Jaren Johnson, Applicant Project No.: 18407.000
From: Evan Monson, Planner Routing:
Date: June 30, 2022
SUBJECT: Preliminary Plat for a Major Subdivision, Variance from setback requirements
from a Natural Environment Lake, and an amendment to the previously
approved Conditional Use Permit for the Tii Gavo subdivision to permit Tii
Gavo 2nd Addition
MEETING DATE: July 5, 2022
LOCATION: Outlots I, J, and K of the Tii Gavo subdivision - PIDs 28.032.20.42.0003,
28.032.20.34.0002, 28.032.20.42.0004
APPLICANT: Jaren Johnson - J. Johnson Development
OWNER: Big Marine Lake Development, LLC
ZONING: General Rural (GR), Shoreland Management Overlay
REVIEW PERIOD: 60 day period ends August 1, 2022, 120 day period ends September 30,
2022
ITEMS REVIEWED: Application and plans received June 2, 2022; additional materials received
June 14th
DESCRIPTION OF THE REQUESTS
The applicant is looking to subdivided three outlots in the Tii Gavo subdivision - outlots I, J, and K. The
proposed subdivision would create eight buildable lots that would be available for single family
development. The lots would all have access onto Meadowridge Trail North, which would be completed
as part of this proposed development.
The three outlots and the unconstructed portion of Meadowridge Trail North were platted out as part of
the initial approval for the Tii Gavo subdivision back in 2007. The development was approved as an
‘Open Space Design’ subdivision and a Planned Unit Development, which under the ordinances in effect
at that time required a Conditional Use Permit (CUP) to be approved with the subdivision’s Final Plat. As
part of the review and approval of the proposed plat for the 2nd Addition, the 2007 CUP will be amended
as well.
Tii Gavo 2nd Addition Staff Report July 5, 2022
Scandia Planning Commission Page 2
PROPERTY INFORMATION
Parcel description: The three outlots all are located along an unconstructed portion of Meadowridge
Trail North in the Tii Gavo subdivision. Newgate Avenue is located east of the subdivision, while
Lakamaga Trail is to the north. Outlot I is located between Rasmussen Pond and Meadowridge Trail, and
totals approximately 4.5 acres. A small wetland is located on its southeast corner. Outlot J is located
south of Outlot I, and totals approximately 3.5 acres. Outlot K is a long, narrow lot that is just under 3
acres in size; a wetland and drainage easements occupy portions of Outlot K.
Land use: None/vacant
Figure 1: Outlots I, J, & K shown in red, per City GIS
EVALUATION OF REQUEST
Comments on the Request
The submittal was forwarded onto city staff and other agencies for review and comment (engineering,
watershed, DNR). At the time of writing this report, staff and other agencies were still reviewing the plans.
Tii Gavo 2nd Addition Staff Report July 5, 2022
Scandia Planning Commission Page 3
Development Code Requirements
Previous Approvals
Under the city’s current Development Code, the subject properties are zoned ‘General Rural’ (GR), and
are also located within the Shoreland Overlay zone. The Tii Gavo subdivision was approved in 2007,
which predates the current zoning ordinance. Under the zoning ordinance at the time of the initial
approval for the Tii Gavo subdivision, the site was zoned ‘Agricultural’ (AG). The site at that time was also
within the Shoreland Overlay zone, though the version in place in 2007 predates the current Shoreland
Management regulations. The approval of the Tii Gavo subdivision was done as an ‘Open Space Design’
(OSD) subdivision, which was a special kind of subdivision request that allowed the site to have differing
lot design standards and increased density in exchange for preserving a certain percentage of the site as
undeveloped open space. Having been zoned AG, the ordinance at the time required at least half of the
site to be preserved as open space. These areas are located throughout the subdivision today, and
preserve wetlands, vegetation, and other features from being developed.
The approval of the subdivision in 2007 planned for 37 total lots to be developed in the subdivision, with
29 in the initial first phase. This was identified in the Development Agreement as well as the Conditional
Use Permit (CUP) approved as part of the project. The future eight lots that would bring the subdivision to
a built-out total of 37 lots would occupy the areas that are currently platted as outlots I, J, and K. The
applicant’s proposed preliminary plat creates eight buildable lots, keeping in line with the original approval
and plans for the Tii Gavo subdivision.
Preliminary Plat Design
The preliminary plat shows eight lots for development. The lots vary in size, as well as buildable area
(areas not within setbacks, wetlands, or easements). See Table 1 below. Block 1 corresponds to Outlot I,
Block 2 corresponds to Outlot K, and Block 3 corresponds to Outlot J.
Table 1: Proposed lots and sizes
Lot Size (acres) Buildable Area (acres)
Lot 1, Block 1 1.04 0.20
Lot 2, Block 1 1.04 0.37
Lot 3, Block 1 1.00 0.34
Lot 4, Block 1 1.40 0.50
Lot 1, Block 2 2.92 0.42
Lot 1, Block 3 1.00 0.65
Lot 2, Block 3 1.14 0.74
Lot 3, Block 3 1.38 0.86
These lots sizes are different than those found in ‘standard’ or ‘conventional’ subdivisions; as an OSD the
Tii Gavo subdivision was permitted smaller sized lots in order to preserve land in the development as
open space. As a result of the smaller lot sizes, the setbacks in the Tii Gavo subdivision are also less
than the typical setbacks required; these are shown in Table 2 on the following page.
Rasmussen Pond is located north of the site. As a ‘Natural Environment Lake’, a structure setback of 200
feet is required from its ordinary high water level (OHWL). Phase I of Tii Gavo featured a 100 foot setback
from the pond’s OHWL; the applicant is looking to maintain that same setback on the newly proposed lots
as well in order to maintain consistency in design of the neighborhood. A variance is needed to permit a
lesser setback than is required. Without the variance allowing a 100 foot setback instead of the 200 foot
Tii Gavo 2nd Addition Staff Report July 5, 2022
Scandia Planning Commission Page 4
setback, the lots along Rasmussen Pond would have little to no buildable areas and each individual lot
would have to request a variance from the lake setback at the time of their development.
Table 2: Setbacks
GR zone
(current Development
Code)
AG zone
(2007 ordinance)
Tii Gavo
Front 40’ 40’ 30’
Side 20’ 20’ 15’
Rear 50’ 50' 30’
Infrastructure
The subdivision is served by a community septic system, which the new eight lots would also be served
by. Each lot would utilize wells for drinking water. The proposed new lots will all front Meadowridge Trail
North. The unfinished portions of the road would be completed as part of the project. Lot 1, Block 2, and
Lot 4, Block 1 are proposed to utilize a shared driveway, as shown by the access easement that runs
north between the two lots. Wetlands and easements prevent individual driveways from adequately
serving them. Lot 4, Block 1 has a Manage 3 wetland on it, while Lot 1, Block 2 has a Manage 1 wetland
on it. Drainage easements cover portions of each lot.
Parkland Dedication
Creation of new lots through the subdivision process triggers the park dedication requirements of the
city’s subdivision ordinance. This requirement calls for either land in the subdivision be dedicated to the
city for parks, or a cash payment in lieu of land be paid to the city. The Development Agreement from
2007 for the Tii Gavo subdivision noted a $1,500 parkland dedication fee is to be paid for each created
lot; for this second phase the cash in lieu fee required would total $12,000.
ACTION REQUESTED
The Planning Commission can do one of the following:
1. Recommend the City Council approve, with or without conditions
2. Recommend the City Council deny, with findings
3. Table the request for further review/study
RECOMMENDATION
The Planner recommends that the Planning Commission table the request, in order to allow time to