Loading...
6.a) Background Info on Yard Waste Composting _ � ' �. � 1 � 4 1 i �� �`,, ': � � , .,:'''```���".a�' a ��� � / � / : ��. .r',..._ .., ��'..._ �� �/`� � , �'� �e .-�1 � � `� ��. f / ,_r .j . _. -.. . ' . ., / i_. ,, " .,�9"-���.�T�.�. �� Memo - � - To: Parks and Recreation Committee From: Anne Hurlburt,City Administrator Date: May 29,2012 for June 4,2012 Meeting Re: Background Information on Yard Waste Composting Attached you will find the following information as background for your discussion of yard waste composting. Items 6 through 11 are new items that were not provided to the Committee for the May meeting. 1. E-mail message from Beryl Haldorson to Mayor Randall Simonson (4/14/l2) 2. E-mail message from Doug Thomas, Comfort Lake Forest Lake Watershed District Administrator to Mayor Randall Simonson (4/16/12) 3. E-mail message forwarded from Adam Frederick,Washington County(Website Links, 4/12/12) 4. Letter from Wayne Moe(5/7/12) 5. Yard Waste Compost Facility Siting and Management Considerations, Minnesota Pollution Control Agency,November 2006 6. Excerpt of Scandia Development Code, Chapter 2, Section 4.31, Standards for Yard Waste Facilities 7. Map 13, 2007 Land Use by Parcel (Scandia Comprhensive Plan,page 48) 8. Map 14, 2007 Land Use by Parcel, Scandia Village(Scandia Comprehensive Plan,page 49) 9. Map, Existing Park and Recreation Area(Figure 3-2,New Scandia Township Parks, Trails Open Space and Recreation Plan, 2005) 10. Compost Sites Directory, Washington County 11. Composting Information,Chisago County � � -- ,_ � ���_��.� � � �th-t Anne Hurlburt From: Randall Simonson [r.simonson@ci.scandia.mn.us] S�nt: Monday, April 16, 2012 10:55 AM To: Anne Hurlburt Subject: FW: compost site Anne i have two more emails being forwarded to you concerning this, she wants me to bring it up at the Council Meeting, because our meeting times are in conflict with her schedule. RS From: Beryl Halldorson [mailto:b halldorsonCa�hotmail.com] Sent: Saturday, April 14, 2012 12:36 PM To: r.simonson@ci.scandia.mn.us Subject: compost site To: Mayor Simonson and the Scandia City Council From: Beryl Halldorson, resident of Scandia on Bone Lake Proposal: A public cornpost site in Scandia One Reason: To prevent phosphorus from decomposing vegetation running into Bone Lake and other waters There are many environmental benefits of composting. On the back end of the process is the value of the resulting compost. On the front end, which is my main concern, is a safe place to deposit plant material so that the decaying nutrients will not run into our waters. I live next to a stream, a wetland and a lake. I have tried to find a place for leaves, garden trimmings, grass clippings, curley leaf pond weed (which I try to take out of the lake), etc. where I HOPE the nutrients won't run back in the lake. I would like a place where I KNOW that won't happen. I consider Bone Lake a 'yewel" in the city of Scandia. It is, however, on the "impaired" list because of the water quality, mainly due to too much phosphorus. The watershed district is finally taking some steps to try and improve it. I think it is the duty of all citizens to try and keep our water clean. Right now there is no safe place to deposit material so that the phosphorus from decomposing will not wash into the lake. I am forwarding some information from Adam Fredrick, who is with Washington County Public Health and Environment. I will be happy to get more information for you if you decide a compost site is a good idea. I know cost is always an issue. However, it would