Loading...
8.a4 PRC-Playground Equipment Options_City Council Community Center Proposed Playground Equipment Replacement Scandia City Council – November 16, 2021 1 Project Activities to Date Online Survey 10/21/20 – 11/20/20 Great feedback, positive community interest Developed Sub-Committee Group (SPPER) Toured local playgrounds Reviewed online survey results Developed list of project priorities Met with playground vendors Researched grant opportunities Selected 2 preferred playground layouts PRC selected preferred playground option to present today 2 Budget Schedule and Assumptions City budget: $37,500 for Ballfield Playground replacement City budget for $57,500 for Community Center Playground replacement SPPER voted to designate all playground equipment budget to Community Center replacement Total Community Center Playground Replacement budget = $190,000 $95,000 from City funds $95,000 from 50/50 matching grant Original budget had ballfield equipment replacement in 2021; community center playground equipment replacement in 2023 Revised budget has $95,000 in City funds budgeted for use in 2022 for replacement of Community Center playground equipment. Playground equipment area will be the same, with some opportunity for expansion. Minimal grading/earthwork needed. 3 Playground Equipment Priorities Needs Shade Separate big kid/little kid structures Min. ADA requirements Musical feature for little kid’s play structure Balance component Continuous path for big kid’s play structure Climbing component with big kid’s play structure Tall tower for big kid’s play structure Wants ADA accessibility for at least half components Nature, “rural life” or barn theme Play structure(s) red in color Playhouse/fort/imaginative component for little kid’s play structure Adult fitness component Water play feature for little kid’s structure 4 Webber Recreation – Concept 1 2 to 5 Play Features: Playhouse with tunnel 5 to 12 Play Features: 8’ tower Additional features: Nature panels Grasshopper bouncer Sit down spinner Adult/child swing ~$120,000 for equipment ~$15,000 for curbing ~$5,000 for ADA sidewalk to playground entrance ~$50,000 for surfacing (combination of rubber/woodchips) Total = $190,000 5 Next Steps Apply for Grants Minnesota DNR Outdoor Recreation Grant Program Osceola Community Health Contact local businesses for sponsorships/grants Team with watershed? Develop project engineering details Looking to get funding finalized/equipment ordered Spring 2022 Removal/Installation Summer 2022 Ready to play! Late summer/fall 2022 6