5.b Staff Report Bethany Center PC Staff Report
TKDA ® | 444 Cedar Street Suite 1500 | Saint Paul, MN 55101 651.292.4400 • tkda.com
An employee -owned company promoting affirmative action and equal opportunity.
Memorandum
To: Scandia Planning Commission Reference: Bethany Center Application
Copies To: Brenda Eklund, Clerk
Ken Cammilleri, City
Administrator
Sheryl Moran & Roger Tomten,
Applicant
Project No.: 18407.000
From: Evan Monson, Planner Routing:
Date: February 25, 2022
SUBJECT: Conditional Use Permit for a Place of Worship land use, and a variance from
the accessory structure standards
MEETING DATE: March 1, 2022
LOCATION: 23393 Nolan Avenue North, PIDs 04.032.20.13.0001; 04.032.20.41.0001;
04.032.20.14.0001; 03.032.20.23.0001; 03.032.20.22.0002;
03.032.20.21.0004
APPLICANT: Roger Tomten (designer)
OWNER: Sheryl Moran, Bethany Center for Prayer & Renewal
ZONING: General Rural (GR), Agriculture Core (AG C), Shoreland Overlay
REVIEW PERIOD: 120 day period ends April 1st
ITEMS REVIEWED: Application and plans received December 22, 2021
DESCRIPTION OF THE REQUEST
The applicant is looking to redevelop the subject property into a ‘place of worship’ land use – the Bethany
Center for Prayer and Renewal. The applicant is proposing to remodel the existing house, barn, and
granary on the site as part of their proposed project. The project would turn the property into a quiet site
for prayer and religious study of the Christian faith. Individual hermitages/cabins would be built on the site
as well, providing a space for solitude for visitors. A parcel on the north end of the subject property would
house a director/groundskeeper and a priest, ensuring that there is an in-person presence on the site at
all times.
The property spans multiple parcels. Three of them are zoned AG C, while the others are zoned GR. The
Shoreland Overlay covers all of the parcels as well. A place of worship land use is a conditional use in
each of these zoning districts.
The proposed project is planning for multiple hermitages on the site. A place of worship land use is
permitted multiple accessory structures, though said structures are to adhere to the accessory structure
Bethany Center Staff Report March 1, 2022
Scandia Planning Commission Page 2
standards under Chapter Two of the Development Code. Due to this requirement, a variance would be
necessary, as the number and total square footage of the accessory structures on the site would be
exceeded under the current proposal.
PROPERTY INFORMATION
Parcel description: 23393 Nolan Avenue North is located on the north side of the city. The property
bounds the south/east sides of Sea Lake. The property is made up of multiple parcels, totaling
approximately 110 acres. Four of the parcels are zoned AG C and total 94.9 acres, while the others are
zoned GR and total approximately 15.1 acres in size. The two parcels zoned GR have access off of 240th
Street; one of the parcels has an existing house addressed as 13519 240th Street North. The remaining
parcels, which are addressed as 23393 Nolan Avenue, have access off of Nolan Ave. A house, barn, and
granary occupy these parcels. Portions of the site were also previously used as a tree farm.
Zoning: General Rural (GR), Agriculture Core (AG C), Shoreland Overlay
Land use: Single-Family Residential, Agriculture
EVALUATION OF REQUEST
Applicant’s Explanation of the Plan and Variance Request
See attached narrative from applicant.
Staff Comments on the Variance Request
Engineer
We are currently awaiting comments from the City Engineer on the proposed project.
Watershed
The Comfort Lake Forest Lake W atershed District noted watershed permits would be required for this
project, and were still reviewing the plans.
DNR
The East Metro Area Hydrologist did not provide comments at the time of this staff report.
Washington County
Jay Riggs with the conservation district noted a delineation for wetlands would be needed for the site, to
determine wetland locations and setbacks for new structures to adhere to.
Bethany Center Staff Report March 1, 2022
Scandia Planning Commission Page 3
Project Details
The ‘place of worship’ land use is defined in Chapter One of the Development Code. The definition reads:
“A building, together with its accessory buildings and uses, where persons regularly assemble for
religious worship and which building, together with its accessory buildings and uses is maintained and
controlled by a religious body organized to sustain public worship.”
This use is listed as a conditional use in both the AG C and GR zoning districts, as well as within the
Shoreland Overlay; hence the need for a conditional use permit (CUP). The use, as defined in our code,
permits multiple structures on the site can be used as a part of this use. The proposed plans would result
in three existing structures being repurposed; an existing house would be repurposed into a ‘Hospitality
Center’, an existing barn would be repurposed into a storage facility as well as a future conference
room/dining area for users of the site. On-site parking for the site would be located around the barn. The
existing granary on the site, located just south of the barn, will be remodeled into a small chapel. An
existing house, located on the parcel with access off 240th Street, would be used to house an on-site
director/groundskeeper. An ADU could be added in the future to house an on-site priest. Twelve
hermitages are proposed on the site, these would be located on the east side of the site. A potential
driveway connecting the site to the house near 240th Street could be built in the future.
Development Code Items
Zoning District and On-site Parking Requirements
As noted previously, a place of worship is a conditional use. This use, per its definition, permits multiple
buildings as part of the use. The use itself does not have any use-specific standards or requirements to
follow. The place of worship land use is able to meet setbacks, has existing screening and landscaping,
and can adhere to the lot requirements of the GR and AG C zoning districts, as well as the Shoreland
Overlay. Chapter Two, Section 3.10 notes the parking requirements for different land uses in the city.
Section 3.10(2) notes that parking shall utilize asphalt, concrete, or a reasonable substitute as approved
by the City Engineer.