probably be open for a limited number of hours a week during the spring, summer and fall. Perhaps voluteers could be used for monitoring. I would be willing. Thank you for considering this topic. Beryl Halldorson 23620 Melanie Trail Scandia, MN 55073 651 433 3959 � ' � / Anne Hurlburt From: Randall Simonson [r.simonson@ci.scandia.mn.us] S�nt: Monday, April 16, 2012 10:55 AM To: Anne Hurlburt Subject: FW: Composting Rutes and Application _ _ . _ _ _ From: Beryl Halldorson [mailto:b halldorsonCa�hotmail.com] Sent: Saturday, April 14, 2012 12:39 PM To: r.simonson@ci.scandia.mn.us Subject: FW: Composting Rules and Application From: Adam.FrederickC�co.washington.mn.us To: B hatldorsonC�Hotmail.com Subject: Composting Rules and Application Date: Thu, 12 Apr 2012 21:23:55 +0000 This website should have all the correct links. http•//www pca state mn us/index php/waste/waste-and-cleanup/waste-manaQement/commerical- composting/compost html?menuid=&redirect=l Try these httQJ/www pca state.mn.us/index.php/view-document.html?Qid=5673 httQ•//www Qca state mn us/index phpJview-document.html?gid=5675 Benefits of composting http•//www epa Qov/epawaste/conserve/rrr/composting/benefitr.htm i li:-���i-��l �'��. `�t� F�,��)�.,- 'I'-�{`��, -' TdL7�_F_+ah � . , E[VED � � ; � � r�aY � 7 7a�� � � � .. � --�^^ GITY OF SCAN�1,4 � ��`�� � T� �`��' � __ �Or✓C��� _ .r_ �'1 f�p�,�-n-n-1�' --�s r�/�-v�E /�o� � � --- _ _.. ; —.. ' ` .-�" � �'-�"r�l�-�/� /4��.����'� �/!� �r.1�P��i'/�L� -- ��U�n1 7''�/f�`� C or�I�=Cr�T ��f/�� �a��s� ` :, �►�-K�' �'✓r�r�R 5 r��/� � �5 ��'�G T ..�5 �" _ �. _^ ; -��-/�e���/� a �" c.�'J��-��C.�`� ��CK .z' ��� ; �� - _... �- 1...-Q ��~~� .�„�" �-r-�O/1�°` (�CJ� t �`l� _��lPT L .___��4-GGIaI]��G,/1F'i �(..� �S C� ---r� � ��,�vr�-�m �'��.�1J�NT���'�L � � �_��� (��3� (,�� � �r (.��6� � R ����'�' ..._w- "-�Q /-�"���l�P�l� Co�a���� s0 _ �..���"S �}-itl-� �//E"%�-5 S C�..�IJ���� C o�L� � P�r� k ��,.�� ���� ��. ��,���s . � ��� _v= f��� _.. ��J� u��-� ��o �J .. lVl l�4� �� 7"�fC ��� Co� L_!� Loo �' �a� �- .S J�' '��-�C.-� �i� �Q S 5.�� L 't'' `��"� e�.f � r—�R S �,D ���:S-r�'�C� ..�_. t�P��1�� t,t��� t� �l-��'` ��?J� d� �S�M�r .__ : ���.� _ , - o s�s ,4-�5 �i��� u�oU�.,4 ��iv�F.�T �,v��-r� CC�v�-cs-��' �i�f� ���'.�c� _�o C��'%i-�c� � P �D UG/�,��� �a� �- �i`�a/�'I� LLF"�c,tJD -- Q ,r3'»iJ� �%��-%�,ri�� ._ -� -_ .._� __...._ .V_ ��"� rJ� / _ _. _. . �i�� ;!�'� , JC � �'� �4 : Yard V1�aste �ompast Fac�lf�y Sit�ng � . . ;��� ac�� N��n��em��t Cans��eratior�s I�Vinnesot� Poilutia� Controi w-sw1-03•November 2006 Ag�nCy To be good neighbors,yard waste compost facilities in Minnesota should consider the following practices in addition to following the State compost rules (Minn.R 7035.2836, subparts 1-3)and any local requirements. The "best management practices (BMPs)"listed here are simply suggestions for yard waste compost site operators to consider. They do not carry the force of law, rule, or policy. Nor does the MPCA expect that site operators will implement all of these practices at every yard waste compost site. Some recommended considerations are: Siting snd Design: � When selecting a site,enswe that site location,size,and design are appropriate for the 1 � ` t �= volume of compost to be managed;or only manage an appropriate quantity of waste for �'^�� 4'� � � ��"�-�`� the size of the facility and the type of equipment that will be used on site. , , � ���� � =,`. �"'- � , - ' � �i � Ideally, in order to minimize concems,complaints,or disruptions in residentia] '�""" nei g hborhoods,local governments should encourage siting facilities in areas zoned for � � j��r�� commercial or light industrial activities. '"` � � In evaluating a potential site,and when detetmining site size and configuration,consider ����`' � � the potential effects of prevailing winds on odors, dust,noise, and other nuisances. �' � If it's necessary to locate a facility near residences,consider setback issues carefully. �.