Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
6.a) Staff Report-Lilleskogen Parking Lot
Staff Report To: Park and Recreation Committee From: Tim Kieffer, Director of Public Works Date: October 7, 2013 Re: Lilleskogen Parking Lot Agenda Item #: 6.a) SCANDIA Background: The installation of driveway aprons for the Lilleskogen parking lot was discussed at the September Park and Recreation Meeting. There had been one quote received at that time and the committee members elected to wait for more bids to be submitted. Due to being late in the summer and contractors being busy, prices have not been favorable. The Committee also discussed whether to pay for the gravel or find donations. Per the Lilleskogen Strategic Action Plan, the Park and Rec Committee should be working on the gravel parking lot. The concrete work would include installing two new driveway aprons as previously designed and replacing the existing driveway with boldface curb. Staff also contacted the County to obtain a permit for the driveway aprons. The following are conditions the County has made in order to issue the permit: • Signs "Entrance Only" and "Exit Only" shall be posted on County Road 52 to create a one way in and one way out parking lot. • Pavement markings shall include an arrow at both accesses when paved. • If accesses are designed as an entrance and an exit to the parking lot, the parking stalls should be angled. • When future development and/or reconstruction of CR52 is needed and a median is installed, access to this parking lot will be limited to northbound traffic and will not have full access. Issue: Should the City install two new driveway aprons and replace the existing apron with curb? Proposal: The Park and Recreation Committee should decide whether to recommend to the Council installing the driveway aprons now or wait until next Spring. Fiscal Impact: The balance in the Park Capital Improvement Fund is $7,955. Options: 1) Wait until next spring to solicit bids in the hopes of obtaining better prices. 2) Recommend to the Council to award the concrete curb replacement to Concrete Works Unlimited. for the amount of $5,020. Recommendation: Option 1 Attachments: • Survey of Lilleskogen with parking lot • Quote from Ron Kassa • Quote from Olson Sewer and Water • Quote from New Look Contracting • Quote from Concrete Works Unlimited 'w \ f1! i \°'1V SCHEDULE OF UNIT PRICES - REVISED 9-9-2013 LILLESKOGEN CONCRETE WORK CITY OF SCANDIA, MINNESOTA BMI PROJECT NO. 15.106565 BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices: NOTE: BIDS shall include sales tax and all applicable taxes and fees. BIDDER must fill in unit prices in numerals, make extension for each item, and total. CY (LV) = Cubic Yards, Loose Volume CY (CV) = Cubic Yards, Compacted Volume (Measured in Place) (P)=Planned Quantity Basis of Measurement ITEM NO. ITEM APPROX. UNIT QUANT. UNIT PRICE 1 TRAFFIC CONTROL 1 LS �4060.00 2 MOBILIZATION 1 LS '75-0. 0 3 REMOVE CURB & GUTTER 170 LF QQ7 E/ 4 CONCRETE CURB & GUTTER 170 LF 5 REMOVE BITUMINOUS PAVEMENT 35 SY• TOTAL AMOUNT: New hook 0011-bqj y0G, 7-702 % l C9 /fry Co., �Ort AMOUNT a. 000. vo -1 BO LTCZN $L Its = N K , I r,,,j Cm + Consulting Engineers & Surveyors " 2035 County Road D East • Suite B • Maplewood, MN 55109-5314 Phone (651) 704-9970 • Fax (651) 704-9971 www.bolton-menk.com September 6, 2013 Contractors RE: Lilleskogen Park Concrete Work— Quote Request City of Scandia Project No.: N15.106565 Dear Contractor: The City of Scandia is soliciting quotes to remove and replace curb and gutter along Oak Hill Road North in preparation of a future parking lot project at Lilleskogen Park. The scope of work involved will require the contractor to remove the existing curb and install new curb as noted on the attached figure. Contractors shall form the future radius within the limits of the existing curb line only. Locations will be marked in the field by City. In addition to the concrete curb work the existing bituminous driveway entrance shall be removed. Approximate quantities are shown on the attached Schedule of Unit Prices. Contractor is required to comply with the MN MUTCD temporary Traffic Control Zone Layout requirements. Construction requirements shall conform to MnDOT Standard Specifications for Construction and the City of Scandia. Mix design of concrete shall be 3A32C in accordance with MnDOT Specification 2461. Curing compound shall be per MnDOT 3754 and contain a fugitive dye. Work shall be completed by October 18, 2013. Prior to starting work Contractor shall submit Certificate of Insurance. Quotes shall be emailed to katiewaLd)bolton-menk.conn in pdf or jpeg format or Wednesday, September 11, 2013, 11:00AM. If you have any questions please contact me at 651-6154387. Results will be discussed at the September 