Loading...
Playground Equipment Options_PRCCommunity Center Proposed Playground Equipment Options City of Scandia Parks and Recreation Committee–November 1, 2021 Budget Schedule and Assumptions •City budget: $37,500 for Ballfield Playground replacement •City budget for $57,500 for Community Center Playground replacement •SPPER voted to designate all playground equipment budget to Community Center replacement •Total Community Center Playground Replacement budget = $190,000 •$95,000 from City funds •$95,000 from 50/50 matching grant •Original budget had ballfield equipment replacement in 2021; community center playground equipment replacement in 2023 •Revised budget has $95,000 in City funds budgeted for use in 2022 for replacement of Community Center playground equipment. •Playground equipment area will be the same, with some opportunity for expansion. •Minimal grading/earthwork needed. Playground Equipment Priorities •Needs •Shade •Separate big kid/little kid structures •Min. ADA requirements •Musical feature for little kid’s play structure •Balance component •Continuous path for big kid’s play structure •Climbing component with big kid’s play structure •Tall tower for big kid’s play structure •Wants •ADA accessibility for at least half components •Nature, “rural life” or barn theme •Play structure(s) red in color •Playhouse/fort/imaginative component for little kid’s play structure •Adult fitness component •Water play feature for little kid’s structure Playground Vendor Conceptual Layouts – Subcommittee Recommendations Ultimate Playgrounds –Concept 3 2 to 5 Play Features: •Barn theme structure •Rock climbing wall •Alligator balance beam 5 to 12 Play Features: •Large tower Additional features: •Water feature (ADA) •Stand up spinner •Sit down spinner •Loader bouncer •Horse tetter totter Total ~$170,000 (incl. surfacing) Webber Recreation –Concept 1 2 to 5 Play Features: •Playhouse with tunnel 5 to 12 Play Features: •8’ tower Additional features: •Nature panels •Grasshopper bouncer •Sit down spinner •Adult/child swing Total ~$120,000 (doesn’t incl. surfacing) Discussion