�s � � When upgrading or expanding a facility,consider proximity to residences/businesses. • Ensure that proper perimeter controls are in place at the site--whenever possible,plant trees,and provide fencing as buffer and screening(these measures serve several funcrions, such as securing the site from illegal dumping,reducing blowing trash,and providing aesthetic benefit). It may be possible to reduce necessary buffer areas by adopting proper management practices,enclosure,or mechanization of the facility. • Ensure that the site is not in a 100-yeaz flood plain,or on shore land. • Ensure that the staging area is large enough to accommodate the types of vehicles and traffic levels expected. � Select surfacing materials,either natural or manufactured,that reduce infiltration of surface water. � Ensure that access roads are adequate for the sizes of vehicles likely to be traveling to and from the site,and that they are accessible when the site is operating. >s � � ��?,.`".�' On-site Management: ,, r�� • Develop and maintain an operating plan for the site. Y���. ��#;¥""� • Develop a contingency plan for the site that will outline processes to be followed in case ���� �' ,:�»: ��k� ����.� =� problems arise. � � f` • Post permanent signs explaining hours of operation,rules for site use,and listing a _;�+'���� ' telephone number for communicating complaints. _���c+aari r�� °' AK` ��'��� � Im lement controls to limit unauthorized access.This will hel revent ille al dum m ,�; � +u �$ � P PP g P g �� and increase site safety. ` Ensure that adequate personnel and equipment are on site as needed. 1 Minnesota Pollution Control Agency• 520 Lafayette Rd. N., St. Paul, MN 55155-4194 ` Minnesota Pdlutbn www.pca.state.mn.us•651-296-6300• 800�57-3864• TTY 651-282-5332 or 800-657-3864 r�� �ontrol Agency Available in aftemative formatspage �==.' Yard Waste Compost Facility Siting and Management Considerations � Routinely inspect for unacceptable materials. � Ensure that clear space exists between windrows or other piles to accommodate equipment necessary for site operations and emergency vehicles in case of an emergency. ` Try to achieve and maintain composring process efficiency;this not only will contribute to efficient use of site space,but also will help to control odors. � To promote the proper composting process and to prevent odors: o maintain a proper degree of porosity(65-70%initial porosity)so that oxygen levels are adequate(refer to the University of Minnesota's five-gallon-bucket test at http�//www.extension.umn.edu/distribution/horticulture/components/3296- Ol.html#02); o Keep moisture levels at 40-60%moisture content by weight; and o Maintain the pile or windrow temperatwes near the 130-140°F.range. E Cure compost for one month or more to stabilize the finished product. � Turn windrows/piles at least every six months—some composting guidelines suggest that at least four times per year is ideal. o Employ dust suppression methods when necessary,especially when disturbing compost. ` Ensure that compost site operators are lmowledgeable conceming applicable rules, regulations,and site operation procedures. � Ensure that on-site management capabilities(e.g.,staffing