170s, 2013 City Council meeting with potential award. Sincerely, BOLTON & MENK, INC. baa- A✓,w,,._ Katie Warner Senior Project Engineer Enclosures: Site/Location Plan, Schedule of Unit Prices DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer Olson's Sewer Service, Inc. Customer Service Opportunity DATE Estimate # 9/9/2013 9949 NAME/ADDRESS City of Scandia P.O. Box 125 14727 209th Street North Scandia, MN 55073 Page 1 PROJECT DESCRIPTION QTY COST TOTAL Lilleskogen Concrete work BMI Project NO.15 106565 Traffic Control #1 Signage 1 500.00 500.00 Subtotal Function 500.00 Mobilization #2 Truck (Tri -Axle) & trailer for hauling 1 135.00 135.00 equipment (with a minimum charge of one hour) Truck (Pick-up) & Trailer for hauling 1 100.00 100.00 equipment (with a minimum charge one hour) Tri -axle dump truck -Commercial hauling 2 95.00 190.00 Subtotal Function 425.00 Remove curb and gutter #3 Tri -axle dump truck -Commercial hauling 3 95.00 285.00 CAT312 Hourly Rate 3 125.00 375.00 S185 Bobcat Hourly Charge 3 105.00 315.00 Dresel Contracting $10.00 per ton for 26 15.00 390.00 b� concrete with rebar ��7 - I Subtotal Function '` r� 1,365.00 Concrete Curb & Gutter #4 �� orkh. 0 - Carroll Carroll Anderson 170 _egg 9_QQ S130 Bobcat Hourly Charge Backfill behind 4- _ _ - 105.00. 00 curb Subtotal Function 6,3 10-.90- Remove Bituminous Pavement #5 6�;, TOTAL Page 1 kw LU M m YF z U, 0�0 WL) Wm IL af 0 wwz jr 4 m ;"amus L4 A. c! gL z 0 < M W z w )WI D w 0 w cr m 14 LU M m YF z U, 0�0 WL) Wm IL af 0 wwz jr 4 m ;"amus L4 A. c! gL z 0 < M W z )WI WHO SCHEDULE OF UNIT PRICES - REVISED 9-9-2013 LILLESKOGEN CONCRETE WORK CITY OF SCANDIA, MINNESOTA BMI PROJECT NO. 15.106565 BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices; NOTE: BIDS shall include sales tax and all applicable taxes and fees. BIDDER must fill in unit prices in numerals, make extension for each item, and total. CY (LV) = Cubic Yards, Loose Volume CY (CV) = Cubic Yards, Compacted Volume (Measured in Place) (P)=Planned Quantity Basis of Measurement 11 CM NO. ITEM APPROx. QUANT. UNIT UNIT PRICE AMOUNT 1 TRAFFIC CONTROL 1 LS 5 0 0. 0 0 5 C)() . Q� 2 MOBILIZATION 1 LS25 . 130 �5. � p 3 REMOVE CURB & GUTTER 170 LF I j . 0'J t 2.040. ()o 4 CONCRETE CURB & GUTTER 170 LF '`+ Q 5 REMOVE BITUMINOUS PAVEMENT 35 SY _ lQ . W 0 , 00 TOTAL AMOUNT: 1 9 (3 O S . 40 Concrete Works Unlimited, LLC 26604 Spruce Avenue Shafer, MN 55074 651-303-2726 phone 651-257-5100 fax Name / Address Bolton & Menk, Inc. 2035 County Road D East, Suite B Maplewood, MN 55109 Atm: Katie Warner, PE PROPOSED ESTIMATE Date Estimate # 9/23/2013 31032 Estimate is good for 30 days from the date of this proposed estimate. Please sign and return by email: wariakois5@hotmail.com or fax: 651-257-5100 If you have any questions regarding this estimate, please call Steve Wariakois at 651-303-2726 ProjectIJob Terms BMI Project No, 15.106565 Lillesko en Concrete Work Due on receipt Description Total Remove existing curb & gutter approximately 170 LF @ $8.50 per LF 1,445.00 Install concrete curb (B-6-16) & gutter approximately 170 LF @ $20.00 per LF 3.400.00 Remove existing bituminous pavement approximately 35 SF @ $5.00 per SF 175.00 Traffic control (No Charge) 0.00 Mobilization (No Charge) 0.00 Any unforseen materials and labor will be charged accordingly. Tota! $5,020.00 I have accepted this proposed estimate: Signature Printed Name Title Date: THANK YOU FOR YOUR BUSINESS! SZOHEDULE OF UNIT PRICES LILLESKOGEN CONCRETE WORK CITY OF SCANDIA, MINNESOTA BMI PROJECT NO. 15.106565 BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices: NOTE: BIDS shall include sales tax and all applicable taxes and fees. BIDDER must fill in unit prices in numerals, make extension for each item, and total. CY (LV) = Cubic Yards, Loose Volume CY (CV) = Cubic Yards, Compacted Volume (Measured in Place) (P)=Planned Quantity Basis of Measurement ITEM APPROX. UNIT NO. ITEM QUANT. UNIT PRICE AMOUNT 1 TRAFFIC CONTROL 1 2 MOBILIZATION 1 3 REMOVE CURB & GUTTER 170 4 CONCRETE CURB & GUTTER 170 5 REMOVE BITUMINOUS PAVEMENT 35 TOTAL AMOUNT: LS LS LF SF •r" I 75 T 1'33�5v "-5�©ZOJ SCHEDULE OF UNIT PRICES LILLESKOGEN CONCRETE WORK CITY OF SCANDIA, MINNESOTA BMI PROJECT NO. 15.106565 BIDDER agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices: NOTE: BIDS shall Include sales tax and all applicable taxes and fees. BIDDER must fill In unit prices In numerals, make extension for each item, and total. CY (LV) = Cubic Yards, Loose Volume CY (CV) = Cubic Yards, Compacted Volume (Measured In Place) (P);Planned Quantity Basis of Measurement NO. ITEM QUANT. UNIT 1 TRAFFIC CONTROL 1 2 MOBILIZATION 1 3 REMOVE CURB & GUTTER 170 4 CONCRETE CURB & GUTTER 170 5 REMOVE BITUMINOUS PAVEMENT 35 TOTAL AMOUNT: LS /Joe LS 1 `' LF LF �a �r sy. . v R Fli(& Z00 5- L Lzo6 ;-- t