Loading...
7. Discuss Anderson-Erickson expansion potentialScandia City Staff, Here are some thoughts and concerns with expanding a system to over 10,000 gpd. • Need MPCA permit – requires application and associated fees to MPCA (plus engineering fees to complete application) • MPCA permit requires renewal every 5 years • Monthly submittal required to MPCA for Discharge Monitoring Report (DMR) o Includes monthly testing and reporting of all monitoring wells for parameters defined in permit (lab and labor costs) o Includes monthly testing within treatment system – influent/effluent and all parameters noted in permit (lab and labor costs) • MPCA will require monitoring wells to be installed – capital cost required for each well installed. • MPCA sanitary sewer extension permit required for any new addition/extension/replacement of the sanitary sewer • Need to employ a licensed WW operator (Class D for the system and type IV certification for application of solids from tankage) • Need to have an updated operation and maintenance manual • Possibility for more stringent limits (such as nitrogen) requiring additional construction and capital costs to meet limits o Possibility for new/more stringent limit happens every 5 years upon permit reissuance Thanks, Ryan J Goodman P.E. Bolton & Menk, Inc. 3507 High Point Drive North Bldg. 1 Suite E130 Oakdale, MN 55128 Mobile: 612-597-7140 Bolton-Menk.com