and equipment)are adequate for the volume of compost to be managed at the site. � A water supply is recommended for maintaining proper moisture levels,and for suppressing dust and any on-site fires. ` Divert run-on around composting areas,and consider unplementing BMPs such as setbacks,grassy swales,or rain gardens. • Sites must comply with stoimwater regulations. � Maintain site surfaces and proper moisture levels in composting windrows and/or piles in a manner that prevents area soi] surfaces from becoming saturated for extended periods. Nuisance Control: � Establish acceptable hours of operation,considering nuisances that could arise from equipment noise or traffic(e.g.,8 a.m.-dusk). � Site managers should consider establishing an"Odor Committee"among local residents to provide for a process of responding to odor issues. � Develop a plan for minimizing odors,dust,noise,and other nuisances,taking into account time of day when turning should occur,the volume of compost,wind direction and speed,the presence of any atmospheric inversion,the maturity of the compost,etc. � Eliminate on-site ponding by filling in depressions with a stable fill material and re-grading.Attempt to collect and reuse leachate. � Process(e.g.,haul,place into windrows,move)compostable material within a � _Y�.� <<,°�� �` ' timeline that minimizes the risks of creating odor,dust,or other potential nuisances. :�`i�- ` Respond to all complaints in a timely manner. �� '" f-= • Keep site operations organized,and monitor site boundaries as necessary to identify any operational issues impacting adjoining property. �s ti �� � e ` Accept yard waste un-bagged or in biodegradable bags. :, _ , 2 Minnesota Pollution Control Agency• 520 Lafayette Rd. N., St. Paul, MN 55155-0194 " s Min�esota Pollutbn www.pca.state.mn.us•651-296�300• 800�57-3864• TTY 651-282-5332 or 800-657-3864 �:��'� �orrtroi Agency Available in alternative formatspage , �/, EFFECTIVE NOVEMBER 3,2010 amended lhrough June 21,2011(Ordinance 126) Chapter Two 0 Zoning Regulations (A) All amateur radio towers shall be installed in accordance with the instructions furnished by the manufacturer for the tower model to be installed. Because of the experimental nature of the amateur radio service, antennas mounted on such a tower may be modified or changed at any time so long as the published allowable load on the tower is not exceeded and the structure of the tower remains in accordance with the manufacturer's specifications. (B) No tower shall be located within public or private utility and drainage easements. (C) All towers shall be reasonably protected against unauthorized climbing. (D) Towers located closer to a property line than a distance equal to the height of the tower shall be setback as far as possible from the nearest property]ine. At a minimum, the tower shall comply with the minimum setback requirements of the zone in which it is located. (E) No part of any antenna or tower, nor any lines, cable, equipment,wires or braces shall at any time be located on or extend across or over any part of any right-of-way,public � street,road,highway, sidewalk, utility or drainage easement or property line. 4.3] Yard Waste Facilities. A yard waste facility shall comply with all of the following standards: (1) The minimum lot area required for yard waste facilities is 10 acres. (2) Composting,storage,transfer, loading and processing activities shall be set back as follows: (A)Property lines l00 feet (B) Existing residential uses not on the property 500 feet (C) DNR protected watercourse 200 