Lot Combination
In order to alleviate potential zoning issues from arising in the future, City staff would request as a
condition of approval that parcels under the same zoning designation be combined together. This would
clear up some existing instances with property lines running close to and through existing and proposed
improvements on the site, as well as clear up some zoning requirement issues applicable to accessory
structures on each parcel. The four parcels zoned AG C, which consist of a majority of the site, could be
combined into one parcel, while the two parcels on the north end of the site that have access off of 240th
Street could be combined into one parcel; this would turn the site from six parcels to two. A lot
combination could be approved administratively by staff.
Bethany Center Staff Report March 1, 2022
Scandia Planning Commission Page 4
Figure 1: Site Plan, showing future combination of the parcels zoned AG C (in red) & parcels zoned GR (in yellow)
Accessory Structure Requirements
The Development Code’s current standards for accessory structures, though, still come into play as a
result of the multiple accessory structures proposed on the site. Accessory Structure standards are found
under Chapter Two, Section 3.2 of the Development Code. The code currently breaks down accessory
structure standards into commercial/industrial, or residential/agriculture . As an institutional use, a place of
worship does not fit cleanly into the current standards. Staff has asked the City Attorney to weigh in on
the correct applicability and interpretations to apply to this request.
The site currently has two accessory structures that would be repurposed (the barn and granary); the
hermitages would also fall under the accessory structure count, bringing the total count to 14. The square
footage of the barn and granary would total 3,600 SF; if the hermitages are at 1,000 then you’d have
potentially 12,000 SF of structures in addition to the existing 3,600 SF. The applicant has noted the
hermitages on the site would be no bigger than 1,000 SF in size. The priest residence is planned by the
applicant as being an ADU; this could be located on the same parcel as the hermitages (the parcels
zoned AG C) or on the same parcel as the house for the director/groundskeeper (the parcels zoned GR).
AG C parcels (4 @ 94.9 ac) Currently existing? Size (SF) Number
Barn Yes 3,100 1
Granary Yes 500 1
Hermitages No >1,000* 12
Totals 15,600 14
Bethany Center Staff Report March 1, 2022
Scandia Planning Commission Page 5
GR parcels (2 @ 15.1 ac) Currently existing? Size (SF) Number
ADU No 1,000** 1
Detached garage Yes 1,008 1
Totals 2,008 2
*the hermitages are proposed to be no larger than 1,000 SF
**An ADU would be permitted a maximum floor area of 1,000 SF
Figure 2: Existing and Proposed Accessory Structures
Additional Items
The site is planned to be built out and developed over time. The applicant would desire a different
expiration of the CUP, so as to allow for a more phased development of the project. The City may allow
for a different timeline during initial review and approval of the CUP.
The public hearing notice originally noted that the principal structure on the site (the existing house) was
within the setback from Sea Lake. City staff were able to find the original surveys from the building of the
house that confirm the setback requirement of 200 feet from the OHWL was met, so that variance was no
longer applicable/needed.
The applicant will need to complete a wetland delineation of the site at the end of winter. The delineation
would identify wetlands on the site and allow the applicant to site the hermitages and other improvements
to the site outside of applicable wetland setbacks. If, in the situation that a setback from a wetland were
unable to be met, the applicants will need to acquire a variance as well as amending the CUP.
The improvements on the site would have to adhere to the City’s Design guidelines and the requirements
outlined in Chapter Two, Section 3.14 of the Development Code.
CUP Criteria and Findings
Chapter One, Section 8.4 of the Development Code lists the criteria to meet to grant a CUP. They are
listed below in italics.
1. The conditional use will be in compliance with and shall not have a negative effect upon the
Comprehensive Plan, including public facilities and capital improvement plans.
2. The establishment, maintenance or operation of the conditional use will promote and enhance the
general public welfare and will not be detrimental to or endanger the public health, safety, morals
or comfort.
3. The conditional use will not be injurious to the use and enjoyment of other property in the
immediate vicinity for the purposes already permitted, nor substantially diminish and impair
property values or scenic views.
4. The establishment of the conditional use will not impede the normal and orderly development and
improvement of surrounding property for uses permitted in the district.
5. Adequate public facilities and services are available or can be reasonably provided to
accommodate the use which is proposed.
Bethany Center Staff Report March 1, 2022
Scandia Planning Commission Page 6
6. The conditional use shall conform to the applicable regulations of the district in which it is located
and all other applicable standards of this Chapter.
7. The conditional use complies with the general and specific performance standards as specified
by this Section and this Chapter.
Variance Criteria and Findings
Chapter One, Section 6.0 of the Development Code includes the criteria and required process for
considering variance requests.
Variances shall only be permitted when they are in harmony with the Comprehensive Plan and
general purposes and intent of the official control.
The property owner proposes to use the property in a reasonable manner under the conditions
The practical difficulties are not caused by the landowner and are unique to the property.
The variances would not alter the essential character of the area.
Economic conditions alone shall not constitute practical difficulties.
The proposed variance will not impair an adequate supply of light and air to adjacent property, or
substantially increase the congestion of the public streets, or increase the danger of fire, or
endanger the public safety, or substantially diminish or impair property values within the
neighborhood.
The requested variance is the minimum action required to eliminate the practical difficulty.
Practical difficulties include, but are not limited to, inadequate access to direct sunlight for solar
energy systems.
ACTION REQUESTED
The Planning Commission can recommend to the Scandia City Council that it do one of the following:
1. Approve
2. Approve with conditions
3. Deny with findings
4. Table the request
RECOMMENDATION
Staff would recommend tabling the request, to allow the applicant to provide additional information for the
request to the Planning Commission to review.