Area. Be careful not to compact soil during deconstruction of At-Grade. 5. Time-Dosing Control Panel will be used to control flow to a maximum of 210-gallons per day and measure usage daily. 6. A High-Level Alarm will be activated if household uses more that 210-gallons is a 24-hour period. 7. A small retaining wall may be necessary to allow access to door of Garage. Discuss options and costs with homeowners. 8. The existing Sewer and Pump Supply Lines must be inspected if either is reused. 9. Northwest end of mound berm calculation extends beyond small deck to south of the house. Installer must discuss options to blend berm or build retaining wall beyond the absorption are to keep soil cover from impacting deck. - THIS IS ONLY A SITE PLAN - ALL SEPTIC LOCATIONS AND MEASUREMENTS ARE ONLY ESTIMATES - AS-BUILT WILL NEED TO BE PROVIDED BY INSTALLER AFTER CONSTRUCTION Kloeppner Services & Designs, LLC Lic # 4043 Approved by: Jesse Kloeppner Date - 11/20/20 LEGEND: W = Well SB = Soil Boring SP = Soil Pit = Benchmark NORTH MOUND DIMENSIONS Rockbed - 10' x 30' Absorption Bed - 20' x 30' Total Mound - 37.1' x 58.2' Upslope Elev. - 102.5' Min: Sand Height - 18" @ 105.0' Rockbed Laterals Elev. - 105.8' Height @ Crown Elev. - 107.3' LATERALS 3 - Laterals @ 28' of 1-1/2" SCH40 Spacing - 3' Drilled Holes - 3/16" NW - 100.4' SB1 - 102.5' NE - 101.9' SB2 - 102.1' SW - 102.5' SB2 - 100.2' SE - 102.5' SP1 - 101.8' Wood Deck