feet (D)Wetland 75 feet (3) The yard waste facility shall be screened from view from all adjacent properties and roadways according to the landscaping and screening requirements of this Chapter. (4) Access to the site shall be controlled to prevent unauthorized dumping during non-business hours. (5) A plan for collection,retention and drainage of storm water shall be provided for review and approval. The storm water facilities shal] meet current Nationa) Pollutant Discharge Elimination System requirements and employ Minnesota Pollution Control Agency's best management practices. (6) The materials which can be processed are limited to garden waste, leaves, lawn cuttings, weeds, shrub and tree waste and prunings. (7) The operator shall, upon request, provide information to the City specifying the volume of waste brought onto the property for processing or composting City of Scandia Development Code,Chapter 2 Page 2-92 EFFEC77VE NOVEMBER 3,2010 amended through June 21,1011(Ordinance 126) Chapter Two 0 Zoning Regulations (S) The operator shall provide sufficient equipment to properly manage the composting and processing activities.At a minimum this shall include a front end loader or similar machinery for loading, unloading,turning, and aeration operations; a shredder for reducing new material to a smaller particle size for faster decomposition; a source of water or watering trucks; and a screen to improve the quality and marketability of the final product. (9) The operator shall provide plans showing all equipment maintenance and storage areas. Plans shall show the location of all fuel storage facilities,hazardous material storage and hazardous waste disposal. (10) The decomposition process shall be properly managed and maintained in an aerobic condition to prevent all unnecessary odors. The yard waste shall be decomposed through a process that encompasses turning of the yard waste on a periodic basis to aerate the yard waste, maintain temperatures, and reduce pathogens. The composted yard waste shall contain no sharp objects greater than one inch in diameter. (l 1) Composting,processing and trucking activities shall be conducted only between the hours of 7:00 am and 5:00 PM,Monday through Friday, unless other hours or days of operation are specifically authorized by the City Council. Retail sales are allowed Monday through Friday between the hours of 7:00 AM and 7:00 PM and on Saturdays between the hours of 8:00 AM and 5:00 PM unless otherwise prohibited by the City Council. Retail sales for purposes of this section shal] mean the sale of product to individuals far persona] use and shall exclude commercial hauling. (12) Treated yard wastes shall not be allowed to accumulate for longer than three years before being finished and removed from the site. Compost that cannot be marketed shall be removed from the site a minimum of once per week. (13) Woodchips, sawdust and composted materials shall be processed,kept and maintained in a , manner that does not permit ignition by spontaneous combustion. (]4) By-products, including residuals and recyclables,shall be stored in a manner that prevents vermin problems and aesthetic degradation. Materials that are not composted or processed shall be stored and removed a minimum of once per week. (]5) The owner shall maintain the site so that it is free of litter and other nuisances. (l 6) An attendant shall be on site during operating hours. (]7) The open burning and/or burying of waste is prohibited. City of Scandia Development Code,Chapter 2 Page 2-93 _ / r �t�-rtc'� Gt1::., (,"C��i�z+ia�»tt�g C.4tr�dlx%"�<.