4. Lilleskogen Parking Lot Cost Estimates � � Sii�y/G ��esS Lilleskogen Park SRF Consulting Group,Inc. City oi Scandia May 12,2011 Parking Lot Cost Estimate Project No.7419 UNIT LEGENDS: LS=Lump Sum,SF=Square Feet,SY=Square Yards,EA=Each, LF=Lineal Foot,FF=Face Feet,CY=Cubic Yards Lilleskogen Park-Parking Lot(Single Access Point Concept)Cost Estimate-5/12111 Estimated Unit Cost Total No. Section 1-Site Surve in IRemovals Qt . Unit in Dollars In Dollars Provide all necessary construction surveying and staking to meet 1 layout and grading requirements for all facets of paving and site 1 LS $1,000.00 $1,000.00 im rovements work-com lete. 2 Remove concrete curb and gutter-complete. 65 LF $5.00 $325.00 z Clear and grub trees as shown and as required to construct �5 EA $200.00 $3,000.00 ro osed im rovements-com lete. 1-Site Su otai Estimated Unit Cost (in Total No. Section 2-EaRhwork Qt . Unit Dollars In Dollars On-site earthwork as required to achieve plan grades and an on- site balance-complete including 1)misc.tree removal 2) stripping,stockpiling,respreading,and fine grading of topsoil;3) 1 common excavation of subsoil materials to achieve subgrade 1 LS $5,000.00 $5,000.00 elevations required to construct parking lot,curbing and walks 4) grade maintenance and tree protection as necessary for the duration of construction;5)use of erosion control measures Totd i Estimated Unit Cost Total No. Section 3-Site Utilities Qt . Unit in Dollars In Dollars � Furnish and install outlet pipe including connection to existing 50 LF $28.00 $1,400.00 catch basin-complete. 3-Sks UtlNtNs Total Estimated Unk Cost Total No. Section 4-Bituminous Concrete Pavement and Boardwalk �t . Unit in Dollars In Dollars 1 Furnish and install bituminous pavin for parkin lot 553 SY $25.00 $13,825.00 2 Furnish and install bituminous avin for 6'wide trail 90 SY $20.00 $1,800.00 3 Furnish and install edestrian curb ram 1 LS $450.00 $450.00 4 Furnish and install B6-12 concrete curb and utter 245 LF $12.00 $2,940.00 �; 6 Comx�ba. �^�: w^�. Estimated Unit Cost Total No. Section 5-Seed/Sod Qt . Unit in Dollars In Dollars � Furnish and install Type 1 seed as shown on the plans- 0.5 AC $3,500.00 $1,750.00 com lete. 2 Furnish and install sod as shown on plans and details-complete. 100 SY $3.50 $350.00 Sectfon 5-Saed/Sod Total Total Estimated Construction Cost E31,840.00 8%Contingency $2,547.20 otai EaWnited Construction Cost with 8%Coot °�,: Estimated Unit Cost Total No. Akernate Items Qt . Unit in Dollars In Dollars � Upgrade cost to furnish and install permeable pavers in lieu of 4,977 SF $5.25 $26,129.25 bituminous avement within arkin lot. 8%Contingency y2,090.34 otet �— LooP ,t�-iv� Ceh ceP� Lilleskogen Park SRF Consulting Group,Inc. City of Scandia May 12,2011 Parking Lot Cost Estimate Project No.7419 UNIT LEGENDS: LS=Lump Sum,SF=Square Feet,SY=Square Yards,EA=Each, �F=Lineal Foot,FF=Face Feet,CY=Cubic Yards Lilleskogen Park-Parking Lot(Loop Drive Concept)Cost Estimate-5/12/11 Estimated Unit Cost Total No. Section 1-Site Surve in /Removals Qt . Unit in Dollars In Dollars Provide all necessary construction surveying and staking to meet � layout and grading requirements for all facets of paving and site 1 LS $1,000.00 $1,000.00 im rovements work-com lete. 2 Remove concrete curb and gutter-complete. 116 LF $5.00 $580.00 3 Clear and grub trees as shown and as required to construct 30 EA $200.00 $6,000.00 proposed improvements-complete. ��-snA a�s ra� s� .... Estimated Unit Cost (in Total No. Section 2-Earthwork Qt . Unit Dollars In Dollars On-site earthwork as required to achieve plan grades and an on- site balance-complete including 1)misc.tree removal 2) stripping,stockpiling,respreading,and fine grading of topsoil;3) 1 common excavation of subsoil materials to achieve subgrade 1 LS $5,000.00 $5,000.00 elevations required to construct parking lot,curbing and walks 4) grade maintenance and tree protection as necessary for the duration of construction;5)use of erosion control measures Total Estimated Unit Cost Total No. Section 3-Site Utilities Unit in Dollars In Dollars � Furnish and install outlet pipe including connection to existing 50 LF $28.00 $1,400.00 catch basin-complete. 3-Ske Uti�tles Total 1 .00 Estimated Unit Cost Total No. Section 4-Bituminous Concrete Pavement and Boardwalk Ot . Unit in Dollars In Dollars 1 Furnish and install bituminous paving for parking lot 729 SY $25.00 $18,225.00 2 Furnish and install bituminous paving for 6'wide trail 90 SY $20.00 $1,800.00 3 Furnish and install pedestrian curb ramp 1 LS $450.00 $450.00 4 Furnish and install B6-12 concrete curb and utter 345 LF $12.00 $4,140.00 4-Bkuminous 8 Concrete Pavement Total 32{81'3.00 Estimated Unit Cost Total No. Section 5-SeedlSod Qt . Unit in Dollars In Dollars � Furnish and install Type 1 seed as shown on the plans- 0.5 AC $3,500.00 $1,750.00 complete. 2 Furnish and install sod as shown on plans and details-complete. 100 SY $3.50 $350.00 5-SeedlSod Total 100.00 Total Estimated Construction Cost $40,695.00 8°/Contingency $3,255.60 Total Estimated Constructbn Cost wkh 896 Contigency S43,g50.6p Aksm�e kems Estimated Unit Cost Total No. Akernate Items Qt . Unit in Dollars In Dollars � Upgrade cost to furnish and install permeable pavers in lieu of 6,561 SF $5.25 $34,445.25 bituminous pavement within arkin lot. 8%Contingency $2,755.62 oW m�o$