Loading...
5.a1 Sundberg Main Proposed1 A8.0 2 A8.0 10' - 0"258 SF Existing Main Cabin 1 98 SF New Bedroom 3 64 SF Bath 4 210 SF Existing Porch 2 VERIFY TO ALIGN WITH EXISTING 17' - 10"12' - 0"7' - 0"4' - 2 1/4"LINE OF EXISTING DECK REMOVE AND REPLACE ALL EXISTING DECKS AS REQUIRED REPLACE STAIR 3' - 10"7' - 0"2' - 2"10' - 2"4' - 0" LIFT STATION, VERIFY 43 SF Sauna 5 24 SF Changing 6 3' - 0"3' - 0"3' - 0"6' - 2 3/4"1 2 3 1 244 5NEW RAILING PER CODE 20' - 5"14' - 5 1/4"14' - 8" 5' - 2"14' - 6 1/2"4' - 10" 7' - 9"5' - 0"PLUMB SINK AS REQ. WH W/D 14' - 6 1/2"5' - 2"PINE TREEADDITION10' - 2"ADDITION 18' - 0"VERIFY9' - 5"VERIFY9' - 9"VERIFY9' - 9"VERIFY7' - 3"VERIFY7' - 3"VERIFY4' - 0"6' - 7"12' - 8"STRUCTURAL NOTES B1 W 8X18 B2 W 8 X 10 B3 MC 12 X 10.6 B4 (3) 2X10'S B5 (2) 2X8 [1J/1K] J1 2X8'S @ 16" O.C. J2 2X6'S @ 16" O.C. J3 2X10'S @ 16" O.C. HELICAL PIER LOADING LISTED AT PIER LOCATIONS B1 B1 B1 B1 B1 B1 10K 10K 12K 12K 10K 10K J1 J1J2 J2 B3 B3 12K 12K 12K 12K 12K 12K B4 TYP.B4 TYP.B4 TYP. J1 J1J2 J2 B4 B4 B4 10K 10KB1 J3 J3 J1 B2 B2 4K 4K 7K 7K HELICAL PIER, TYP. Scale Project number Date Drawn by Checked by 1/4" = 1'-0"4/23/2021 11:12:37 AMA1.0 Framing and Floor Plans 21 SundbergCabin Stabilization & ExpansionSundberg Family04/23/21 LLA -21795 ST CROIX TRL NCITY OF SCANDIA1/4" = 1'-0"1 First Floor - Option 1 No.Description Date 1 Structural Review 03/31/21 2 Structural Update 04/23/21 1/4" = 1'-0"2 First Floor Framing RESET DOOR AS REQ. NEW SCREEN, TYP. DIAGONAL BRACING AS REQ. NEW 2X CEDAR SS CABLES, TBD DIAGONAL BRACING AS REQ. Scale Project number Date Drawn by Checked by 1/4" = 1'-0"4/23/2021 11:12:42 AMA6.0 Elevations 21 SundbergCabin Stabilization & ExpansionSundberg Family04/23/21 LLA -21795 ST CROIX TRL NCITY OF SCANDIA1/4" = 1'-0"1 South 1/4" = 1'-0"2 East 1/4" = 1'-0"3 North 1/4" = 1'-0"4 West No.Description Date 1 Structural Review 03/31/21 2 Structural Update 04/23/21 HELICAL PIERS, TBD INSULATE FLOOR NEW DECK AND RAILING 7' - 0"REPAIR EAVE EXTEND NEW ROOF MIN 2" BEYOND FASCIA NEW DRIP EDGE BRACING AS REQ. DROP BEAMS IF CLEARANCE ALLOWS DIAGONAL BRACING AS REQUIRED Scale Project number Date Drawn by Checked by 1/2" = 1'-0"4/23/2021 11:12:42 AMA8.0 Building Sections 21 SundbergCabin Stabilization & ExpansionSundberg Family04/23/21 LLA -21795 ST CROIX TRL NCITY OF SCANDIA1/2" = 1'-0"1 Section Cabin 1/2" = 1'-0"2 Section Porch No.Description Date 1 Structural Review 03/31/21 2 Structural Update 04/23/21