-2� �i�CftG fc'iGtCzaaC,� �� (/Z�IL'�i'L�/�'Ni V'd�'1t���iLt/KJ1't/�� �I Map 13 - 2007 Land Use by Parcel �itX of Scandia 2Q0��2030 Compr�hensive Plan �� ` • CHISAGO COUNN 40lh St N ^ � ._. ._ .,1a,�--._.,,_.._... ._...�__.___ .__._.._.. .�_ ._.. .._ .,=,�,pe,,,�,.� � —� ' v�wsHiricTONcouN�v ��� � �. � ,�• f _ _ sr��t.� � .�.e�y* �"� i Z ��, g..,.� ' m E� ,. - O �� �:'�isar�.Le-� 301h Sl N ,j � 2281hStN `•� a OP�qP � � �}�1 � \ ,L : � �_ R �, '� I . f �15Ai z °^�� �I -1 �„ \ 7 1 !. �'� � � 2 \ �'� :,�' _ .\ .,sr Lak� `r � "� i f � � p ' ' z �n � � 7'IH a °�4�. ^Sh � o N p 1 0 �R�I � �o _ �� o �Zi, � . �, ` � � ? � ._�_. 2 ( L �� 2 9 o F � � " Scandia lr N a - `#�f I � � Z �'� 1 � �. 'ahrr a, E �� � z ti������ o����� ���� � �1= ? ,` � � Oakhtll Rd N z 14.- I �e`` Q � :��_ m� _ : . .. < 1'6 °' 3 <a P2 � - 1 � 6 � � � d�a9a '�, ,u�,_a.� � . - � O �a Mari E r N I� 4 50 ,. , I �� 8��h sr ti � �� d l ` c.j �\ c � �85 � `�; .....� f Z I UI • ~ > ( 2 m Q �c c .. , : ' Q.. �� f . _ ; � c -... .. ... . _.__..�.._ ' .._,..�,._.._.. .._G "_"_"�" '_"'-(t " � v, � a 'S���m � g`D �77th St N lh S�N ' m D m r Z I ! N �QO� Land Us� by Parce�l W�E Agriculture �` Commercial Recreation � _�% Road S Single Family Residential � Industrial Utility Multi-Family Residential Institutional and Civic Other � Seasonal �`;" Parks and Open Space Miles - Commercial � Extractive �ac� sou�ces: Metropoli:an Council, MN DNR, Washington County Land use derived from Washington County Assessor's tax classifications. Additional dassification prouping done by Cuningham Group. May 17, 2C08 /����TT�T A ! �Y �l�rit�l LLt1 �us�l�in �t�ni�J2c��u�14 t�t�r. ��[t�1 0 �" 1 �'-•r'coil� G��1+'-, �if�?i��i�a�ait��� (,��2.�zrfi,i:2� s�iiC�u. ,��_af?t�c;9 .. �'Lt�Z���'Q7'l.�`�W�D4'1/J' Map 14- 2007 Land Use by Parcel, Scandia Village City of Scandia �008-2030 Compreher�sive Plan �� Scandia Tr N � \ �" 1 �52� \, - 4�: „:� '`. � � � ��_ , �� � _..�.�_r.�.�.._,(.,�•—m—....; � �,�.., . Location in Scandia� ���` :, �; �I I, I � � '�� i' ;;� �����•_ � �; � k �,�.�¢� �; �'�� \. 3007 Lanci Use by Rarc�l - Scandia Villag� N W�E Agnculture � Commercial Recreation �� _'' Road S Single Family Residential � Industrial Utility Multi-Family Residential Institutional and Civic Other o zoo�400 boo Seasonal Parks and Open Space Feet � Commercial � Extractive Data so��ces: Metropolitan Coundl, MN DNR,Washiogtor County �anc u=e denved fro�r,Wash�ngton Co�nty Assessor's tax classifications. Additiona�classification group�ng dcne by Cuningham Group. May 17, 2008 c^ ' �; � _��,ut,� ���„�,w/w���ti�z: f �.z�� SC,�S.ND1A 5�� . G Y r Q ,^ � a � � . v/ a rn a Z Q W -` `m o � _ _ Q W °� _ �o� � Y � �. � �° 3 �„� �C � � � c � A' l0 t� � ,r �d T � > � p�'�2` �q i \i � o y c rn � y >=aw a�a� `� a d �w N c LL O n o o m � y _ E�c`� mmm� r ' _ `o � o F� � Li. a a a u 2 .t o m o� � �� � t0 d !n U � n a o� u z � m A^' F, w � ���� o vi t o c � pyc-` Q3Qa o R w� � d N c 3 d �`c � a � ZN V c a 7 � .1 �L,U'��e �1�a m Q .+C G W ` O � a m Z ° �'�� ��"�' a � '_� � � � = o � d o � � N ��a a � �a � 3 N d � C U � .N � o m co o e' M J ,- �� V � � � �� o � z 3 in �i a in a � � a='�e w v X W - " � u � taaao�, o � �:r� � � 0. 0 omaa � v� W � ��8_ � a o �: z c E So � �,. t�.. »a i� �n ,�t_�, �� g� �� F ,., � ����,�- � � , �� �:, ;. _. ��,� " ��. aa � my o- � Ea S6�N ejp�S 3� z �b' � N I Y q I my � £p N O� � F�a a m �� lv Ex _�`` �g, � Sm uz o� mg s " �LL � 3 a`' s� �� u Q- p` �'3 ai �y� ur Olinda Trail NoAh �� Q9 � _�: 3'F 4uoN Ile�l ewi W PIO 4` i m m e°ma= � m� o` Z � � o�errea n�e N � :% � �m �9 oasY "Y �- z � .�� 3 �> r,s S a = .. w =� c@ �� sE N �� "s � c �� E Y M z � � 4WNN�+lePu!Ip ,. Z °°- W z' �� c3i �� i= � � `n � _E !n ,,F s � x �� �� =d� �` � N a a �°� P,ea �, � �i a� � '�� m� �u �� N �� �j �c z � €� � Meadowbrook Ave N � _ � � � �� ! •.��,: � rv �� �� �, � � ,` c �' � 'i �•;`'� '" �'L � r,:. '� � � ,� �.. �� f � f`-'- q� �Q � ; �o c' . m =E' .. „ C� q . na �n' r� Z N �£ �p� � .{�..' 1 .t. y p / a� @ � N �(t W C �U �'.. . . �` ��h - �°N 1!e�j 6uiuuey,� �` " �a �. m� � ! �,/ / � o Compost 'The sites li�ed are n�ot owned�r operated � b Washin ton Count � N � � . Fees may apply. Contact compost sites for � .S7teS � details. a--� �a, cn ,� Materials � a Materials Accepted Available a = �, � � � y O � ��" o �4� V �.f_ /�l Dh O Qr O h y � y =l. � (� •Q �'-`,' F� �'� �„ � Q � 3� �D v • �`Jh �Cy��y vQ� v� Q,CC4ywJF���� ��.y � �00 V � ` •� s Ba yport R�ver City Services 201 2nd Ave 5....651-430-2809 X X X X X X X X X (Open to all counry residents) Cottuge �rove Location: 9600 Glendenning Rd ,,,RumG�ca Companie�, inc X X X X X X X X X ...651-459-1556 Open: April 1 - December 1 See Websi[F� for Hnuis of Ope�ation (Open all county residents) = Forest Lake b v � Location: � ...20001 Forest Blvd N a ...651-982-9273 X X X X X X* X° = Open: April-Mid-November � � Call for Hours of Operation H � v, (Open only to residents oj Forest LakeJ y O tf1 � C � L o f�U�C) � � 3 �+ Lotation: West of Highway 61 � � on 170th St N....651-429-6676 X X X � a Open: Mid-Aprit-Mid-November Call for Hours of Operation � (Open only to residents of Hugo) = Mc�rirre an Sainf Croix � N Location: North on Highway 95 n next to the community drain- � field...651-433-3636 X X X � � Open: April- October � Call for Hours of Operation � (Open only to residen[s of Marine) .N N � C � Did You Know? c � To tearn more about backyard c composting and compost bins,check out the N following websites: 3 ,�,w�; RethinkRccyclin�; ;or�� vr,�rw redurc ure *Branches up to 3"in diameter °While supplies last N � Compost "The sites listed are not owned or operated � � by Washington County � � � � ����� Fees may appty. Contact compost sites for � � details. N � Materials O a Materials Accepted Available � _ �, � —� �� Oh Q � � Qry Q � D � V ` � '�` a`' 3� � �° a i�� �y � Ch N � �� QrD �! �r ,l. y h � ,Q�y Q Q ,vQr � .h (�j a Jy C �Cy �Q' �C F J� y�p �y C j p0 Q1� C� C9� v v 4� y� �� �� <C" � 3 NE'W�301'� Location: 1100 Bailey Road at SterlingAve....651-459-2475 X X X Open: Mid-April-Mid-November Call for Hours of Operation (Open only to residents o(Newport) Saint Paul F'ar� Location: Next to Riverside Park on 13th Ave,west of 3rd St....651-459-9785 X X X X* X X Open: Mid-April-Mid-November � Call for Hours of Operation � v (Leaves ond grass accepted jrom Saint Paul Park � &Grey Cloud residents only.Brush occepted only � Jrom Sain[Paul Park residents) � Stillwater � � Lotation: Buberl Recyding f�Composting o � 5750 Memorial Ave N (behind Stillwater o � Motors, and west of entrance to Stillwater N � High School)....651-439-8399 X X X X X X X X X X b ? o � Open: Year-round "3 � Call for Hours of Operation 3 � (Open[o al!counry residents) 3 a Waadbury � Location: 4600 Cottage Grove Dr 'S ....Composting Concepts X X X X X X X X° X° � ....651-436-1213 f6 Open: April- November a Call for Hours of Operation N � (Open to anyone jor yard waste and brush) iC d �� Did You Know? a� � � To learn more about backyard � composting and compost bins,check out the o following websites: U �,�:-rr Er�tl��i�Rr ���:lin�• ��,,�� � w'ww te�duce.org O y-+ Cn C L N � 3 *Branches up to 4"in diameter °While supplies last Com ostin �` � � p g In Minnesota, it has been illegal to put yard waste into the garbage since the early 1990's; it takes up too much valuable landfill space. A much better solution for yard waste is a composting bin or facility. The Chisago County Solid Waste Ordinance allows residents three composting options:home compost,self-haul to a compost facility, or hire a hauler to take it to a compost site. If you hire a hauler, the ordinance prohibits placing yard waste in black plastic bags;it must be placed in a compostable bag. The landfill ban on yard waste prompted many municipalities and business to create compost sites to serve their residents and customers. City Compost Sites Open to Residents: • Chisago Lakes Joint Sewage Treatment Facility,31705 Lofton Ave N.,Chisago City. Serving the cities of: Chisago City-(651)257-4162 Lindstrom-(651)257-0620 Stacy-(651)462-4486 • North Branch Sewage Treatment Facility,near the Industrial Park on Ash Street,(651)674-8113 • Rush City,(651)358-4743 • Shafer,Sewage Treatment Facility,(651)257-4726 • Taylors Falls,Sewage Treatment Faciliry,(651)465-5133 Compost Sites Open to All Chisago County Residents for a Fee: • ECSWC Transfer Station,South side of Highway 95,east of Cambridge,(763)689-4056. Brush onlv for a fee. Open Friday 8:00 a.m.-4:00 p.m.and Saturday 8:00 a.m.-12:00 p.m. • SRC Inc.,6320 East Viking Blvd.,Wyoming.(651)462-5298.Monday—Friday,8:00 a.m.-4:30 p.m.,and Saturday 8:00 a.m.-12:00 noon.www.mvtrashservice.com Compost site and brush pile open to the public for a fee. How to Compost at Home Home composting is easy and requires little time or money. Finished ,yr compost makes a great soil enhancer for the garden,adding organic matter 'J to loosen up clay soil,nutrients to sandy soil,and helps retain soil moisture � around flowers,shrubs,and vegetables. �r�r -- ', Compost bins can be found at your local home improvement or garden ��� store, as well as online. Prices start around fifty dollars up to several i , hundred dollars,depending on features. `� ►: You can also build your own composter using lumber or wire fencing. One of the easiest designs uses 4'high wire fencing. Create a circular enclosure ,, with the fencing approximately four feet in diameter. Cut the fencing, t ��'�� leaving the ends sticking out so you can bend the wire and connect the two .�- ends, creating a circle. Or,you can just use the "pile" method without a bin. Your pile should be between 3'x 3'x 3'and 5'x 5'x 5'. For the compost ingredients,start with a layer of sticks'/,"or smaller in diameter to create an air layer. On top of this, layer green matter over brown for a number of layers; you can also add a layer of dirt in order to get more microbes into the pile. The green layer supplies the nitrogen and consists of fresh grass, green leaves, plant trimming, and kitchen wastes (coffee grounds, tea bags, fruit and veggie scraps). The brown layer supplies the carbon,and consists of dried grass or leaves,straw,wood chips or twigs no larger than'/.". Do not mix meat,dairy, pet waste,diseased plants,weed seeds,or wood/coal ash into your compost bin as these items cause problems. In order to keep the bacteria and fungi alive to"cook"your compost pile, make sure it stays moist by occasionally watering it. Turn it with a pitch fork one to two times a month to keep it composting evenly and to reduce odors. A summer pile will take 4-6 weeks to finish. You'll know iYs done when the pile looks dark and crumbly and has a nice earthy smell to it.